METHOD TO IMMERSE PILES IN SEASONAL-FROZEN GROUND
FIELD: construction.SUBSTANCE: invention relates to the field of construction, in particular, to the pile foundations from prefabricated driving piles, submersed at negative temperatures in seasonal-frozen ground. Method of piles immersion into seasonal-frozen ground includes preliminary drilling of wells with thermovibroleader in places of piles immersion, made in the form of cylindrical hollow bar with tip on one side and rigidly connected flange with opposite, on which vibration submersible is installed, with subsequent final driving of piles into obtained wells. Thermovibroleader is installed on mast of copra, which implements piling, on adjacent edge of pile hammer, between tip and rod there is adapter, which is rigidly fixed to rod, and connection with tip is detachable. Tip of the thermovibroleader has a cone-shaped shape, in the central cavity of which there is a heat-resistant insulator with a screw slot on the outer surface, containing a heating spiral with high specific resistance, a heat-resistant elastic gasket is installed between the insulator and the adapter to exclude axial movements of the insulator. On external surface of tip radially directed ribs with internal longitudinal channels are rigidly fixed, and in walls of tip there are transverse radially arranged holes. Before immersion of thermovibroleader the tip is heated and then submerged into seasonal-frozen soil with included spiral, and after soil development thermovibroleader is removed.EFFECT: technical result consists in improvement of efficiency of device pile foundations of buildings of prefabricated piles, submersed at negative temperatures in seasonal-frozen soil by reducing costs when installing foundations by preventing destruction of piles during their immersion through a frozen layer, as well as reducing values of deviations of piles in planned position, allowing to increase the speed of wells in frozen soils.4 cl, 3 dwg
Изобретение относится к области строительства, в частности к устройству свайных фундаментов из забивных свай заводского изготовления, погружаемых при отрицательных температурах в сезонно-мерзлый грунт. Способ погружения свай в сезонно-мерзлый грунт включает предварительную проходку скважин термовибролидером в местах погружения свай, выполненным в виде цилиндрической полой штанги с наконечником с одной стороны и жестко соединенным фланцем с противоположной, на котором установлен вибрационный погружатель, с последующей окончательной забивкой свай в полученные скважины. Термовибролидер установлен на мачте копра, реализующего погружение свай, на смежной ее грани со свайным молотом, между наконечником и штангой расположен переходник, который жестко закреплен со штангой, а соединение с наконечником выполнено разъемным. Наконечник термовибролидера имеет конусообразную форму, в центральной полости которого размещен жаростойкий изолятор с винтовым пазом на наружной поверхности, вмещающим нагревающую спираль с большим удельным сопротивлением, между изолятором и переходником установлена жаростойкая упругая прокладка для исключения осевых перемещений изолятора. На наружной поверхности наконечника жестко закреплены радиально направленные ребра с внутренними продольными каналами, а в стенках наконечника выполнены поперечные радиально расположенные отверстия. Перед погружением термовибролидера наконечник нагревают и затем погружают в сезонно-мерзлый грунт при включенной спирали, а после разработки грунта термовибролидер извлекают. Технический результат состоит в повышении эффективности устройства свайных фундаментов зданий из забивных свай заводского изготовления, погружаемых при отрицательных температурах в сезонно-мерзлый грунт путем снижения затрат при устройстве фундаментов за счет исключения разрушения стволов свай при их погружении через мерзлый слой, а также уменьшения значений отклонений свай в плановом положении, позволяя увеличить скорость устройства скважин в мерзлых грунтах. 3 з.п. ф-лы, 3 ил.
METHOD TO IMMERSE PILES IN SEASONAL-FROZEN GROUND
FIELD: construction.SUBSTANCE: invention relates to the field of construction, in particular, to the pile foundations from prefabricated driving piles, submersed at negative temperatures in seasonal-frozen ground. Method of piles immersion into seasonal-frozen ground includes preliminary drilling of wells with thermovibroleader in places of piles immersion, made in the form of cylindrical hollow bar with tip on one side and rigidly connected flange with opposite, on which vibration submersible is installed, with subsequent final driving of piles into obtained wells. Thermovibroleader is installed on mast of copra, which implements piling, on adjacent edge of pile hammer, between tip and rod there is adapter, which is rigidly fixed to rod, and connection with tip is detachable. Tip of the thermovibroleader has a cone-shaped shape, in the central cavity of which there is a heat-resistant insulator with a screw slot on the outer surface, containing a heating spiral with high specific resistance, a heat-resistant elastic gasket is installed between the insulator and the adapter to exclude axial movements of the insulator. On external surface of tip radially directed ribs with internal longitudinal channels are rigidly fixed, and in walls of tip there are transverse radially arranged holes. Before immersion of thermovibroleader the tip is heated and then submerged into seasonal-frozen soil with included spiral, and after soil development thermovibroleader is removed.EFFECT: technical result consists in improvement of efficiency of device pile foundations of buildings of prefabricated piles, submersed at negative temperatures in seasonal-frozen soil by reducing costs when installing foundations by preventing destruction of piles during their immersion through a frozen layer, as well as reducing values of deviations of piles in planned position, allowing to increase the speed of wells in frozen soils.4 cl, 3 dwg
Изобретение относится к области строительства, в частности к устройству свайных фундаментов из забивных свай заводского изготовления, погружаемых при отрицательных температурах в сезонно-мерзлый грунт. Способ погружения свай в сезонно-мерзлый грунт включает предварительную проходку скважин термовибролидером в местах погружения свай, выполненным в виде цилиндрической полой штанги с наконечником с одной стороны и жестко соединенным фланцем с противоположной, на котором установлен вибрационный погружатель, с последующей окончательной забивкой свай в полученные скважины. Термовибролидер установлен на мачте копра, реализующего погружение свай, на смежной ее грани со свайным молотом, между наконечником и штангой расположен переходник, который жестко закреплен со штангой, а соединение с наконечником выполнено разъемным. Наконечник термовибролидера имеет конусообразную форму, в центральной полости которого размещен жаростойкий изолятор с винтовым пазом на наружной поверхности, вмещающим нагревающую спираль с большим удельным сопротивлением, между изолятором и переходником установлена жаростойкая упругая прокладка для исключения осевых перемещений изолятора. На наружной поверхности наконечника жестко закреплены радиально направленные ребра с внутренними продольными каналами, а в стенках наконечника выполнены поперечные радиально расположенные отверстия. Перед погружением термовибролидера наконечник нагревают и затем погружают в сезонно-мерзлый грунт при включенной спирали, а после разработки грунта термовибролидер извлекают. Технический результат состоит в повышении эффективности устройства свайных фундаментов зданий из забивных свай заводского изготовления, погружаемых при отрицательных температурах в сезонно-мерзлый грунт путем снижения затрат при устройстве фундаментов за счет исключения разрушения стволов свай при их погружении через мерзлый слой, а также уменьшения значений отклонений свай в плановом положении, позволяя увеличить скорость устройства скважин в мерзлых грунтах. 3 з.п. ф-лы, 3 ил.
METHOD TO IMMERSE PILES IN SEASONAL-FROZEN GROUND
СПОСОБ ПОГРУЖЕНИЯ СВАЙ В СЕЗОННО-МЕРЗЛЫЙ ГРУНТ
GAJDO ANTON NIKOLAEVICH (author) / VERSTOV VLADIMIR VLADIMIROVICH (author) / KALITIN VLADIMIR VASILEVICH (author)
2019-11-25
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
Groundwater University Students Immerse Themselves
Online Contents | 1997
Scan, Immerse & Learn: VR Enabled Field Study
TIBKAT | 2022
|IMMERSE IMplementing MEasuRes for Sustainable Estuaries. Summary Report
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2023
|Performance and Design of Laterally Loaded Piles in Frozen Ground
Online Contents | 2016
|