METHOD FOR ERECTION OF MONOLITHIC MULTI-SPAN OVERLAPPING
FIELD: construction.SUBSTANCE: invention is aimed at creation of method for erection of monolithic pre-stressed multi-span covering of buildings and structures with minimum labor input due to possibility to use high-strength reinforcement, reduction of material consumption of structure at maintaining bearing capacity of covering. Technical result is achieved by the fact that in method, which includes formwork mounting, structural reinforcement laying, installation of embedded parts, concreting of covering, molding, laying of longitudinal working reinforcement and its tensioning on concrete, before concreting concrete into the formwork at a distance from the axis of support spans, equal to 1/3-1/4 of its length, insert parts are installed with mounted on them stops for fixing prestressed reinforcement, and after concreting and formwork of flooring, laying of longitudinal working reinforcement between embedded parts in span along lower surface of covering and in zone of supports along upper surface of overlap and performing longitudinal working reinforcement to thrusts of embedded parts, with subsequent fixation of voltage along upper and lower surfaces of covering in zones of maximum bending overlapping moments.EFFECT: disclosed is a method of erecting monolithic multi-span overlapping.3 cl, 6 dwg
Изобретение направлено на создание способа возведения монолитного предварительно напряженного многопролетного перекрытия зданий и сооружений с минимальной трудоемкостью за счет возможности использования высокопрочной арматуры, снижение материалоемкости конструкции при сохранении несущей способности перекрытия. Технический результат достигается тем, что в способе, который включает монтаж опалубки, укладку конструктивной арматуры, установку закладных деталей, бетонирование перекрытия, распалубку, укладку продольной рабочей арматуры и натяжение ее на бетон, до бетонирования перекрытия в опалубку на расстоянии от оси опор пролетов, равном 1/3-1/4 его длины, устанавливают закладные детали со смонтированными на них упорами для фиксации предварительно напряженной арматуры, а после бетонирования и распалубки перекрытия производят укладку продольной рабочей арматуры между закладными деталями в пролете по нижней поверхности перекрытия и в зоне опор по верхней поверхности перекрытия и производят натяжение продольной рабочей арматуры на упоры закладных деталей, с последующим фиксированием напряжения по верхней и нижней поверхностям перекрытия в зонах максимальных изгибающих моментов перекрытия. 2 з.п. ф-лы, 6 ил.
METHOD FOR ERECTION OF MONOLITHIC MULTI-SPAN OVERLAPPING
FIELD: construction.SUBSTANCE: invention is aimed at creation of method for erection of monolithic pre-stressed multi-span covering of buildings and structures with minimum labor input due to possibility to use high-strength reinforcement, reduction of material consumption of structure at maintaining bearing capacity of covering. Technical result is achieved by the fact that in method, which includes formwork mounting, structural reinforcement laying, installation of embedded parts, concreting of covering, molding, laying of longitudinal working reinforcement and its tensioning on concrete, before concreting concrete into the formwork at a distance from the axis of support spans, equal to 1/3-1/4 of its length, insert parts are installed with mounted on them stops for fixing prestressed reinforcement, and after concreting and formwork of flooring, laying of longitudinal working reinforcement between embedded parts in span along lower surface of covering and in zone of supports along upper surface of overlap and performing longitudinal working reinforcement to thrusts of embedded parts, with subsequent fixation of voltage along upper and lower surfaces of covering in zones of maximum bending overlapping moments.EFFECT: disclosed is a method of erecting monolithic multi-span overlapping.3 cl, 6 dwg
Изобретение направлено на создание способа возведения монолитного предварительно напряженного многопролетного перекрытия зданий и сооружений с минимальной трудоемкостью за счет возможности использования высокопрочной арматуры, снижение материалоемкости конструкции при сохранении несущей способности перекрытия. Технический результат достигается тем, что в способе, который включает монтаж опалубки, укладку конструктивной арматуры, установку закладных деталей, бетонирование перекрытия, распалубку, укладку продольной рабочей арматуры и натяжение ее на бетон, до бетонирования перекрытия в опалубку на расстоянии от оси опор пролетов, равном 1/3-1/4 его длины, устанавливают закладные детали со смонтированными на них упорами для фиксации предварительно напряженной арматуры, а после бетонирования и распалубки перекрытия производят укладку продольной рабочей арматуры между закладными деталями в пролете по нижней поверхности перекрытия и в зоне опор по верхней поверхности перекрытия и производят натяжение продольной рабочей арматуры на упоры закладных деталей, с последующим фиксированием напряжения по верхней и нижней поверхностям перекрытия в зонах максимальных изгибающих моментов перекрытия. 2 з.п. ф-лы, 6 ил.
METHOD FOR ERECTION OF MONOLITHIC MULTI-SPAN OVERLAPPING
СПОСОБ ВОЗВЕДЕНИЯ МОНОЛИТНОГО МНОГОПРОЛЕТНОГО ПЕРЕКРЫТИЯ
ASATRYAN VYACHESLAV GEVORKOVICH (author) / GULADZE TEJMURAZ ILICH (author)
2019-12-25
Patent
Electronic Resource
Russian
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Stonecutters Bridge-Main Span Erection
British Library Conference Proceedings | 2008
|Kenova bridge end span erection
Engineering Index Backfile | 1920
Bridge span collapses during erection
Engineering Index Backfile | 1927
Kenova bridge channel span erection
Engineering Index Backfile | 1920