A platform for research: civil engineering, architecture and urbanism
METHOD FOR CONSTRUCTION OF PILES IN ROCK AND PERMAFROST SOILS
FIELD: construction.SUBSTANCE: invention relates to construction of foundation and bases on rocky grounds, including for special purposes on permafrost soils, specifically to method of erecting piles in rock and permafrost soils of Far North. Method of erecting piles in rock and permafrost soils is characterized by the fact that at the point of each pile installation a narrow leader well is drilled at the design depth of the pile immersion with a rock drill with simultaneous removal of drilling sludge from the drilling zone with compressed air supplied through the bore cavity and a hole in the drill cutter. Further, the leader well is expanded by an expansion bit equipped with a striker and a hollow guide nozzle – a pilot with end teeth, to transverse dimensions corresponding to the diameter of the blades of the screw pile, with simultaneous removal of drilling mud from expanded well by feeding compressed air into expansion zone through central hole in expansion bit. Simultaneously with process of expansion and cleaning of well from sludge on portable concrete mixer, liquid sand concrete mix (SCM) is prepared in volume sufficient for rigid attachment of pile in expanded well. Further, after readiness of SCM and cleaning of expanded well from slurry, expansion bit is removed and in the lower part of the expanded well through the corresponding groove of the mobile concrete mixer liquid SCM is poured into the depth, providing complete pouring of SCM screw empennage of the pile at its location at the bottom of the expanded well. Then, in partially filled with liquid SCM well, the pile is immersed by its screwing in or pushing in against its end teeth to the bottom of the well, after the end of the pile end teeth in the bottom of the well, the pile is scrolled until the SCM access is completely closed from the well into the inner cavity of the pile. Further, the pile is centered and the cavities between the outer side surfaces of the pile and the inner walls of the expanded well are filled with liquid SCM with simultaneous compaction by vibration and / or rotation of the pile, after filling of the above cavities and SCM hardening in them backfilling of internal cavity of the pile with dry sand-cement mixture (SCmM).EFFECT: technical result consists in improvement of speed of erection of pile foundation on rock and permafrost soils of Far North without deployment of concrete plants, reduction of required volumes of liquid SCM for attachment of pile in well.6 cl, 8 dwg
Изобретение относится к строительству фундамента и оснований на скальных грунтах, в том числе для особых целей на вечномерзлых грунтах, конкретно к способу возведения свай в скальных и мерзлоскальных грунтах Крайнего Севера. Способ возведения свай в скальных и мерзлоскальных грунтах характеризуется тем, что в месте установки каждой сваи бурят узкую лидерную скважину на проектную глубину погружения сваи скальным буром с одновременным выводом бурильного шлама из зоны бурения сжатым воздухом, подаваемым через полость бура и отверстие в резаке бура. Далее лидерную скважину расширяют расширительным долотом, снабженным ударником и пустотелым направляющим патрубком - пилотом с торцевыми зубьями, до поперечных размеров, соответствующих диаметру лопастей винтовой сваи, с одновременным выводом из расширенной скважины бурового шлама путем подачи сжатого воздуха в зону расширения через центральное отверстие в расширительном долоте. Одновременно с процессом расширения и очистки скважины от шлама на переносной бетономешалке готовят жидкую пескобетонную смесь ПБС в объеме, достаточном для жесткого крепления сваи в расширенной скважине. Далее после готовности ПБС и очистки расширенной скважины от шлама вынимают расширительное долото и в нижнюю часть расширенной скважины через соответствующий желобок мобильной бетономешалки заливают жидкую ПБС на глубину, обеспечивающую полную заливку ПБС винтового оперения сваи при нахождении её на дне расширенной скважины. Затем в частично заполненную жидкой ПБС скважину погружают сваю путем её вкручивания или вдавливания до упора её торцевых зубьев в дно скважины, после упора торцевых зубьев сваи в дно скважины сваю прокручивают до полного закрытия доступа ПБС из скважины во внутреннюю полость сваи. Далее сваю центрируют и пустоты между внешними боковыми поверхностями сваи и внутренними стенками расширенной скважины заполняют жидкой ПБС с одновременным её уплотнением путем вибрации и/или вращения сваи, после заполнения указанных пустот и затвердевания в них ПБС производят засыпку внутренней полости сваи сухой пескоцементной смесью (ПЦС). Технический результат состоит в обеспечении повышения скорости возведения свайного фундамента на скальных и мерзлоскальных грунтах Крайнего Севера без развертывания бетонных заводов, снижении требуемых объемов жидкой ПБС для крепления сваи в скважине. 5 з.п. ф-лы, 8 ил.
METHOD FOR CONSTRUCTION OF PILES IN ROCK AND PERMAFROST SOILS
FIELD: construction.SUBSTANCE: invention relates to construction of foundation and bases on rocky grounds, including for special purposes on permafrost soils, specifically to method of erecting piles in rock and permafrost soils of Far North. Method of erecting piles in rock and permafrost soils is characterized by the fact that at the point of each pile installation a narrow leader well is drilled at the design depth of the pile immersion with a rock drill with simultaneous removal of drilling sludge from the drilling zone with compressed air supplied through the bore cavity and a hole in the drill cutter. Further, the leader well is expanded by an expansion bit equipped with a striker and a hollow guide nozzle – a pilot with end teeth, to transverse dimensions corresponding to the diameter of the blades of the screw pile, with simultaneous removal of drilling mud from expanded well by feeding compressed air into expansion zone through central hole in expansion bit. Simultaneously with process of expansion and cleaning of well from sludge on portable concrete mixer, liquid sand concrete mix (SCM) is prepared in volume sufficient for rigid attachment of pile in expanded well. Further, after readiness of SCM and cleaning of expanded well from slurry, expansion bit is removed and in the lower part of the expanded well through the corresponding groove of the mobile concrete mixer liquid SCM is poured into the depth, providing complete pouring of SCM screw empennage of the pile at its location at the bottom of the expanded well. Then, in partially filled with liquid SCM well, the pile is immersed by its screwing in or pushing in against its end teeth to the bottom of the well, after the end of the pile end teeth in the bottom of the well, the pile is scrolled until the SCM access is completely closed from the well into the inner cavity of the pile. Further, the pile is centered and the cavities between the outer side surfaces of the pile and the inner walls of the expanded well are filled with liquid SCM with simultaneous compaction by vibration and / or rotation of the pile, after filling of the above cavities and SCM hardening in them backfilling of internal cavity of the pile with dry sand-cement mixture (SCmM).EFFECT: technical result consists in improvement of speed of erection of pile foundation on rock and permafrost soils of Far North without deployment of concrete plants, reduction of required volumes of liquid SCM for attachment of pile in well.6 cl, 8 dwg
Изобретение относится к строительству фундамента и оснований на скальных грунтах, в том числе для особых целей на вечномерзлых грунтах, конкретно к способу возведения свай в скальных и мерзлоскальных грунтах Крайнего Севера. Способ возведения свай в скальных и мерзлоскальных грунтах характеризуется тем, что в месте установки каждой сваи бурят узкую лидерную скважину на проектную глубину погружения сваи скальным буром с одновременным выводом бурильного шлама из зоны бурения сжатым воздухом, подаваемым через полость бура и отверстие в резаке бура. Далее лидерную скважину расширяют расширительным долотом, снабженным ударником и пустотелым направляющим патрубком - пилотом с торцевыми зубьями, до поперечных размеров, соответствующих диаметру лопастей винтовой сваи, с одновременным выводом из расширенной скважины бурового шлама путем подачи сжатого воздуха в зону расширения через центральное отверстие в расширительном долоте. Одновременно с процессом расширения и очистки скважины от шлама на переносной бетономешалке готовят жидкую пескобетонную смесь ПБС в объеме, достаточном для жесткого крепления сваи в расширенной скважине. Далее после готовности ПБС и очистки расширенной скважины от шлама вынимают расширительное долото и в нижнюю часть расширенной скважины через соответствующий желобок мобильной бетономешалки заливают жидкую ПБС на глубину, обеспечивающую полную заливку ПБС винтового оперения сваи при нахождении её на дне расширенной скважины. Затем в частично заполненную жидкой ПБС скважину погружают сваю путем её вкручивания или вдавливания до упора её торцевых зубьев в дно скважины, после упора торцевых зубьев сваи в дно скважины сваю прокручивают до полного закрытия доступа ПБС из скважины во внутреннюю полость сваи. Далее сваю центрируют и пустоты между внешними боковыми поверхностями сваи и внутренними стенками расширенной скважины заполняют жидкой ПБС с одновременным её уплотнением путем вибрации и/или вращения сваи, после заполнения указанных пустот и затвердевания в них ПБС производят засыпку внутренней полости сваи сухой пескоцементной смесью (ПЦС). Технический результат состоит в обеспечении повышения скорости возведения свайного фундамента на скальных и мерзлоскальных грунтах Крайнего Севера без развертывания бетонных заводов, снижении требуемых объемов жидкой ПБС для крепления сваи в скважине. 5 з.п. ф-лы, 8 ил.
METHOD FOR CONSTRUCTION OF PILES IN ROCK AND PERMAFROST SOILS
Способ возведения свай в скальных и мерзлоскальных грунтах
KOZLOV MAKSIM ANATOLEVICH (author) / MOMOT OLEG NIKOLAEVICH (author)
2020-06-25
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction of Two Large-Scale Waste Rock Piles in a Continuous Permafrost Region
British Library Conference Proceedings | 2006
|Convective heat transfer in waste rock piles under permafrost environment
British Library Conference Proceedings | 2008
|Improved types of piles for construction on permafrost soils in the north of West Siberia
Online Contents | 1987
|