A platform for research: civil engineering, architecture and urbanism
SUBMERSIBLE RIBBON BRIDGE
FIELD: construction.SUBSTANCE: ribbon bridge submerged along length is made composite from coastal and river parts, pontoons of river part are equipped with system of immersion and ascent, consisting of inlet and outlet valves and system of compressed air supply, at the point of docking of river floating and coastal parts there are guide beams of double-tee section fixed vertically by one end at transition part and second one are immersed into bottom of water reservoir, and on extreme pontoons of river surfacing part by roller blocks. For submersion of bridge part of ribbon bridge, deck and bottom coupling devices are opened and river part is kept at axle of axle at that time due to vertical guides, in external water-filled casing due to opening of inlet (for ballast water) and outlet (for air bleeding) valves is supplied ballast water and river part, retained and moving along guide beams, submerged under water, submersion of river part of bridge continues to required and (or possible depth). Surfacing of river part of bridge is performed in the following sequence: discharge (for air bleeding) valves are closed, from system of compressed air supply to external water-filled housing air is supplied, through open inlet (for ballast water) valves water is removed, buoyancy of pontoons is increased, and moving the roller units along the guides, the river part floats to the surface, the deck and bottom coupling devices lock the pontoons of the shore and river part of the bridge due to the closing mechanism.EFFECT: proposed is a floating bridge used to pass railway rolling stock, wheeled and caterpillar equipment at destruction or reconstruction of capital bridges through wide and deep water obstacles.1 cl, 9 dwg
Изобретение относится к наплавным мостам, используемым для пропуска железнодорожного подвижного состава, колесной и гусеничной техники при разрушении или реконструкции капитальных мостов через широкие и глубокие водные преграды. Мост-лента погружной по длине выполнен составным из береговых и речной частей, понтоны речной части снабжены системой погружения и всплытия, состоящей из впускных и выпускных клапанов и системы подачи сжатого воздуха, в месте стыковки речной наплавной и береговой частей имеются направляющие балки двутаврового сечения, закрепленные вертикально одним концом на переходной части и вторым погруженные в дно водоема, а на крайних понтонах речной наплавной части роликовыми блоками. Для погружения речной части моста-ленты палубные и днищевые сцепные устройства размыкаются и речная часть в это время удерживается на оси моста за счет вертикальных направляющих, во внешний водонаполняемый корпус за счет открытия впускных (для балластной воды) и выпускных (для стравливания воздуха) клапанов подается балластная вода и речная часть, удерживаясь и двигаясь по направляющим балкам, погружается под воду, погружение речной части моста продолжается на необходимую и(или) возможную глубину. Всплытие речной части моста осуществляется в следующей последовательности: выпускные (для стравливания воздуха) клапаны закрываются, из системы подачи сжатого воздуха во внешний водонаполняемый корпус подается воздух, через открытые впускные (для балластной воды) клапаны вода удаляется, плавучесть понтонов увеличивается, и, двигаясь роликовыми блоками по направляющим, речная часть всплывает на поверхность, палубные и днищевые сцепные устройства за счет механизма замыкания блокируют понтоны береговой и речной части моста. 9 ил.
SUBMERSIBLE RIBBON BRIDGE
FIELD: construction.SUBSTANCE: ribbon bridge submerged along length is made composite from coastal and river parts, pontoons of river part are equipped with system of immersion and ascent, consisting of inlet and outlet valves and system of compressed air supply, at the point of docking of river floating and coastal parts there are guide beams of double-tee section fixed vertically by one end at transition part and second one are immersed into bottom of water reservoir, and on extreme pontoons of river surfacing part by roller blocks. For submersion of bridge part of ribbon bridge, deck and bottom coupling devices are opened and river part is kept at axle of axle at that time due to vertical guides, in external water-filled casing due to opening of inlet (for ballast water) and outlet (for air bleeding) valves is supplied ballast water and river part, retained and moving along guide beams, submerged under water, submersion of river part of bridge continues to required and (or possible depth). Surfacing of river part of bridge is performed in the following sequence: discharge (for air bleeding) valves are closed, from system of compressed air supply to external water-filled housing air is supplied, through open inlet (for ballast water) valves water is removed, buoyancy of pontoons is increased, and moving the roller units along the guides, the river part floats to the surface, the deck and bottom coupling devices lock the pontoons of the shore and river part of the bridge due to the closing mechanism.EFFECT: proposed is a floating bridge used to pass railway rolling stock, wheeled and caterpillar equipment at destruction or reconstruction of capital bridges through wide and deep water obstacles.1 cl, 9 dwg
Изобретение относится к наплавным мостам, используемым для пропуска железнодорожного подвижного состава, колесной и гусеничной техники при разрушении или реконструкции капитальных мостов через широкие и глубокие водные преграды. Мост-лента погружной по длине выполнен составным из береговых и речной частей, понтоны речной части снабжены системой погружения и всплытия, состоящей из впускных и выпускных клапанов и системы подачи сжатого воздуха, в месте стыковки речной наплавной и береговой частей имеются направляющие балки двутаврового сечения, закрепленные вертикально одним концом на переходной части и вторым погруженные в дно водоема, а на крайних понтонах речной наплавной части роликовыми блоками. Для погружения речной части моста-ленты палубные и днищевые сцепные устройства размыкаются и речная часть в это время удерживается на оси моста за счет вертикальных направляющих, во внешний водонаполняемый корпус за счет открытия впускных (для балластной воды) и выпускных (для стравливания воздуха) клапанов подается балластная вода и речная часть, удерживаясь и двигаясь по направляющим балкам, погружается под воду, погружение речной части моста продолжается на необходимую и(или) возможную глубину. Всплытие речной части моста осуществляется в следующей последовательности: выпускные (для стравливания воздуха) клапаны закрываются, из системы подачи сжатого воздуха во внешний водонаполняемый корпус подается воздух, через открытые впускные (для балластной воды) клапаны вода удаляется, плавучесть понтонов увеличивается, и, двигаясь роликовыми блоками по направляющим, речная часть всплывает на поверхность, палубные и днищевые сцепные устройства за счет механизма замыкания блокируют понтоны береговой и речной части моста. 9 ил.
SUBMERSIBLE RIBBON BRIDGE
МОСТ-ЛЕНТА ПОГРУЖНОЙ
ZHARYJ DMITRIJ ALEKSANDROVICH (author)
2020-07-08
Patent
Electronic Resource
Russian
IPC:
E01D
BRIDGES
,
Brücken
Kuparuk River Submersible Bridge
British Library Online Contents | 2000
Submersible bridge in Portuguese India
Engineering Index Backfile | 1943
Submersible Bridge on Sandy Strata
British Library Online Contents | 1998
|For new bridge -- Ribbon of light
Engineering Index Backfile | 1966
|Concrete ribbon bridge spans 1,500 Ft
Engineering Index Backfile | 1964