A platform for research: civil engineering, architecture and urbanism
GRAVITY-VACUUM SEWAGE SYSTEM
FIELD: water supply.SUBSTANCE: invention relates to water disposal. Proposed system comprises receiving and collecting reservoirs, vacuum pump, centrifugal pump, two fans, discharge pipelines and suction pipeline. System is additionally equipped with a residential module consisting of a residential part of a residential module and a technical sub-floor of a residential module, an auxiliary module consisting of a working part of an auxiliary module and a utility subfield of the utility module, an inter-module gateway, at least one sanitary device and drain pipeline, intermediate pipeline, two automatic shut-off elements, check valve, pressure sensor, electric motor of vacuum pump, electric motor of centrifugal pump, two electric motors of fans, three supplying air ducts, two supplying air ducts, two air ducts of preliminary heating, three intermediate air ducts, three automatic air tees with shutters, automatic air choke, suction air duct, two discharge air ducts, two air preparation units with two control units of air treatment units, two air ventilation ducts, three temperature sensors, two sensors of filling control, programmable controller with communication channels. Residential module is connected to auxiliary module by means of modular sluice. At least one drain pipeline, the first supply air duct and the first preheating air duct are located in the residential module. First discharge pipeline, first and second automatic shut-off elements, first fan with electric motor of first fan, first intermediate air duct, first automatic air tee with gates, receiving reservoir with the first temperature sensor and the first filling control sensor are in the technical subfield of the residential module. At least one sanitary device, first air treatment unit with first air preparation units control device, first air duct of ventilation, programmable controller are located in residential part of residential module. Second supply air duct, the second air duct of preliminary heating and the intermediate pipeline are located in the auxiliary module. Check valve, second fan with electric motor of second fan, second intermediate air duct, second automatic air tee with gates, centrifugal pump with electric motor of centrifugal pump are located in technical subfield of auxiliary module. Collecting reservoir with second temperature sensor, pressure sensor and second sensor of filling control, suction air duct, vacuum pump with electric motor of vacuum pump, third intermediate air duct, third automatic air tee with gates, second air preparation unit with second control unit of air preparation units, second air duct, automatic air choke are located in working part of auxiliary module. At least one sanitary device is connected to the first discharge pipeline by means of at least one drain pipeline. First offtake pipeline is connected to the receiving reservoir at the upper point of the receiving reservoir. First supply air duct, the first fan with electric motor of the first fan, the first intermediate air duct, the first automatic air tee with gates are connected in series. First automatic air tee with gates is connected to first air preparation unit by means of first supply pipeline and first pre-heating pipeline, at that, first pre-heating pipeline extends through receiving reservoir. First air duct is connected to the first unit of air preparation. First automatic shut-off element is installed between the drain pipelines and receiving reservoir. Receiving reservoir with the first temperature sensor installed in it and the first sensor of the filling control at the lower point is connected to the collecting reservoir at the upper point by means of the suction pipeline, with the second automatic shut-off element installed on it. Second supply air duct, the second fan with electric motor of the second fan, the second intermediate air duct, the second automatic air tee with gates are connected in series. Second automatic air tee with gates is connected to second air preparation unit by means of second supply pipeline and second pre-heating pipeline, wherein the second pre-heating pipeline passes through the collecting reservoir. Second temperature sensor, pressure sensor and second filling control sensor are installed in the collecting reservoir. Collecting reservoir is connected with suction air duct in upper point. Suction air duct with automatic choke installed on it, vacuum pump with electric motor of vacuum pump, third intermediate air duct, third automatic air tee with gates are connected in series. Third automatic air tee with flaps is connected to the first discharge air duct and to the second unit of air preparation by means of the third supplying air duct. Second air preparation unit is connected to second air duct and second discharge air duct. Intermediate pipeline, centrifugal pump with electric motor of centrifugal pump, discharge pipeline with installed on it third automatic shut-off element are connected in s
Изобретение относится к области водоотведения. Система содержит приемный и сборный резервуары, вакуумный насос, центробежный насос, два вентилятора, отводные трубопроводы, всасывающий трубопровод. Система дополнительно снабжена жилым модулем, состоящим из жилой части жилого модуля и технического подпола жилого модуля, подсобным модулем, состоящем из рабочей части подсобного модуля и технического подпола подсобного модуля, межмодульным шлюзом, по крайней мере одним санитарно-техническим прибором и трубопроводом стока, промежуточным трубопроводом, двумя автоматическими запорными органами, обратным клапаном, датчиком давления, электрическим двигателем вакуумного насоса, электрическим двигателем центробежного насоса, двумя электрическими двигателями вентиляторов, тремя подающими воздуховодами, двумя подводящими воздуховодами, двумя воздуховодами предварительного нагрева, тремя промежуточными воздуховодами, тремя автоматическими воздушными тройниками с заслонками, автоматической воздушной заслонкой, всасывающим воздуховодом, двумя отводящими воздуховодами, двумя узлами подготовки воздуха с двумя регулирующими устройствами узлов подготовки воздуха, двумя воздуховодами вентиляции, тремя датчиками температуры, двумя датчиками контроля наполнения, программируемым контроллером с каналами связи. Жилой модуль соединен с подсобным модулем с помощью модульного шлюза. По крайней мере один трубопровод стока, первый подающий воздуховод, первый воздуховод предварительного нагрева расположены в жилом модуле. Первый отводной трубопровод, первый и второй автоматические запорные органы, первый вентилятор с электрическим двигателем первого вентилятора, первый промежуточный воздуховод, первый автоматический воздушный тройник с заслонками, приёмный резервуар с первым датчиком температуры и первым датчиком контроля наполнения находятся в техническом подполе жилого модуля. По крайней мере один санитарно-технический прибор, первый узел подготовки воздуха с первым регулирующим устройством узлов подготовки воздуха, первый воздуховод вентиляции, программируемый контроллер находятся в жилой части жилого модуля. Второй подающий воздуховод, второй воздуховод предварительного нагрева, промежуточный трубопровод расположены в подсобном модуле. Обратный клапан, второй вентилятор с электрическим двигателем второго вентилятора, второй промежуточный воздуховод, второй автоматический воздушный тройник с заслонками, центробежный насос с электрическим двигателем центробежного насоса, расположены в техническом подполе подсобного модуля. Сборный резервуар со вторым датчиком температуры, датчиком давления и вторым датчиком контроля наполнения, всасывающий воздуховод, вакуумный насос с электрическим двигателем вакуумного насоса, третий промежуточный воздуховодом, третий автоматический воздушный тройник с заслонками, второй узел подготовки воздуха со вторым регулирующим устройством узлов подготовки воздуха, второй вентиляционный воздуховод, автоматическая воздушная заслонка расположены в рабочей части подсобного модуля. По крайней мере один санитарно-технический прибор соединен с первым отводным трубопроводом с помощью по крайней мере одного трубопровода стока. Первый отводной трубопровод соединен с приемным резервуаром в верхней точке приемного резервуара. Первый подводящий воздуховод, первый вентилятор с электрическим двигателем первого вентилятора, первый промежуточный воздуховод, первый автоматический воздушный тройник с заслонками соединены последовательно. Первый автоматический воздушный тройник с заслонками соединен с первым узлом подготовки воздуха посредством первого подающего трубопровода и первого трубопровода предварительного нагрева, причем первый трубопровод предварительного нагрева проходит через приемный резервуар. Первый вентиляционный воздуховод соединен с первым узлом подготовки воздуха. На первый отводящий трубопровод установлен первый автоматический запорный орган между трубопроводами стока и приемным резервуаром. Приемный резервуар с установленными в нём первым датчиком температуры и первым датчиком контроля наполнения в нижней точке соединен со сборным резервуаром в верхней точке посредством всасывающего трубопровода, с установленным на нем вторым автоматическим запорным органом. Второй подводящий воздуховод, второй вентилятор с электрическим двигателем второго вентилятора, второй промежуточный воздуховод, второй автоматический воздушный тройник с заслонками соединены последовательно. Второй автоматический воздушный тройник с заслонками соединен со вторым узлом подготовки воздуха посредством второго подающего трубопровода и второго трубопровода предварительного нагрева, причем второй трубопровод
GRAVITY-VACUUM SEWAGE SYSTEM
FIELD: water supply.SUBSTANCE: invention relates to water disposal. Proposed system comprises receiving and collecting reservoirs, vacuum pump, centrifugal pump, two fans, discharge pipelines and suction pipeline. System is additionally equipped with a residential module consisting of a residential part of a residential module and a technical sub-floor of a residential module, an auxiliary module consisting of a working part of an auxiliary module and a utility subfield of the utility module, an inter-module gateway, at least one sanitary device and drain pipeline, intermediate pipeline, two automatic shut-off elements, check valve, pressure sensor, electric motor of vacuum pump, electric motor of centrifugal pump, two electric motors of fans, three supplying air ducts, two supplying air ducts, two air ducts of preliminary heating, three intermediate air ducts, three automatic air tees with shutters, automatic air choke, suction air duct, two discharge air ducts, two air preparation units with two control units of air treatment units, two air ventilation ducts, three temperature sensors, two sensors of filling control, programmable controller with communication channels. Residential module is connected to auxiliary module by means of modular sluice. At least one drain pipeline, the first supply air duct and the first preheating air duct are located in the residential module. First discharge pipeline, first and second automatic shut-off elements, first fan with electric motor of first fan, first intermediate air duct, first automatic air tee with gates, receiving reservoir with the first temperature sensor and the first filling control sensor are in the technical subfield of the residential module. At least one sanitary device, first air treatment unit with first air preparation units control device, first air duct of ventilation, programmable controller are located in residential part of residential module. Second supply air duct, the second air duct of preliminary heating and the intermediate pipeline are located in the auxiliary module. Check valve, second fan with electric motor of second fan, second intermediate air duct, second automatic air tee with gates, centrifugal pump with electric motor of centrifugal pump are located in technical subfield of auxiliary module. Collecting reservoir with second temperature sensor, pressure sensor and second sensor of filling control, suction air duct, vacuum pump with electric motor of vacuum pump, third intermediate air duct, third automatic air tee with gates, second air preparation unit with second control unit of air preparation units, second air duct, automatic air choke are located in working part of auxiliary module. At least one sanitary device is connected to the first discharge pipeline by means of at least one drain pipeline. First offtake pipeline is connected to the receiving reservoir at the upper point of the receiving reservoir. First supply air duct, the first fan with electric motor of the first fan, the first intermediate air duct, the first automatic air tee with gates are connected in series. First automatic air tee with gates is connected to first air preparation unit by means of first supply pipeline and first pre-heating pipeline, at that, first pre-heating pipeline extends through receiving reservoir. First air duct is connected to the first unit of air preparation. First automatic shut-off element is installed between the drain pipelines and receiving reservoir. Receiving reservoir with the first temperature sensor installed in it and the first sensor of the filling control at the lower point is connected to the collecting reservoir at the upper point by means of the suction pipeline, with the second automatic shut-off element installed on it. Second supply air duct, the second fan with electric motor of the second fan, the second intermediate air duct, the second automatic air tee with gates are connected in series. Second automatic air tee with gates is connected to second air preparation unit by means of second supply pipeline and second pre-heating pipeline, wherein the second pre-heating pipeline passes through the collecting reservoir. Second temperature sensor, pressure sensor and second filling control sensor are installed in the collecting reservoir. Collecting reservoir is connected with suction air duct in upper point. Suction air duct with automatic choke installed on it, vacuum pump with electric motor of vacuum pump, third intermediate air duct, third automatic air tee with gates are connected in series. Third automatic air tee with flaps is connected to the first discharge air duct and to the second unit of air preparation by means of the third supplying air duct. Second air preparation unit is connected to second air duct and second discharge air duct. Intermediate pipeline, centrifugal pump with electric motor of centrifugal pump, discharge pipeline with installed on it third automatic shut-off element are connected in s
Изобретение относится к области водоотведения. Система содержит приемный и сборный резервуары, вакуумный насос, центробежный насос, два вентилятора, отводные трубопроводы, всасывающий трубопровод. Система дополнительно снабжена жилым модулем, состоящим из жилой части жилого модуля и технического подпола жилого модуля, подсобным модулем, состоящем из рабочей части подсобного модуля и технического подпола подсобного модуля, межмодульным шлюзом, по крайней мере одним санитарно-техническим прибором и трубопроводом стока, промежуточным трубопроводом, двумя автоматическими запорными органами, обратным клапаном, датчиком давления, электрическим двигателем вакуумного насоса, электрическим двигателем центробежного насоса, двумя электрическими двигателями вентиляторов, тремя подающими воздуховодами, двумя подводящими воздуховодами, двумя воздуховодами предварительного нагрева, тремя промежуточными воздуховодами, тремя автоматическими воздушными тройниками с заслонками, автоматической воздушной заслонкой, всасывающим воздуховодом, двумя отводящими воздуховодами, двумя узлами подготовки воздуха с двумя регулирующими устройствами узлов подготовки воздуха, двумя воздуховодами вентиляции, тремя датчиками температуры, двумя датчиками контроля наполнения, программируемым контроллером с каналами связи. Жилой модуль соединен с подсобным модулем с помощью модульного шлюза. По крайней мере один трубопровод стока, первый подающий воздуховод, первый воздуховод предварительного нагрева расположены в жилом модуле. Первый отводной трубопровод, первый и второй автоматические запорные органы, первый вентилятор с электрическим двигателем первого вентилятора, первый промежуточный воздуховод, первый автоматический воздушный тройник с заслонками, приёмный резервуар с первым датчиком температуры и первым датчиком контроля наполнения находятся в техническом подполе жилого модуля. По крайней мере один санитарно-технический прибор, первый узел подготовки воздуха с первым регулирующим устройством узлов подготовки воздуха, первый воздуховод вентиляции, программируемый контроллер находятся в жилой части жилого модуля. Второй подающий воздуховод, второй воздуховод предварительного нагрева, промежуточный трубопровод расположены в подсобном модуле. Обратный клапан, второй вентилятор с электрическим двигателем второго вентилятора, второй промежуточный воздуховод, второй автоматический воздушный тройник с заслонками, центробежный насос с электрическим двигателем центробежного насоса, расположены в техническом подполе подсобного модуля. Сборный резервуар со вторым датчиком температуры, датчиком давления и вторым датчиком контроля наполнения, всасывающий воздуховод, вакуумный насос с электрическим двигателем вакуумного насоса, третий промежуточный воздуховодом, третий автоматический воздушный тройник с заслонками, второй узел подготовки воздуха со вторым регулирующим устройством узлов подготовки воздуха, второй вентиляционный воздуховод, автоматическая воздушная заслонка расположены в рабочей части подсобного модуля. По крайней мере один санитарно-технический прибор соединен с первым отводным трубопроводом с помощью по крайней мере одного трубопровода стока. Первый отводной трубопровод соединен с приемным резервуаром в верхней точке приемного резервуара. Первый подводящий воздуховод, первый вентилятор с электрическим двигателем первого вентилятора, первый промежуточный воздуховод, первый автоматический воздушный тройник с заслонками соединены последовательно. Первый автоматический воздушный тройник с заслонками соединен с первым узлом подготовки воздуха посредством первого подающего трубопровода и первого трубопровода предварительного нагрева, причем первый трубопровод предварительного нагрева проходит через приемный резервуар. Первый вентиляционный воздуховод соединен с первым узлом подготовки воздуха. На первый отводящий трубопровод установлен первый автоматический запорный орган между трубопроводами стока и приемным резервуаром. Приемный резервуар с установленными в нём первым датчиком температуры и первым датчиком контроля наполнения в нижней точке соединен со сборным резервуаром в верхней точке посредством всасывающего трубопровода, с установленным на нем вторым автоматическим запорным органом. Второй подводящий воздуховод, второй вентилятор с электрическим двигателем второго вентилятора, второй промежуточный воздуховод, второй автоматический воздушный тройник с заслонками соединены последовательно. Второй автоматический воздушный тройник с заслонками соединен со вторым узлом подготовки воздуха посредством второго подающего трубопровода и второго трубопровода предварительного нагрева, причем второй трубопровод
GRAVITY-VACUUM SEWAGE SYSTEM
Система самотечно-вакуумной канализации
CHISTYAKOV ARTUR EDUARDOVICH (author) / IGNATCHIK VIKTOR SERGEEVICH (author) / SARKISOV SERGEJ VLADIMIROVICH (author) / ERSHOV GENNADIJ ALEKSANDROVICH (author) / SENYUKOVICH MIKHAIL ALEKSANDROVICH (author) / MUSATOV VYACHESLAV IGOREVICH (author) / BORISOV ALEKSEJ ALEKSANDROVICH (author) / ANISIMOV YURIJ PETROVICH (author)
2020-08-24
Patent
Electronic Resource
Russian
IPC:
E03F
SEWERS
,
Abwasserkanäle