ICE-RESISTANT DRILLING COMPLEX FOR DEVELOPMENT OF CONTINENTAL SHELF AND METHOD OF FORMATION OF ICE-RESISTANT DRILLING COMPLEX FOR DEVELOPMENT OF CONTINENTAL SHELF
FIELD: hydraulic structures.SUBSTANCE: claimed group of inventions relates to hydrotechnical structures, and more specifically to structures of ice-resistant drilling complex for development of continental shelf and methods of their formation. Novelty in proposed ice-resistant complex for development of continental shelf is that ice-resistant complex comprises ice-resistant block-conductor, and ice-resistant support base is solid and includes upper part installed on ice-breaker part and intended for support of upper structure, i.e. self-elevating floating drilling rig, wherein the pontoon width of the support base support portion does not exceed the distance between the support towers of the said self-lifting drilling rig. Novelty in the proposed method of forming an ice-resistant complex for development of the continental shelf is the fact that ice-resistant support base is prepared in advance, which is made integral, having support, ice-breaking and upper parts, note here that bearing base bearing part pontoon width does not exceed distance between support columns of said self-lifting drilling rig. Then, according to the first version of the method, at the complex formation point, the excavation is performed to locate the ice-resistant block-conductor and the ice-resistant support base; after that, an ice-resistant block-conductor is installed at the formation formation point in the trench. According to the second version of the method, the pit excavation to locate the ice-resistant block-conductor and the ice-resistant support base is not provided and an ice-resistant block-conductor is installed at the formation point of the complex. Then, to the ice-resistant block-conductor, said self-lifting floating drilling rig is brought, its positioning is carried out and the latter case is lifted on support columns. After that, prepared said ice-resistant support base is transported to complex formation point, at that, according to the first version, above the excavated trench, according to the second version, the trench excavation was not performed, the support base is under the housing of the said self-lifting floating drilling rig, positioned, buried into the ground to reduce the effect of ice loads and fixed at the bottom by means of, for example, piles. Then lowering the body of self-lifting floating drilling rig to the upper part of the support base, extending the cantilever with the possibility of resting on the ice-resistant conductor unit, after which the support columns of the plant are lifted from water, thereby removing them from the zone of action of ice and wave loads, and drilling is performed.EFFECT: improved reliability at perception of external loads, increased autonomy of the structure of the complex at improvement of technological effectiveness of the method of its formation, as well as expansion of operational capabilities by drilling through an ice-resistant block-conductor.5 cl, 3 dwg
Заявляемая группа изобретений относится к гидротехническим сооружениям, а более конкретно к конструкциям ледостойкого бурового комплекса для освоения континентального шельфа и способам их формирования. Новым в заявляемом ледостойком комплексе для освоения континентального шельфа является то, что ледостойкий комплекс содержит ледостойкий блок-кондуктор, а ледостойкое опорное основание выполнено цельным и включает в себя верхнюю часть, установленную на ледоломной части и предназначенную для опирания верхнего строения, т.е. самоподъемной плавучей буровой установки, при этом ширина понтона опорной части опорного основания не превышает расстояния между опорными колоннами упомянутой самоподъемной плавучей буровой установки. Новым в заявляемом способе формирования ледостойкого комплекса для освоения континентального шельфа является то, что предварительно изготавливают ледостойкое опорное основание, которое выполняют цельным, имеющим опорную, ледоломную и верхнюю части, при этом ширину понтона опорной части опорного основания выполняют не превышающей расстояния между опорными колоннами упомянутой самоподъемной плавучей буровой установки. Затем первоначально по первому варианту способа на точке формирования комплекса производят рытье котлована для размещения ледостойкого блок-кондуктора и ледостойкого опорного основания, после чего на точке формирования комплекса в котловане устанавливают ледостойкий блок-кондуктор. По второму варианту способа рытье котлована для размещения ледостойкого блок-кондуктора и ледостойкого опорного основания не предусмотрено и на точке формирования комплекса устанавливают ледостойкий блок-кондуктор. Затем к ледостойкому блок-кондуктору подводят упомянутую самоподъемную плавучую буровую установку, производят ее позиционирование и поднимают корпус последней на опорных колоннах. После этого подготовленное упомянутое ледостойкое опорное основание транспортируют к месту формирования комплекса, при этом по первому варианту над вырытым котлованом, по второму варианту рытье котлована не производилось, подводят опорное основание под корпус упомянутой самоподъемной плавучей буровой установки, позиционируют, заглубляют в грунт для уменьшения действия ледовых нагрузок и закрепляют на дне посредством, например, свай. Затем опускают корпус самоподъемной плавучей буровой установки на верхнюю часть опорного основания, выдвигают кантилевер с возможностью опирания на ледостойкий блок-кондуктор, после чего опорные колонны установки поднимают из воды, тем самым выводят их из зоны действия ледовых и волновых нагрузок, и производят бурение. Техническим результатом заявленной группы изобретений является повышение надежности при восприятии внешних нагрузок, увеличение автономности конструкции комплекса при повышении технологичности способа его формирования, а также расширение эксплуатационных возможностей путем обеспечения бурения через ледостойкий блок-кондуктор. 3 н. и 2 з.п. ф-лы, 3 ил.
ICE-RESISTANT DRILLING COMPLEX FOR DEVELOPMENT OF CONTINENTAL SHELF AND METHOD OF FORMATION OF ICE-RESISTANT DRILLING COMPLEX FOR DEVELOPMENT OF CONTINENTAL SHELF
FIELD: hydraulic structures.SUBSTANCE: claimed group of inventions relates to hydrotechnical structures, and more specifically to structures of ice-resistant drilling complex for development of continental shelf and methods of their formation. Novelty in proposed ice-resistant complex for development of continental shelf is that ice-resistant complex comprises ice-resistant block-conductor, and ice-resistant support base is solid and includes upper part installed on ice-breaker part and intended for support of upper structure, i.e. self-elevating floating drilling rig, wherein the pontoon width of the support base support portion does not exceed the distance between the support towers of the said self-lifting drilling rig. Novelty in the proposed method of forming an ice-resistant complex for development of the continental shelf is the fact that ice-resistant support base is prepared in advance, which is made integral, having support, ice-breaking and upper parts, note here that bearing base bearing part pontoon width does not exceed distance between support columns of said self-lifting drilling rig. Then, according to the first version of the method, at the complex formation point, the excavation is performed to locate the ice-resistant block-conductor and the ice-resistant support base; after that, an ice-resistant block-conductor is installed at the formation formation point in the trench. According to the second version of the method, the pit excavation to locate the ice-resistant block-conductor and the ice-resistant support base is not provided and an ice-resistant block-conductor is installed at the formation point of the complex. Then, to the ice-resistant block-conductor, said self-lifting floating drilling rig is brought, its positioning is carried out and the latter case is lifted on support columns. After that, prepared said ice-resistant support base is transported to complex formation point, at that, according to the first version, above the excavated trench, according to the second version, the trench excavation was not performed, the support base is under the housing of the said self-lifting floating drilling rig, positioned, buried into the ground to reduce the effect of ice loads and fixed at the bottom by means of, for example, piles. Then lowering the body of self-lifting floating drilling rig to the upper part of the support base, extending the cantilever with the possibility of resting on the ice-resistant conductor unit, after which the support columns of the plant are lifted from water, thereby removing them from the zone of action of ice and wave loads, and drilling is performed.EFFECT: improved reliability at perception of external loads, increased autonomy of the structure of the complex at improvement of technological effectiveness of the method of its formation, as well as expansion of operational capabilities by drilling through an ice-resistant block-conductor.5 cl, 3 dwg
Заявляемая группа изобретений относится к гидротехническим сооружениям, а более конкретно к конструкциям ледостойкого бурового комплекса для освоения континентального шельфа и способам их формирования. Новым в заявляемом ледостойком комплексе для освоения континентального шельфа является то, что ледостойкий комплекс содержит ледостойкий блок-кондуктор, а ледостойкое опорное основание выполнено цельным и включает в себя верхнюю часть, установленную на ледоломной части и предназначенную для опирания верхнего строения, т.е. самоподъемной плавучей буровой установки, при этом ширина понтона опорной части опорного основания не превышает расстояния между опорными колоннами упомянутой самоподъемной плавучей буровой установки. Новым в заявляемом способе формирования ледостойкого комплекса для освоения континентального шельфа является то, что предварительно изготавливают ледостойкое опорное основание, которое выполняют цельным, имеющим опорную, ледоломную и верхнюю части, при этом ширину понтона опорной части опорного основания выполняют не превышающей расстояния между опорными колоннами упомянутой самоподъемной плавучей буровой установки. Затем первоначально по первому варианту способа на точке формирования комплекса производят рытье котлована для размещения ледостойкого блок-кондуктора и ледостойкого опорного основания, после чего на точке формирования комплекса в котловане устанавливают ледостойкий блок-кондуктор. По второму варианту способа рытье котлована для размещения ледостойкого блок-кондуктора и ледостойкого опорного основания не предусмотрено и на точке формирования комплекса устанавливают ледостойкий блок-кондуктор. Затем к ледостойкому блок-кондуктору подводят упомянутую самоподъемную плавучую буровую установку, производят ее позиционирование и поднимают корпус последней на опорных колоннах. После этого подготовленное упомянутое ледостойкое опорное основание транспортируют к месту формирования комплекса, при этом по первому варианту над вырытым котлованом, по второму варианту рытье котлована не производилось, подводят опорное основание под корпус упомянутой самоподъемной плавучей буровой установки, позиционируют, заглубляют в грунт для уменьшения действия ледовых нагрузок и закрепляют на дне посредством, например, свай. Затем опускают корпус самоподъемной плавучей буровой установки на верхнюю часть опорного основания, выдвигают кантилевер с возможностью опирания на ледостойкий блок-кондуктор, после чего опорные колонны установки поднимают из воды, тем самым выводят их из зоны действия ледовых и волновых нагрузок, и производят бурение. Техническим результатом заявленной группы изобретений является повышение надежности при восприятии внешних нагрузок, увеличение автономности конструкции комплекса при повышении технологичности способа его формирования, а также расширение эксплуатационных возможностей путем обеспечения бурения через ледостойкий блок-кондуктор. 3 н. и 2 з.п. ф-лы, 3 ил.
ICE-RESISTANT DRILLING COMPLEX FOR DEVELOPMENT OF CONTINENTAL SHELF AND METHOD OF FORMATION OF ICE-RESISTANT DRILLING COMPLEX FOR DEVELOPMENT OF CONTINENTAL SHELF
Ледостойкий буровой комплекс для освоения континентального шельфа и способ формирования ледостойкого бурового комплекса для освоения континентального шельфа
KOVALEV MAKSIM VASILEVICH (author) / LENSKIJ VIKTOR FEDOROVICH (author) / NOSKOV VITALIJ VIKTOROVICH (author)
2020-10-15
Patent
Electronic Resource
Russian
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
ICE-RESISTANT DRILLING COMPLEX FOR DEVELOPMENT OF SHALLOW-WATER CONTINENTAL SHELF
European Patent Office | 2020
|Australia’s outer continental shelf regime
Taylor & Francis Verlag | 2012
|Feature: Focus on UK Continental Shelf
Online Contents | 1997
THE U.S. EXTENDED CONTINENTAL SHELF PROJECT
British Library Online Contents | 2009
|Management of a Continental Shelf Ecosystem
British Library Conference Proceedings | 1993
|