A platform for research: civil engineering, architecture and urbanism
GROUND GEODETIC BENCH MARK
FIELD: measuring.SUBSTANCE: ground geodetic bench mark can be used to determine the vertical positioning of various buildings, structures and ground massifs and to control settling and deformation thereof during erection, operation, and reconstruction. The bench mark consists of a steel casing pipe, the length whereof exceeds the level of seasonal freezing of the soil by at least two times. The upper part of the casing pipe protrudes above the daytime surface of the soil. A metal core with an anchor tip in the form of a drilling screw is installed inside the casing pipe. The lower part of the metal core protrudes beyond the casing pipe by at least a quarter of the length of the latter. An end steel plate with a geodesic mark in the form of a steel hemisphere attached thereto is secured on the upper end of the metal core. The cavity between the casing pipe and the metal core is filled with expanded clay gravel from above. The casing pipe is equipped with a steel rotary cover with a loop. The casing pipe has a similar loop. The loops are used to install a padlock. The structure of the bench mark, due to the reliable anchoring, ensures a steady and stable position of the bench mark.EFFECT: ensured constancy of the coordinates of the bench mark and increased accuracy of geodetic measurements.2 cl, 1 dwg
Грунтовый геодезический репер может быть использован для определения высотной привязки различных зданий, сооружений и грунтовых массивов и для контроля их осадок и деформаций в процессе возведения, эксплуатации и реконструкции. Репер состоит из стальной обсадной трубы, длина которой превышает уровень сезонного промерзания грунта не менее чем в два раза. Верхняя часть обсадной трубы выступает над дневной поверхностью грунта. Внутри обсадной трубы установлен металлический сердечник с анкерным наконечником в виде бурового шнека. Нижняя часть металлического сердечника выступает за пределы обсадной трубы не менее четверти длины последней. На верхнем торце металлического сердечника закреплена торцевая стальная пластина с прикрепленной к ней геодезической маркой в виде стальной полусферы. Полость между обсадной трубой и металлическим сердечником заполнена сверху керамзитовым гравием. Обсадная труба снабжена стальной поворотной крышкой с петлей. Аналогичную петлю имеет обсадная труба. Петли служат для установки навесного замка. Конструкция репера за счет надежной анкеровки обеспечивает устойчивое и стабильное положение репера. Технический результат - обеспечение постоянства координат геодезической марки и повышение точности геодезических измерений. 1 з.п. ф-лы, 1 ил.
GROUND GEODETIC BENCH MARK
FIELD: measuring.SUBSTANCE: ground geodetic bench mark can be used to determine the vertical positioning of various buildings, structures and ground massifs and to control settling and deformation thereof during erection, operation, and reconstruction. The bench mark consists of a steel casing pipe, the length whereof exceeds the level of seasonal freezing of the soil by at least two times. The upper part of the casing pipe protrudes above the daytime surface of the soil. A metal core with an anchor tip in the form of a drilling screw is installed inside the casing pipe. The lower part of the metal core protrudes beyond the casing pipe by at least a quarter of the length of the latter. An end steel plate with a geodesic mark in the form of a steel hemisphere attached thereto is secured on the upper end of the metal core. The cavity between the casing pipe and the metal core is filled with expanded clay gravel from above. The casing pipe is equipped with a steel rotary cover with a loop. The casing pipe has a similar loop. The loops are used to install a padlock. The structure of the bench mark, due to the reliable anchoring, ensures a steady and stable position of the bench mark.EFFECT: ensured constancy of the coordinates of the bench mark and increased accuracy of geodetic measurements.2 cl, 1 dwg
Грунтовый геодезический репер может быть использован для определения высотной привязки различных зданий, сооружений и грунтовых массивов и для контроля их осадок и деформаций в процессе возведения, эксплуатации и реконструкции. Репер состоит из стальной обсадной трубы, длина которой превышает уровень сезонного промерзания грунта не менее чем в два раза. Верхняя часть обсадной трубы выступает над дневной поверхностью грунта. Внутри обсадной трубы установлен металлический сердечник с анкерным наконечником в виде бурового шнека. Нижняя часть металлического сердечника выступает за пределы обсадной трубы не менее четверти длины последней. На верхнем торце металлического сердечника закреплена торцевая стальная пластина с прикрепленной к ней геодезической маркой в виде стальной полусферы. Полость между обсадной трубой и металлическим сердечником заполнена сверху керамзитовым гравием. Обсадная труба снабжена стальной поворотной крышкой с петлей. Аналогичную петлю имеет обсадная труба. Петли служат для установки навесного замка. Конструкция репера за счет надежной анкеровки обеспечивает устойчивое и стабильное положение репера. Технический результат - обеспечение постоянства координат геодезической марки и повышение точности геодезических измерений. 1 з.п. ф-лы, 1 ил.
GROUND GEODETIC BENCH MARK
ГРУНТОВЫЙ ГЕОДЕЗИЧЕСКИЙ РЕПЕР
PETUKHOV ARKADIJ ALEKSANDROVICH (author) / MATVEEV ANDREJ VADIMOVICH (author) / ARZAMASTSEV SERGEJ ALEKSANDROVICH (author)
2022-01-21
Patent
Electronic Resource
Russian
A combination survey monument and bench mark
Engineering Index Backfile | 1928
Initial bench mark for measuring foundation settlements
Online Contents | 1965
|New Jersey geodetic control survey bench marks in Bergen and Hudson Counties
Engineering Index Backfile | 1939
Precision bench-mark leveling in Oslo, 1927
Engineering Index Backfile | 1928
|The latest AJ/Colander Bench Mark Report for Architects
British Library Online Contents | 2003