A platform for research: civil engineering, architecture and urbanism
Cryogenic trench/trough apparatus and method
A method of installing a trough or trench for containing a cryogenic spill, includes the step of constructing multiple precast concrete sections at a first location, each section having a bottom wall and spaced apart side walls connected to and extending up from the bottom wall. Each section has end portions that enable connection to another concrete section. The method includes (at the first location), preparing multiple panels of polymeric concrete material by filling one or more molds with a slurry or liquid polymeric concrete material and after time allowing the material to cure and harden. At the first location, one or more of the panels is adhered to the bottom wall and side walls of each concrete section using an adhesive. After adhering of the panels to the concrete sections, the concrete sections are transported from the first location to a second location that is remote from the first location. At the second location, the concrete sections are connected together using connections that join one end portion of a concrete section to and end portion of another concrete section. In one embodiment, the trough or trench is placed next to a pipe rack having cryogen containing flow lines. A slab and riser arrangement preferably channel any spill to the trough or trench.
Cryogenic trench/trough apparatus and method
A method of installing a trough or trench for containing a cryogenic spill, includes the step of constructing multiple precast concrete sections at a first location, each section having a bottom wall and spaced apart side walls connected to and extending up from the bottom wall. Each section has end portions that enable connection to another concrete section. The method includes (at the first location), preparing multiple panels of polymeric concrete material by filling one or more molds with a slurry or liquid polymeric concrete material and after time allowing the material to cure and harden. At the first location, one or more of the panels is adhered to the bottom wall and side walls of each concrete section using an adhesive. After adhering of the panels to the concrete sections, the concrete sections are transported from the first location to a second location that is remote from the first location. At the second location, the concrete sections are connected together using connections that join one end portion of a concrete section to and end portion of another concrete section. In one embodiment, the trough or trench is placed next to a pipe rack having cryogen containing flow lines. A slab and riser arrangement preferably channel any spill to the trough or trench.
Cryogenic trench/trough apparatus and method
BENTON JR STEPHEN G (author) / OWENS BENJAMIN (author) / BELSOM CHARLIE (author) / BABIN KEVIN (author) / GARY JON (author)
2021-06-22
Patent
Electronic Resource
English