A platform for research: civil engineering, architecture and urbanism
Rigging Lift and Method of Use
A method of constructing a structure in which an item is to be installed at an elevated height on the structure. Hoists are hung from the structure. A platform is moved from ground level and positioned at a first elevated position between ground level and the hoists. The platform is attached to the hoists at the first elevated position. After the platform has been attached to the hoists, the item is moved onto the platform. The item is lifted on the platform to a second elevated position for installation at the elevated height on the structure and the item is installed at the elevated height.
Rigging Lift and Method of Use
A method of constructing a structure in which an item is to be installed at an elevated height on the structure. Hoists are hung from the structure. A platform is moved from ground level and positioned at a first elevated position between ground level and the hoists. The platform is attached to the hoists at the first elevated position. After the platform has been attached to the hoists, the item is moved onto the platform. The item is lifted on the platform to a second elevated position for installation at the elevated height on the structure and the item is installed at the elevated height.
Rigging Lift and Method of Use
DWYER III HERBERT L (author)
2019-05-02
Patent
Electronic Resource
English
Offshore Heavy Lift Rigging Analysis Using Spreadsheet
Online Contents | 2009
|Offshore Heavy Lift Rigging Analysis Using Spreadsheet
British Library Online Contents | 2009
|