A platform for research: civil engineering, architecture and urbanism
STEEL PIPE COFFERDAM CONSTRUCTION METHOD USING SUCTION PENETRAION AND STACKING OF PIPE MEMBERS
A circular pipe member is penetrated into the seabed by a suction pressure, and a plurality of circular pipe members are vertically stacked thereon and integrated thereto to construct a cofferdam. When dismantling the cofferdam, the circular pipe members are disassembled and dismantled in order by using a lifting wire installed at a newly constructed structure installed in the inner space of the cofferdam.
STEEL PIPE COFFERDAM CONSTRUCTION METHOD USING SUCTION PENETRAION AND STACKING OF PIPE MEMBERS
A circular pipe member is penetrated into the seabed by a suction pressure, and a plurality of circular pipe members are vertically stacked thereon and integrated thereto to construct a cofferdam. When dismantling the cofferdam, the circular pipe members are disassembled and dismantled in order by using a lifting wire installed at a newly constructed structure installed in the inner space of the cofferdam.
STEEL PIPE COFFERDAM CONSTRUCTION METHOD USING SUCTION PENETRAION AND STACKING OF PIPE MEMBERS
LEE JU-HYUNG (author) / KIM JAE-HYUN (author) / KIM HAK-MAN (author)
2020-06-04
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Steel pipe cofferdam construction method using suction penetration and stacking of pipe members
European Patent Office | 2020
|Cofferdam Construction Method using Connection of Steel Pipe Members
European Patent Office | 2019
|Steel Pipe Cofferdam and Steel Pipe Cofferdam Installing Method
European Patent Office | 2023
|Steel Pipe Cofferdam and Steel Pipe Cofferdam Installing Method
European Patent Office | 2024