A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR USING PHOSPHOGYPSUM IN EMBANKMENT IMPROVEMENT
A construction and/or installation method for using phosphogypsum in embankment improvement includes preparing a phosphogypsum-containing embankment mixture, setting moisture content of an embankment mixture, paving a modified phosphogypsum-containing embankment, and reversely layering anti-seepage cushion layers from two sides of the embankment to the center of the embankment. The preparation of a phosphogypsum-containing embankment mixture can include the following: 90 parts by weight of phosphogypsum and 10 parts by weight of cement are weighted, uniformly mixed and stirred to obtain a base material mixture; and 2-4 parts by weight of sodium silicate is weighted and dissolved in water, and an obtained solution is added to the base material mixture to obtain the phosphogypsum-containing embankment mixture. The construction and/or installation method for using phosphogypsum in an embankment improvement can satisfy embankment strength and rebound modulus requirements, and can be widely applied to a filling-deficient area and an area with a relatively high yield of phosphogypsum solid wastes.
CONSTRUCTION METHOD FOR USING PHOSPHOGYPSUM IN EMBANKMENT IMPROVEMENT
A construction and/or installation method for using phosphogypsum in embankment improvement includes preparing a phosphogypsum-containing embankment mixture, setting moisture content of an embankment mixture, paving a modified phosphogypsum-containing embankment, and reversely layering anti-seepage cushion layers from two sides of the embankment to the center of the embankment. The preparation of a phosphogypsum-containing embankment mixture can include the following: 90 parts by weight of phosphogypsum and 10 parts by weight of cement are weighted, uniformly mixed and stirred to obtain a base material mixture; and 2-4 parts by weight of sodium silicate is weighted and dissolved in water, and an obtained solution is added to the base material mixture to obtain the phosphogypsum-containing embankment mixture. The construction and/or installation method for using phosphogypsum in an embankment improvement can satisfy embankment strength and rebound modulus requirements, and can be widely applied to a filling-deficient area and an area with a relatively high yield of phosphogypsum solid wastes.
CONSTRUCTION METHOD FOR USING PHOSPHOGYPSUM IN EMBANKMENT IMPROVEMENT
LI ZHIQING (author)
2020-08-20
Patent
Electronic Resource
English
Construction method for using phosphogypsum in embankment improvement
European Patent Office | 2022
|Improvement method of phosphogypsum for expansive soil embankment construction
European Patent Office | 2020
|CONSTRUCTION METHOD FOR PREVENTING LOESS EMBANKMENT SETTLEMENT BY USING PHOSPHOGYPSUM
European Patent Office | 2020
|Construction method for improving expansive soil embankment using phosphogypsum and microbe
European Patent Office | 2021
|CONSTRUCTION METHOD FOR IMPROVING EARTH-STONE MIXED EMBANKMENT USING PHOSPHOGYPSUM AND MICROBE
European Patent Office | 2021
|