A platform for research: civil engineering, architecture and urbanism
A siding panel installation system can include a support tray channel with a first leg and a second leg opposite the first leg, where the second leg of the support tray channel is offset from a mounting face plane of the first leg by a support tray connecting the first leg and the second leg together. The siding panel installation system can also include an inside mounting clip with an attachment leg and a support channel spaced apart from the attachment leg and offset from a mounting face plane of the attachment leg, where the support channel of the inside mounting clip is configured to receive the first leg of the support tray channel. The siding panel installation system can include an outside corner clip with an attachment leg and a support channel spaced apart from the attachment leg and offset from a mounting face plane of the attachment leg.
A siding panel installation system can include a support tray channel with a first leg and a second leg opposite the first leg, where the second leg of the support tray channel is offset from a mounting face plane of the first leg by a support tray connecting the first leg and the second leg together. The siding panel installation system can also include an inside mounting clip with an attachment leg and a support channel spaced apart from the attachment leg and offset from a mounting face plane of the attachment leg, where the support channel of the inside mounting clip is configured to receive the first leg of the support tray channel. The siding panel installation system can include an outside corner clip with an attachment leg and a support channel spaced apart from the attachment leg and offset from a mounting face plane of the attachment leg.
SIDING PANEL INSTALLATION
MATSON RUSSELL (author)
2021-04-15
Patent
Electronic Resource
English
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden