A platform for research: civil engineering, architecture and urbanism
PRESTRESSED-BOLTED DRY-ASSEMBLED SEGMENTAL PRECAST HYBRID TOWER WITH GROUTING-FREE
The present invention discloses a prestressed-bolted dry-assembled segmental precast hybrid tower with grouting-free, comprising a top steel tower tube, a reverse self-balancing steal-concrete transition section, and a prestressed-bolted dry-assembled segmental precast concrete tower with grouting-free dry fast splicing and a gear reinforced wind turbine foundation; the steel tower tube, the steel-concrete transition section, the concrete tower tube and the hollow wind turbine foundation are integrally connected from top to bottom through a prestressed steel strand system to improve the overall bending resistance of the tower; the upper end of the prestressed steel strands is anchored to the steel-concrete transition section, and the lower end is anchored to the bottom face of the wind turbine foundation corbel; the concrete tower tube is composed of a number of segmental tapered precast concrete tower segments, which are grouting free spliced vertically, and the vertical splicing utilizes positioning pins to accurately position the installation position. The prefabricated concrete tower tube segment is formed by a number of circular arc-shaped prefabricated concrete pipe segments with circumferential grouting free dry splicing. The segments are spliced into a whole by prestressed bolts and then installed staggered from top to bottom to enhance the shear resistance.
PRESTRESSED-BOLTED DRY-ASSEMBLED SEGMENTAL PRECAST HYBRID TOWER WITH GROUTING-FREE
The present invention discloses a prestressed-bolted dry-assembled segmental precast hybrid tower with grouting-free, comprising a top steel tower tube, a reverse self-balancing steal-concrete transition section, and a prestressed-bolted dry-assembled segmental precast concrete tower with grouting-free dry fast splicing and a gear reinforced wind turbine foundation; the steel tower tube, the steel-concrete transition section, the concrete tower tube and the hollow wind turbine foundation are integrally connected from top to bottom through a prestressed steel strand system to improve the overall bending resistance of the tower; the upper end of the prestressed steel strands is anchored to the steel-concrete transition section, and the lower end is anchored to the bottom face of the wind turbine foundation corbel; the concrete tower tube is composed of a number of segmental tapered precast concrete tower segments, which are grouting free spliced vertically, and the vertical splicing utilizes positioning pins to accurately position the installation position. The prefabricated concrete tower tube segment is formed by a number of circular arc-shaped prefabricated concrete pipe segments with circumferential grouting free dry splicing. The segments are spliced into a whole by prestressed bolts and then installed staggered from top to bottom to enhance the shear resistance.
PRESTRESSED-BOLTED DRY-ASSEMBLED SEGMENTAL PRECAST HYBRID TOWER WITH GROUTING-FREE
HUANG CHUNLIN (author) / ZHANG DONGLIANG (author) / TANG QUNYI (author) / SUN XINGJIAN (author) / CHEN JINJUN (author) / FENG WEIJIANG (author) / YU HUAFENG (author) / FU KUN (author) / LI TIANHAO (author) / WANG FEI (author)
2022-02-24
Patent
Electronic Resource
English
Prestressed-bolted dry-assembled segmental precast hybrid tower with grouting-free
European Patent Office | 2023
|Segmental Precast Prestressed Concrete Piles
NTIS | 1977
GROUTING-FREE DRY-TYPE PRESTRESSED BOLT SEGMENT-ASSEMBLED PREFABRICATED CONCRETE TOWER
European Patent Office | 2024
|