A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM
In a construction method using an excavator that is controlled by manual operation, and an excavator that includes an automatic working-equipment control unit automatically controlling second working equipment on the basis of at least one of a current terrain and a designed terrain of a construction range in a construction site, and a tooth-edge position of the second working equipment, a progress rate that indicates a volume of soil having been excavated by the excavator to a target volume of soil to be excavated by the excavator in the construction range is calculated, and when the progress rate is equal to or larger than a threshold, the excavator stops construction of the construction range, and the excavator takes over the construction of the construction range, from the excavator.
CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM
In a construction method using an excavator that is controlled by manual operation, and an excavator that includes an automatic working-equipment control unit automatically controlling second working equipment on the basis of at least one of a current terrain and a designed terrain of a construction range in a construction site, and a tooth-edge position of the second working equipment, a progress rate that indicates a volume of soil having been excavated by the excavator to a target volume of soil to be excavated by the excavator in the construction range is calculated, and when the progress rate is equal to or larger than a threshold, the excavator stops construction of the construction range, and the excavator takes over the construction of the construction range, from the excavator.
CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM
ONISHI YOSHIYUKI (author) / AOKI MITSUHIRO (author) / KURIHARA MASAHIRO (author) / SHIMADA KENJIRO (author) / UCHIZONO TOYOHITO (author)
2023-05-11
Patent
Electronic Resource
English
IPC:
E02F
Baggern
,
DREDGING