A platform for research: civil engineering, architecture and urbanism
A method can include removing material from surface material to regrade the surface material to include a declining elevation between a first point and a second point to eliminate ponding on the surface material between the first point and the second point.
A method can include removing material from surface material to regrade the surface material to include a declining elevation between a first point and a second point to eliminate ponding on the surface material between the first point and the second point.
PONDING ALLEVIATION PROCESS
HESTER AARON (author)
2023-05-11
Patent
Electronic Resource
English
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE