A platform for research: civil engineering, architecture and urbanism
Wellbore junction completion with fluid loss control
A method of installing a wellbore junction assembly in a well can include inserting a tubular string into a deflector, and opening a flow control device in response to the inserting. A well system can include a deflector positioned at an intersection between at least three wellbore sections, and a tubular string connector having at least two tubular strings connected to an end thereof, one tubular string being received in the deflector and engaged with a flow control device positioned in a wellbore section, and another tubular string being received in another wellbore section. Another method of installing a wellbore junction assembly in a well can include inserting a tubular string into a deflector positioned at a wellbore intersection, then sealingly engaging the tubular string, and then opening a flow control device in response to the inserting.
Wellbore junction completion with fluid loss control
A method of installing a wellbore junction assembly in a well can include inserting a tubular string into a deflector, and opening a flow control device in response to the inserting. A well system can include a deflector positioned at an intersection between at least three wellbore sections, and a tubular string connector having at least two tubular strings connected to an end thereof, one tubular string being received in the deflector and engaged with a flow control device positioned in a wellbore section, and another tubular string being received in another wellbore section. Another method of installing a wellbore junction assembly in a well can include inserting a tubular string into a deflector positioned at a wellbore intersection, then sealingly engaging the tubular string, and then opening a flow control device in response to the inserting.
Wellbore junction completion with fluid loss control
STEELE DAVID J (author)
2015-12-01
Patent
Electronic Resource
English
Polyisocyanurate based cement for wellbore fluid loss prevention
European Patent Office | 2017
|POLYISOCYANURATE BASED CEMENT FOR WELLBORE FLUID LOSS PREVENTION
European Patent Office | 2017
|WEIGHTED FLUID LOSS CONTROL PILL FOR COMPLETION & WORKOVER OPERATIONS
European Patent Office | 2021
|METHOD FOR STABILIZING WELLBORE, STABILIZED WELLBORE AND WELLBORE STABILIZING FLUID
European Patent Office | 2023
|METHOD FOR STABILIZING WELLBORE, STABILIZED WELLBORE AND WELLBORE STABILIZING FLUID
European Patent Office | 2024
|