A platform for research: civil engineering, architecture and urbanism
Settable compositions and methods of use
Disclosed herein are settable compositions and methods of using settable compositions in a wellbore. In one embodiment a method of introducing a settable composition into a wellbore is described. The method comprises providing a settable composition comprising pumice, hydrated lime, a set retarder, and water. Introducing the settable composition into a wellbore. Allowing the settable composition to remain static in the wellbore, wherein the settable composition remains in a pumpable fluid state for a period of about 1 day or longer while static in the wellbore.
Settable compositions and methods of use
Disclosed herein are settable compositions and methods of using settable compositions in a wellbore. In one embodiment a method of introducing a settable composition into a wellbore is described. The method comprises providing a settable composition comprising pumice, hydrated lime, a set retarder, and water. Introducing the settable composition into a wellbore. Allowing the settable composition to remain static in the wellbore, wherein the settable composition remains in a pumpable fluid state for a period of about 1 day or longer while static in the wellbore.
Settable compositions and methods of use
AGAPIOU KYRIACOS (author) / MARTINEZ JUAN HUMBERTO (author) / PISKLAK THOMAS JASON (author) / GOEL VIVEK S (author) / BROTHERS LANCE EVERETT (author) / IVERSON BENJAMIN JOHN (author)
2018-02-27
Patent
Electronic Resource
English