PREFABRICATED PILE CONSTRUCTION METHOD, PROGRAM, MEMORY MEDIUM, PILE FOUNDATION, AND PREFABRICATED PILE CONSTRUCTION SYSTEM
This invention includes: setting steps (S13, S14) for setting a plurality of expansion ratios representing the proportion of the inside diameter of an expansion excavation unit (5) relative to the outside diameter design value obtained by adding a desired clearance value to the outer diameter of the tip part (10a) of a prefabricated pile (10); a design-support-force-measuring step (S16) for performing a load test with regards to one or more expansion ratios selected from the expansion ratios, and measuring the design support force for the prefabricated pile for the respective expansion ratio; a design-support-force-determining step (S17) for determining whether or not the product of the design support force and the number of prefabricated piles to be used is equal to or greater than the desired design load acting on a pile foundation formed by the prefabricated piles; an optimum-expansion-ratio-determining step (S18) for determining the smallest of the expansion ratios satisfying the criterion of the product being equal to or greater than the design load to be the optimum expansion ratio for the expansion excavation unit; and an expansion-excavation-unit-formation step (S19) for forming the expansion excavation unit on the basis of the optimum expansion ratio.
La présente invention comprend : des étapes de réglage (S13, S14) pour régler une pluralité de rapports d'expansion représentant la proportion du diamètre intérieur d'une unité d'excavation à expansion (5) par rapport à la valeur de conception de diamètre extérieur obtenue par l'ajout d'une valeur de jeu souhaitée au diamètre extérieur de la partie de pointe (10a) d'un pieu préfabriqué (10) ; une étape de mesure de force de support de conception (S16) pour effectuer un essai de charge par rapport à un ou plusieurs rapports d'expansion sélectionnés parmi les rapports d'expansion, et pour mesurer la force de support de conception pour le pieu préfabriqué pour le rapport d'expansion respectif ; une étape de détermination de force de support de conception (S17) pour déterminer si le produit de la force de support de conception et du nombre de pieux préfabriqués à utiliser est supérieur ou égal à la charge de conception souhaitée agissant sur une fondation de pieu formée par les pieux préfabriqués ; d'une étape de détermination de rapport d'expansion optimum (S18) pour déterminer le plus petit des rapports d'expansion satisfaisant le critère du produit supérieur ou égal à la charge de conception comme étant le rapport d'expansion optimum pour l'unité d'excavation à expansion ; et d'une étape de formation d'unité d'excavation à expansion (S19) pour former l'unité d'excavation à expansion sur la base du rapport d'expansion optimum.
既製杭(10)の先端部(10a)の外径に所望のクリアランス値を加算して求めた外径設計値に対する拡大掘削部(5)の内径の割合を示す拡大比を複数設定する設定工程(S13、S14)と、当該複数の拡大比の中から選択した一又は複数の拡大比の場合について載荷試験を実施し、当該拡大比における既製杭の設計支持力を測定する設計支持力測定工程(S16)と、当該設計支持力と使用する既製杭の本数との積が既製杭により形成される杭基礎に作用する所望の設計荷重以上であるか否か判定する設計支持力判定工程(S17)と、当該積が設計荷重以上である条件を満たす拡大比のうち最小の拡大比を拡大掘削部の最適拡大比に決定する最適拡大比決定工程(S18)と、最適拡大比に基づいて拡大掘削部を形成する拡大掘削部形成工程(S19)と、を含む。
PREFABRICATED PILE CONSTRUCTION METHOD, PROGRAM, MEMORY MEDIUM, PILE FOUNDATION, AND PREFABRICATED PILE CONSTRUCTION SYSTEM
This invention includes: setting steps (S13, S14) for setting a plurality of expansion ratios representing the proportion of the inside diameter of an expansion excavation unit (5) relative to the outside diameter design value obtained by adding a desired clearance value to the outer diameter of the tip part (10a) of a prefabricated pile (10); a design-support-force-measuring step (S16) for performing a load test with regards to one or more expansion ratios selected from the expansion ratios, and measuring the design support force for the prefabricated pile for the respective expansion ratio; a design-support-force-determining step (S17) for determining whether or not the product of the design support force and the number of prefabricated piles to be used is equal to or greater than the desired design load acting on a pile foundation formed by the prefabricated piles; an optimum-expansion-ratio-determining step (S18) for determining the smallest of the expansion ratios satisfying the criterion of the product being equal to or greater than the design load to be the optimum expansion ratio for the expansion excavation unit; and an expansion-excavation-unit-formation step (S19) for forming the expansion excavation unit on the basis of the optimum expansion ratio.
La présente invention comprend : des étapes de réglage (S13, S14) pour régler une pluralité de rapports d'expansion représentant la proportion du diamètre intérieur d'une unité d'excavation à expansion (5) par rapport à la valeur de conception de diamètre extérieur obtenue par l'ajout d'une valeur de jeu souhaitée au diamètre extérieur de la partie de pointe (10a) d'un pieu préfabriqué (10) ; une étape de mesure de force de support de conception (S16) pour effectuer un essai de charge par rapport à un ou plusieurs rapports d'expansion sélectionnés parmi les rapports d'expansion, et pour mesurer la force de support de conception pour le pieu préfabriqué pour le rapport d'expansion respectif ; une étape de détermination de force de support de conception (S17) pour déterminer si le produit de la force de support de conception et du nombre de pieux préfabriqués à utiliser est supérieur ou égal à la charge de conception souhaitée agissant sur une fondation de pieu formée par les pieux préfabriqués ; d'une étape de détermination de rapport d'expansion optimum (S18) pour déterminer le plus petit des rapports d'expansion satisfaisant le critère du produit supérieur ou égal à la charge de conception comme étant le rapport d'expansion optimum pour l'unité d'excavation à expansion ; et d'une étape de formation d'unité d'excavation à expansion (S19) pour former l'unité d'excavation à expansion sur la base du rapport d'expansion optimum.
既製杭(10)の先端部(10a)の外径に所望のクリアランス値を加算して求めた外径設計値に対する拡大掘削部(5)の内径の割合を示す拡大比を複数設定する設定工程(S13、S14)と、当該複数の拡大比の中から選択した一又は複数の拡大比の場合について載荷試験を実施し、当該拡大比における既製杭の設計支持力を測定する設計支持力測定工程(S16)と、当該設計支持力と使用する既製杭の本数との積が既製杭により形成される杭基礎に作用する所望の設計荷重以上であるか否か判定する設計支持力判定工程(S17)と、当該積が設計荷重以上である条件を満たす拡大比のうち最小の拡大比を拡大掘削部の最適拡大比に決定する最適拡大比決定工程(S18)と、最適拡大比に基づいて拡大掘削部を形成する拡大掘削部形成工程(S19)と、を含む。
PREFABRICATED PILE CONSTRUCTION METHOD, PROGRAM, MEMORY MEDIUM, PILE FOUNDATION, AND PREFABRICATED PILE CONSTRUCTION SYSTEM
PROCÉDÉ DE CONSTRUCTION DE PIEU PRÉFABRIQUÉ, PROGRAMME, SUPPORT DE MÉMOIRE, FONDATION DE PIEU, ET SYSTÈME DE CONSTRUCTION DE PIEU PRÉFABRIQUÉ
既製杭の施工方法、プログラム、記憶媒体、杭基礎、及び既製杭の施工システム
GOAN MITSUMARU (author) / SUZUKI YOSHIKAZU (author)
2015-09-03
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|European Patent Office | 2023
|European Patent Office | 2024
|Prefabricated foundation pile and construction method thereof
European Patent Office | 2020
|European Patent Office | 2015
|