PILING CONSTRUCTION MANAGEMENT METHOD
Provided is a piling construction management method that allows elimination of the effort of redoing piling construction because of insufficient support force by very easily and reliably determining whether the support force of a piling hole is sufficient for the distal end of a piling when erecting piling in a piling hole. The support strength of a hole bottom Hb2 is measured with a penetration testing device M1 before erecting a piling in a piling hole H1. The piling is erected in the piling hole H1 when the measurement is at or above a prescribed value , whereas the piling hole H1 is dug again and the support strength of the hole bottom Hb2 after being dug again is measured with the penetration testing device M1 in the same manner when the measurement is less than the prescribed value. A piling with a length corresponding to the piling hole H2 after being dug again is erected when the measurement is equal to or greater than the prescribed value. The penetration testing device M1: is one in which a knocking block 51 on which a penetration shaft 4 is integrated is struck by a drive hammer 52 in free-fall; comprises a lifting mechanism 8 that lifts the drive hammer 52 after falling to a prescribed height and releases same; and determines the support strength from the number of impacts required for the penetration shaft 4 to penetrate to a prescribed depth from the hole bottom Hb1.
L'invention concerne un procédé de gestion de construction de pilotis qui permet d'éliminer des efforts de ré-exécution de construction de pilotis en raison d'une résistance de support insuffisante en déterminant de manière très simple et fiable si la résistance de support d'un trou de pilotis est suffisante pour l'extrémité distale d'un pilotis lorsqu'est érigé un pilotis dans un trou de pilotis. La résistance de support d'un fond de trou Hb2 est mesurée au moyen d'un dispositif de test de pénétration M1 avant d'ériger un pilotis dans un trou de pilotis H1. Le pilotis est érigé dans le trou de pilotis H1 lorsque la mesure est supérieure ou égale à une valeur prescrite, tandis que le trou de pilotis H1 est creusé à nouveau et la résistance de support du fond de trou Hb2 après avoir été creusé est mesurée au moyen du dispositif de test de pénétration M1 de la même manière que lorsque la mesure est inférieure à la valeur prescrite. Un pilotis présentant une longueur correspondant au trou de pilotis H2 après avoir été creusé est érigé lorsque la mesure est supérieure ou égale à la valeur prescrite. Le dispositif de test de pénétration M1 : est caractérisé en ce qu'un bloc de cognement 51 sur lequel est intégré un arbre de pénétration 4 est frappé par un marteau d'entraînement 52 en chute libre ; comprend un mécanisme de levage 8 qui soulève le marteau d'entraînement 52 après une chute à une hauteur prescrite et le libère ; et détermine la résistance de support à partir du nombre d'impacts requis pour la pénétration de l'arbre de pénétration 4 à une profondeur prescrite depuis le fond de trou Hb1.
杭孔内に杭を建て込む際、杭孔について杭先端の支持力が充分であるか否かを極めて簡易に且つ確実に判定し、支持力不足による杭施工のやり直しの手間を省き得る杭施工管理方法を提供する。杭孔H1への杭の建て込み前に、貫入試験機M1で孔底Hb2の支持強度を測定し、所定値以上である場合に杭孔H1に杭を建て込む一方、所定値に満たない場合に杭孔H1を再掘削し、再掘削後の孔底Hb2の支持強度を貫入試験機M1で同様に測定し、所定値以上に達した際に再掘削後の杭孔H2に対応する長さの杭を建て込む。貫入試験機M1は、貫入軸4が一体化したノッキングブロック51をドライブハンマー52の自由落下によって打撃するもので、落下後のドライブハンマー52を吊り上げて所定高さで下放する吊上げ機構8を備え、貫入軸4が孔底Hb1から所定深さまで貫入するのに要する打撃回数から支持強度を判定する。
PILING CONSTRUCTION MANAGEMENT METHOD
Provided is a piling construction management method that allows elimination of the effort of redoing piling construction because of insufficient support force by very easily and reliably determining whether the support force of a piling hole is sufficient for the distal end of a piling when erecting piling in a piling hole. The support strength of a hole bottom Hb2 is measured with a penetration testing device M1 before erecting a piling in a piling hole H1. The piling is erected in the piling hole H1 when the measurement is at or above a prescribed value , whereas the piling hole H1 is dug again and the support strength of the hole bottom Hb2 after being dug again is measured with the penetration testing device M1 in the same manner when the measurement is less than the prescribed value. A piling with a length corresponding to the piling hole H2 after being dug again is erected when the measurement is equal to or greater than the prescribed value. The penetration testing device M1: is one in which a knocking block 51 on which a penetration shaft 4 is integrated is struck by a drive hammer 52 in free-fall; comprises a lifting mechanism 8 that lifts the drive hammer 52 after falling to a prescribed height and releases same; and determines the support strength from the number of impacts required for the penetration shaft 4 to penetrate to a prescribed depth from the hole bottom Hb1.
L'invention concerne un procédé de gestion de construction de pilotis qui permet d'éliminer des efforts de ré-exécution de construction de pilotis en raison d'une résistance de support insuffisante en déterminant de manière très simple et fiable si la résistance de support d'un trou de pilotis est suffisante pour l'extrémité distale d'un pilotis lorsqu'est érigé un pilotis dans un trou de pilotis. La résistance de support d'un fond de trou Hb2 est mesurée au moyen d'un dispositif de test de pénétration M1 avant d'ériger un pilotis dans un trou de pilotis H1. Le pilotis est érigé dans le trou de pilotis H1 lorsque la mesure est supérieure ou égale à une valeur prescrite, tandis que le trou de pilotis H1 est creusé à nouveau et la résistance de support du fond de trou Hb2 après avoir été creusé est mesurée au moyen du dispositif de test de pénétration M1 de la même manière que lorsque la mesure est inférieure à la valeur prescrite. Un pilotis présentant une longueur correspondant au trou de pilotis H2 après avoir été creusé est érigé lorsque la mesure est supérieure ou égale à la valeur prescrite. Le dispositif de test de pénétration M1 : est caractérisé en ce qu'un bloc de cognement 51 sur lequel est intégré un arbre de pénétration 4 est frappé par un marteau d'entraînement 52 en chute libre ; comprend un mécanisme de levage 8 qui soulève le marteau d'entraînement 52 après une chute à une hauteur prescrite et le libère ; et détermine la résistance de support à partir du nombre d'impacts requis pour la pénétration de l'arbre de pénétration 4 à une profondeur prescrite depuis le fond de trou Hb1.
杭孔内に杭を建て込む際、杭孔について杭先端の支持力が充分であるか否かを極めて簡易に且つ確実に判定し、支持力不足による杭施工のやり直しの手間を省き得る杭施工管理方法を提供する。杭孔H1への杭の建て込み前に、貫入試験機M1で孔底Hb2の支持強度を測定し、所定値以上である場合に杭孔H1に杭を建て込む一方、所定値に満たない場合に杭孔H1を再掘削し、再掘削後の孔底Hb2の支持強度を貫入試験機M1で同様に測定し、所定値以上に達した際に再掘削後の杭孔H2に対応する長さの杭を建て込む。貫入試験機M1は、貫入軸4が一体化したノッキングブロック51をドライブハンマー52の自由落下によって打撃するもので、落下後のドライブハンマー52を吊り上げて所定高さで下放する吊上げ機構8を備え、貫入軸4が孔底Hb1から所定深さまで貫入するのに要する打撃回数から支持強度を判定する。
PILING CONSTRUCTION MANAGEMENT METHOD
PROCÉDÉ DE GESTION DE CONSTRUCTION DE PILOTIS
杭施工管理方法
KASHIMOTO TAKAHIKO (author)
2017-06-29
Patent
Electronic Resource
Japanese