A platform for research: civil engineering, architecture and urbanism
PILING FOUNDATION STRUCTURE
Provided is a piling foundation structure that is easy to construct, thereby reducing construction costs and shortening construction time, and for which absorption of pile construction errors is easy. A piling 3 is joined to the foundation of an upper structure via a metal joint 2. The metal joint 2 has piling-side hardware 6 that joins with a piling head, foundation-side hardware 7 that directly joins with the foundation, and position adjustment hardware 8 that is interposed between the piling-side hardware and the foundation-side hardware. The piling-side hardware 6 is joined to the piling head by way of a pair of halved members 6d that have, fixed to the upper portion thereof, a horizontal plate 6c having a first joint bolt 6e for joining the position adjustment hardware. The position adjustment hardware 8 has: two y-axis direction first elongated holes 8b that are in a plate body 8a and into which two first joint bolts 6e are inserted; and two second joint bolts 8c for joining the foundation-side hardware. The foundation-side hardware 7 has: two x-axis direction second elongated holes 7b that are in a plate body 7a and into which the two second joint bolts 8c are inserted; and a rib 7c for aligning with respect to the foundation.
L'invention concerne une structure de fondation de pieu qui est facile à construire, en permettant ainsi de réduire les coûts de construction et de raccourcir le temps de construction, et pour laquelle l'absorption d'erreurs de construction de pieu est facile. Un pieu (3) est relié à la fondation d'une structure supérieure par l'intermédiaire d'un joint métallique (2). Le joint métallique (2) comporte un matériel côté pieu (6) qui est relié à une tête de pieu, un matériel côté fondation (7) qui est directement relié à la fondation, et un matériel de réglage de position (8) qui est intercalé entre le matériel côté pieu et le matériel côté fondation. Le matériel côté pieu (6) est relié à la tête de pieu au moyen d'une paire de demi-éléments (6d) qui ont, fixée à leur partie supérieure, une plaque horizontale (6c) ayant un premier boulon fourchu (6e) pour relier le matériel de réglage de position. Le matériel de réglage de position (8) comprend : deux premiers trous allongés (8b) dans la direction d'axe y, qui sont dans un corps de plaque (8a) et dans lesquels deux premiers boulons fourchus (6e) sont insérés ; et deux seconds boulons fourchus (8c) pour relier le matériel côté fondation. Le matériel côté fondation (7) comprend : deux seconds trous allongés (7b) dans la direction d'axe x, qui sont dans un corps de plaque (7a) et dans lesquels les deux seconds boulons fourchus (8c) sont insérés ; et une nervure (7c) pour s'aligner par rapport à la fondation.
施工が簡単で施工コストの低減、工期短縮が可能、かつ杭の施工誤差吸収操作が容易な杭基礎構造を提供する。杭3と上部構造物の土台とを接合金物2を介して接合する。接合金物2は杭頭部と接合する杭側金物6と、土台と直接接合する土台側金物7と、杭側金物と土台側金物との間に介在する位置調整金物8とを持つ。杭側金物6は対位置調整金物接合用の第1接合用ボルト6eを持つ水平プレート6cを上部に固定した一対の半割部材6dにより杭頭部に接合される。位置調整金物8は板状本体8aに前記2つの第1接合用ボルト6eが挿入されるY軸方向の2つの第1長孔8bを有し、対土台側金物接合用の2つの第2接合用ボルト8cを持つ。土台側金物7は、板状本体7aに前記2つの第2接合用ボルト8cが挿入されるX軸方向に長い2つの第2長孔7bを有し、かつ、土台に対する位置合わせ用のリブ7cを有する。
PILING FOUNDATION STRUCTURE
Provided is a piling foundation structure that is easy to construct, thereby reducing construction costs and shortening construction time, and for which absorption of pile construction errors is easy. A piling 3 is joined to the foundation of an upper structure via a metal joint 2. The metal joint 2 has piling-side hardware 6 that joins with a piling head, foundation-side hardware 7 that directly joins with the foundation, and position adjustment hardware 8 that is interposed between the piling-side hardware and the foundation-side hardware. The piling-side hardware 6 is joined to the piling head by way of a pair of halved members 6d that have, fixed to the upper portion thereof, a horizontal plate 6c having a first joint bolt 6e for joining the position adjustment hardware. The position adjustment hardware 8 has: two y-axis direction first elongated holes 8b that are in a plate body 8a and into which two first joint bolts 6e are inserted; and two second joint bolts 8c for joining the foundation-side hardware. The foundation-side hardware 7 has: two x-axis direction second elongated holes 7b that are in a plate body 7a and into which the two second joint bolts 8c are inserted; and a rib 7c for aligning with respect to the foundation.
L'invention concerne une structure de fondation de pieu qui est facile à construire, en permettant ainsi de réduire les coûts de construction et de raccourcir le temps de construction, et pour laquelle l'absorption d'erreurs de construction de pieu est facile. Un pieu (3) est relié à la fondation d'une structure supérieure par l'intermédiaire d'un joint métallique (2). Le joint métallique (2) comporte un matériel côté pieu (6) qui est relié à une tête de pieu, un matériel côté fondation (7) qui est directement relié à la fondation, et un matériel de réglage de position (8) qui est intercalé entre le matériel côté pieu et le matériel côté fondation. Le matériel côté pieu (6) est relié à la tête de pieu au moyen d'une paire de demi-éléments (6d) qui ont, fixée à leur partie supérieure, une plaque horizontale (6c) ayant un premier boulon fourchu (6e) pour relier le matériel de réglage de position. Le matériel de réglage de position (8) comprend : deux premiers trous allongés (8b) dans la direction d'axe y, qui sont dans un corps de plaque (8a) et dans lesquels deux premiers boulons fourchus (6e) sont insérés ; et deux seconds boulons fourchus (8c) pour relier le matériel côté fondation. Le matériel côté fondation (7) comprend : deux seconds trous allongés (7b) dans la direction d'axe x, qui sont dans un corps de plaque (7a) et dans lesquels les deux seconds boulons fourchus (8c) sont insérés ; et une nervure (7c) pour s'aligner par rapport à la fondation.
施工が簡単で施工コストの低減、工期短縮が可能、かつ杭の施工誤差吸収操作が容易な杭基礎構造を提供する。杭3と上部構造物の土台とを接合金物2を介して接合する。接合金物2は杭頭部と接合する杭側金物6と、土台と直接接合する土台側金物7と、杭側金物と土台側金物との間に介在する位置調整金物8とを持つ。杭側金物6は対位置調整金物接合用の第1接合用ボルト6eを持つ水平プレート6cを上部に固定した一対の半割部材6dにより杭頭部に接合される。位置調整金物8は板状本体8aに前記2つの第1接合用ボルト6eが挿入されるY軸方向の2つの第1長孔8bを有し、対土台側金物接合用の2つの第2接合用ボルト8cを持つ。土台側金物7は、板状本体7aに前記2つの第2接合用ボルト8cが挿入されるX軸方向に長い2つの第2長孔7bを有し、かつ、土台に対する位置合わせ用のリブ7cを有する。
PILING FOUNDATION STRUCTURE
STRUCTURE DE FONDATION DE PIEU
杭基礎構造
HAYASAKA YASUNORI (author) / OKADA TADAYOSHI (author) / ISHIMARU RYO (author) / TERADA SHIMPEI (author) / HIRATA KOICHIRO (author) / TODA TOSHIHIKO (author) / TAKASE YUJI (author) / IMAIZUMI TAKAYUKI (author) / FUKUYAMA TADASHI (author) / ODA YUJI (author)
2017-10-05
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
TIBKAT | 1962
British Library Conference Proceedings | 2005
|Foundation methods involving piling
Engineering Index Backfile | 1932
|