A platform for research: civil engineering, architecture and urbanism
PROCESS OF FLASH FLOODS DRAINAGE FROM GRAVEL ROADS
Due to the increasing rainfall (rain, l/s, m2) lately, the problem of drainage of torrential surface water from sections of gravel roads with longitudinal slope should be dealt with more efficiently than it was the case with road construction with transverse slope. By installing permeable channels with trapezoidal cross-section with higher permeability comparing to the unbound surface layer of road structure, the road life-cycle increases. The installation of channels slightly increases investment costs of the road construction. Trapezoidal cross-section should lead to the stability of channels installed in the layers of road pavement structure, whereas the crushed stone filling which is less dense than the surface wear layer of road pavement structure (mainly a cavity to accept water) enables the sinking of torrential water from the pavement structure and discharge away from the road.
En raison de l'augmentation récente de la pluviométrie (pluie, l/s, m2), le problème de drainage de l'eau de surface torrentielle de sections de routes de gravier présentant une pente longitudinale doit être traité plus efficacement qu'auparavant avec une construction de route présentant une pente transversale. Par l'installation de canaux perméables présentant une section transversale trapézoïdale présentant une perméabilité supérieure par rapport à la couche de surface non liée d'une structure de route, le cycle de vie de la route augmente. L'installation de canaux augmente légèrement les coûts d'investissement de la construction de route. Une section transversale trapézoïdale devrait conduire à la stabilité de canaux installés dans les couches de structure de chaussée routière, tandis que la charge de pierre broyée qui est moins dense que la couche d'usure de surface de la structure de chaussée routière (principalement une cavité permettant l'admission d'eau) permet l'absorption d'eau torrentielle provenant de la structure de chaussée et son évacuation à distance de la route.
PROCESS OF FLASH FLOODS DRAINAGE FROM GRAVEL ROADS
Due to the increasing rainfall (rain, l/s, m2) lately, the problem of drainage of torrential surface water from sections of gravel roads with longitudinal slope should be dealt with more efficiently than it was the case with road construction with transverse slope. By installing permeable channels with trapezoidal cross-section with higher permeability comparing to the unbound surface layer of road structure, the road life-cycle increases. The installation of channels slightly increases investment costs of the road construction. Trapezoidal cross-section should lead to the stability of channels installed in the layers of road pavement structure, whereas the crushed stone filling which is less dense than the surface wear layer of road pavement structure (mainly a cavity to accept water) enables the sinking of torrential water from the pavement structure and discharge away from the road.
En raison de l'augmentation récente de la pluviométrie (pluie, l/s, m2), le problème de drainage de l'eau de surface torrentielle de sections de routes de gravier présentant une pente longitudinale doit être traité plus efficacement qu'auparavant avec une construction de route présentant une pente transversale. Par l'installation de canaux perméables présentant une section transversale trapézoïdale présentant une perméabilité supérieure par rapport à la couche de surface non liée d'une structure de route, le cycle de vie de la route augmente. L'installation de canaux augmente légèrement les coûts d'investissement de la construction de route. Une section transversale trapézoïdale devrait conduire à la stabilité de canaux installés dans les couches de structure de chaussée routière, tandis que la charge de pierre broyée qui est moins dense que la couche d'usure de surface de la structure de chaussée routière (principalement une cavité permettant l'admission d'eau) permet l'absorption d'eau torrentielle provenant de la structure de chaussée et son évacuation à distance de la route.
PROCESS OF FLASH FLOODS DRAINAGE FROM GRAVEL ROADS
PROCÉDÉ DE DRAINAGE PAR INONDATION FLASH DE ROUTES DE GRAVIER PRÉSENTANT UNE PENTE LONGITUDINALE
PETROVIĆ PERO (author)
2018-05-11
Patent
Electronic Resource
English
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Engineering Index Backfile | 1919
|Engineering Index Backfile | 1918
|Engineering Index Backfile | 1915
|