A platform for research: civil engineering, architecture and urbanism
INSTALLATION DE PRODUCTION DE CLINKER ET PROCÉDÉ DE PRODUCTION DE CLINKER DANS UNE TELLE INSTALLATION
Facility (1) for producing clinker, comprising: a preheating assembly (2); a calcination assembly (3); an oven (4); and a cooler (5). According to the invention, the calcination assembly comprises a calcination reactor (8) involving calcination by combustion of a so-called alternative solid fuel, the calcination reactor (8) being arranged such that: at least a portion of the combustion gases from the oven (4) passes through a portion of the calcination reactor (8) before returning to the preheating assembly (2), and a tertiary gas flow comprising air released from the cooler (5) passes through the calcination reactor (8) before returning to the preheating assembly (2). In addition, the calcination reactor (8) comprises a system for adjusting the dwell time of the alternative solid fuel.
Installation ( 1) de production de clinker comprenant : un ensemble (2) de préchauffage; un ensemble (3) de calcination; un four (4); un refroidisseur (5); dans laquelle l'ensemble de calcination comprend un réacteur (8) de calcination par combustion d'un combustible solide dit alternatif, le réacteur (8) de calcination étant disposé, de sorte que : au moins une partie des fumées de combustion du four (4) traverse partie le réacteur (8) de calcination avant de rentrer dans l'ensemble (2) de préchauffage, un flux gazeux tertiaire comprenant de l'air sortant du refroidisseur (5) traverse le réacteur (8) de calcination avant de rentrer dans l'ensemble (2) de préchauffage, et dans laquelle le réacteur (8) de calcination comprend un système de réglage du temps de séjour du combustible solide alternatif.
INSTALLATION DE PRODUCTION DE CLINKER ET PROCÉDÉ DE PRODUCTION DE CLINKER DANS UNE TELLE INSTALLATION
Facility (1) for producing clinker, comprising: a preheating assembly (2); a calcination assembly (3); an oven (4); and a cooler (5). According to the invention, the calcination assembly comprises a calcination reactor (8) involving calcination by combustion of a so-called alternative solid fuel, the calcination reactor (8) being arranged such that: at least a portion of the combustion gases from the oven (4) passes through a portion of the calcination reactor (8) before returning to the preheating assembly (2), and a tertiary gas flow comprising air released from the cooler (5) passes through the calcination reactor (8) before returning to the preheating assembly (2). In addition, the calcination reactor (8) comprises a system for adjusting the dwell time of the alternative solid fuel.
Installation ( 1) de production de clinker comprenant : un ensemble (2) de préchauffage; un ensemble (3) de calcination; un four (4); un refroidisseur (5); dans laquelle l'ensemble de calcination comprend un réacteur (8) de calcination par combustion d'un combustible solide dit alternatif, le réacteur (8) de calcination étant disposé, de sorte que : au moins une partie des fumées de combustion du four (4) traverse partie le réacteur (8) de calcination avant de rentrer dans l'ensemble (2) de préchauffage, un flux gazeux tertiaire comprenant de l'air sortant du refroidisseur (5) traverse le réacteur (8) de calcination avant de rentrer dans l'ensemble (2) de préchauffage, et dans laquelle le réacteur (8) de calcination comprend un système de réglage du temps de séjour du combustible solide alternatif.
INSTALLATION DE PRODUCTION DE CLINKER ET PROCÉDÉ DE PRODUCTION DE CLINKER DANS UNE TELLE INSTALLATION
CLINKER PRODUCTION FACILITY AND METHOD FOR PRODUCING CLINKER IN SUCH A FACILITY
CHARMET JEAN-MICHEL (author) / GUIMARD YANNICK (author)
2019-06-20
Patent
Electronic Resource
French
IPC:
C04B
Kalk
,
LIME
European Patent Office | 2021
|European Patent Office | 2019
|European Patent Office | 2021
|European Patent Office | 2016
|European Patent Office | 2015
|