PREFABRICATED MODULE INTERCONNECTION FOR MODULAR BUILDING
An attachment between adjacent concrete-based prefabricated modules in a single storey of a multi-storey modular building is provided. A first concrete-based prefabricated module includes at least two vertical walls and at least a ceiling or a floor. A plurality of first reinforcing attachment members is connected to a first vertical wall including periodic projections extending from the first vertical wall. The second module similarly includes at least two vertical walls, ceiling or floor, and attachment members. The first prefabricated module and the second prefabricated module are positioned adjacent to one another such that the first attachment member periodic projections face the second attachment member periodic projections. A tie assembly engages the first and second attachment member periodic projections. In-situ cast concrete embeds the first and second attachment members and fills a space between the first module first vertical wall and the second module second vertical wall.
La présente invention concerne une fixation entre des modules préfabriqués à base de béton adjacents dans un étage unique d'un bâtiment modulaire à plusieurs étages. Un premier module préfabriqué à base de béton comprend au moins deux parois verticales et au moins un plafond ou un plancher. Une pluralité de premiers éléments de fixation de renforcement est reliée à une première paroi verticale comprenant des saillies périodiques s'étendant à partir de la première paroi verticale. Le second module comprend de façon similaire au moins deux parois verticales, un plafond ou un plancher et des éléments de fixation. Le premier module préfabriqué et le second module préfabriqué sont positionnés adjacents l'un à l'autre de telle sorte que les premières saillies périodiques de l'élément de fixation soient orientées vers les secondes saillies périodiques de l'élément de fixation. Un ensemble de liaison vient en prise avec les premières et secondes saillies périodiques de l'élément de fixation. Du béton coulé in situ incorpore les premier et second éléments de fixation et remplit un espace entre la première paroi verticale du premier module et la seconde paroi verticale du second module.
PREFABRICATED MODULE INTERCONNECTION FOR MODULAR BUILDING
An attachment between adjacent concrete-based prefabricated modules in a single storey of a multi-storey modular building is provided. A first concrete-based prefabricated module includes at least two vertical walls and at least a ceiling or a floor. A plurality of first reinforcing attachment members is connected to a first vertical wall including periodic projections extending from the first vertical wall. The second module similarly includes at least two vertical walls, ceiling or floor, and attachment members. The first prefabricated module and the second prefabricated module are positioned adjacent to one another such that the first attachment member periodic projections face the second attachment member periodic projections. A tie assembly engages the first and second attachment member periodic projections. In-situ cast concrete embeds the first and second attachment members and fills a space between the first module first vertical wall and the second module second vertical wall.
La présente invention concerne une fixation entre des modules préfabriqués à base de béton adjacents dans un étage unique d'un bâtiment modulaire à plusieurs étages. Un premier module préfabriqué à base de béton comprend au moins deux parois verticales et au moins un plafond ou un plancher. Une pluralité de premiers éléments de fixation de renforcement est reliée à une première paroi verticale comprenant des saillies périodiques s'étendant à partir de la première paroi verticale. Le second module comprend de façon similaire au moins deux parois verticales, un plafond ou un plancher et des éléments de fixation. Le premier module préfabriqué et le second module préfabriqué sont positionnés adjacents l'un à l'autre de telle sorte que les premières saillies périodiques de l'élément de fixation soient orientées vers les secondes saillies périodiques de l'élément de fixation. Un ensemble de liaison vient en prise avec les premières et secondes saillies périodiques de l'élément de fixation. Du béton coulé in situ incorpore les premier et second éléments de fixation et remplit un espace entre la première paroi verticale du premier module et la seconde paroi verticale du second module.
PREFABRICATED MODULE INTERCONNECTION FOR MODULAR BUILDING
INTERCONNEXION DE MODULES PRÉFABRIQUÉS POUR UN BÂTIMENT MODULAIRE
LEUNG WAI MAN (author) / CHOU GARY SHUE KAI (author)
2020-05-22
Patent
Electronic Resource
English
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
PREFABRICATED MODULE INTERCONNECTION FOR MODULAR BUILDING
European Patent Office | 2021
|Prefabricated module interconnection device of modular building