A platform for research: civil engineering, architecture and urbanism
FABRICATED REINFORCED CONCRETE BRIDGE PIER AND CONSTRUCTION METHOD THEREFOR
Provided in the present invention is a fabricated reinforced concrete bridge pier, comprising a hollow bridge pier shell and cast-in-situ core concrete disposed in the bridge pier shell. The bridge pier shell comprises a concrete layer and a steel cage. The steel cage is provided at an inner part of the concrete layer; and the steel cage comprises several hoop reinforcement meshes and several vertical steel bars, the several hoop reinforcement meshes are equidistantly spaced apart in the vertical direction, and the several vertical steel bars are equidistantly spaced apart along the hoop reinforcement meshes. Provided in the present invention is a construction method for a fabricated reinforced concrete bridge pier, wherein a steel cage and formwork are fabricated, then concrete is poured between the formwork to coagulate into a whole so as to form an integrated bridge pier shell, the bridge pier shell is transported to a construction site, and cast-in-situ core concrete is poured into a hollow hole of the bridge pier shell. Provided in the present invention are a fabricated reinforced concrete bridge pier, which is lightweight and has a short construction period, greatly reduces transportation and hoisting difficulties, provides a plurality of construction methods and has good overall performance once the structure is formed, and a construction method therefor.
La présente invention concerne une pile de pont en béton armé préfabriqué comprenant une coque de pile de pont creuse et un béton de cœur coulé sur place disposé dans la coque de pile de pont. La coque de pile de pont comprend une couche de béton et une cage en acier. La cage en acier est disposée au niveau d'une partie interne de la couche de béton ; et la cage en acier comprend plusieurs mailles de renforcement de frettage et plusieurs barres d'acier verticales, les plusieurs mailles de renforcement de frettage sont espacées de manière équidistante dans la direction verticale et les plusieurs barres d'acier verticales sont espacées de manière équidistante le long des mailles de renforcement de frettage. La présente invention concerne un procédé de construction pour une pile de pont en béton armé préfabriqué, dans lequel une cage en acier et un coffrage sont fabriqués, puis du béton est versé dans le coffrage pour coaguler dans un ensemble de manière à former une coque de pile de pont intégrée, la coque de pile de pont est transportée vers un site de construction, et du béton de cœur coulé sur place est versé dans un trou creux de la coque de pile de pont. La présente invention concerne une pile de pont en béton armé préfabriqué, qui est légère et présente une courte période de construction, réduit considérablement les difficultés de transport et de levage, fournit une pluralité de procédés de construction et présente de bonnes performances globales une fois que la structure est formée, et un procédé de construction associé.
本发明提供一种装配式钢筋混凝土桥墩,包括中空的桥墩外壳和设置于桥墩外壳内的现浇核心混凝土,桥墩外壳包括混凝土层和钢筋笼,钢筋笼设于混凝土层内部;钢筋笼包括若干环向箍筋网片和若干竖向钢筋,若干环向箍筋网片在竖直方向上等距间隔设置,若干竖向钢筋沿环向箍筋网片等距间隔设置。本发明提供一种装配式钢筋混凝土桥墩的施工方法,将钢筋笼和模板制作好,然后在模板之间浇注混凝土凝结为一体以形成一体化的桥墩外壳,将桥墩外壳运输至施工现场,并且往桥墩外壳的中空孔内浇注现浇核心混凝土。本发明提供一种重量轻、施工工期短、大大减轻运输和吊装难度、提供多种施工途径和结构成型后的整体性能好的装配式钢筋混凝土桥墩及其施工方法。
FABRICATED REINFORCED CONCRETE BRIDGE PIER AND CONSTRUCTION METHOD THEREFOR
Provided in the present invention is a fabricated reinforced concrete bridge pier, comprising a hollow bridge pier shell and cast-in-situ core concrete disposed in the bridge pier shell. The bridge pier shell comprises a concrete layer and a steel cage. The steel cage is provided at an inner part of the concrete layer; and the steel cage comprises several hoop reinforcement meshes and several vertical steel bars, the several hoop reinforcement meshes are equidistantly spaced apart in the vertical direction, and the several vertical steel bars are equidistantly spaced apart along the hoop reinforcement meshes. Provided in the present invention is a construction method for a fabricated reinforced concrete bridge pier, wherein a steel cage and formwork are fabricated, then concrete is poured between the formwork to coagulate into a whole so as to form an integrated bridge pier shell, the bridge pier shell is transported to a construction site, and cast-in-situ core concrete is poured into a hollow hole of the bridge pier shell. Provided in the present invention are a fabricated reinforced concrete bridge pier, which is lightweight and has a short construction period, greatly reduces transportation and hoisting difficulties, provides a plurality of construction methods and has good overall performance once the structure is formed, and a construction method therefor.
La présente invention concerne une pile de pont en béton armé préfabriqué comprenant une coque de pile de pont creuse et un béton de cœur coulé sur place disposé dans la coque de pile de pont. La coque de pile de pont comprend une couche de béton et une cage en acier. La cage en acier est disposée au niveau d'une partie interne de la couche de béton ; et la cage en acier comprend plusieurs mailles de renforcement de frettage et plusieurs barres d'acier verticales, les plusieurs mailles de renforcement de frettage sont espacées de manière équidistante dans la direction verticale et les plusieurs barres d'acier verticales sont espacées de manière équidistante le long des mailles de renforcement de frettage. La présente invention concerne un procédé de construction pour une pile de pont en béton armé préfabriqué, dans lequel une cage en acier et un coffrage sont fabriqués, puis du béton est versé dans le coffrage pour coaguler dans un ensemble de manière à former une coque de pile de pont intégrée, la coque de pile de pont est transportée vers un site de construction, et du béton de cœur coulé sur place est versé dans un trou creux de la coque de pile de pont. La présente invention concerne une pile de pont en béton armé préfabriqué, qui est légère et présente une courte période de construction, réduit considérablement les difficultés de transport et de levage, fournit une pluralité de procédés de construction et présente de bonnes performances globales une fois que la structure est formée, et un procédé de construction associé.
本发明提供一种装配式钢筋混凝土桥墩,包括中空的桥墩外壳和设置于桥墩外壳内的现浇核心混凝土,桥墩外壳包括混凝土层和钢筋笼,钢筋笼设于混凝土层内部;钢筋笼包括若干环向箍筋网片和若干竖向钢筋,若干环向箍筋网片在竖直方向上等距间隔设置,若干竖向钢筋沿环向箍筋网片等距间隔设置。本发明提供一种装配式钢筋混凝土桥墩的施工方法,将钢筋笼和模板制作好,然后在模板之间浇注混凝土凝结为一体以形成一体化的桥墩外壳,将桥墩外壳运输至施工现场,并且往桥墩外壳的中空孔内浇注现浇核心混凝土。本发明提供一种重量轻、施工工期短、大大减轻运输和吊装难度、提供多种施工途径和结构成型后的整体性能好的装配式钢筋混凝土桥墩及其施工方法。
FABRICATED REINFORCED CONCRETE BRIDGE PIER AND CONSTRUCTION METHOD THEREFOR
PILE DE PONT EN BÉTON ARMÉ PRÉFABRIQUÉ ET PROCÉDÉ DE CONSTRUCTION ASSOCIÉ
一种装配式钢筋混凝土桥墩及其施工方法
LIU FUJUN (author) / LI JUNSHENG (author) / LI SHENGYONG (author) / LI DINGQIAN (author) / LIN SHAOMING (author) / SHANGGUAN JINYU (author)
2020-10-22
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Reinforced concrete pier construction
Engineering Index Backfile | 1910
|European Patent Office | 2021
|Fabricated concrete pier bearing platform structure and pier construction method
European Patent Office | 2024
|Reinforced Concrete Pier Construction
ASCE | 2021
|European Patent Office | 2023
|