CONSTRUCTION METHOD FOR UPRIGHT LIFTING OF LARGE-TONNAGE BOX GIRDER TO BRIDGE, AND ERECTION METHOD FOR LARGE-TONNAGE BOX GIRDER
A construction method for the upright lifting of a large-tonnage box girder to a bridge, and an erection method for a large-tonnage box girder. The construction method comprises: construct a lifting station (2) at a reserved bridge pier (1); dispose box girder lifting bases (3), lifter traveling rails (4), and mounting lifters (6) in the lifting station (2); the lifters (6) directly erect a box girder (7) in a way that the lifters (6) travel to positions above the bases (3) and erect the box girder (7). The erection method further comprises: the lifters (6) lift a single set of transport carrier apparatus or two sets of transport carrier apparatuses onto a bridge; a box girder transport vehicle (9) cooperates with a bridge erecting machine (10) to repeatedly complete the erection of the box girder (7); the lifters (6) hoist the transport carrier apparatus off the bridge; the lifters (6) lift a box girder (7) within the scope of the reserved bridge pier (1) to the erected box girder (7); construct the reserved bridge pier (1); the lifters (6) complete the erection of the box girder (7) within the scope of the reserved bridge pier (1). The construction method and erection method for the box girder occupy a small space and feature high efficiency.
L'invention porte sur un procédé de construction pour le levage vertical d'une poutre caisson à fort tonnage sur un pont, et sur un procédé de montage pour une poutre caisson à fort tonnage. Le procédé de construction comprend les étapes suivantes consistant à : construire une station de levage (2) au niveau d'une pile de pont (1) réservée ; agencer des bases (3) de levage d'une poutre caisson, des rails (4) de déplacement de levage, et des dispositifs (6) de levage en vue d'un montage dans la station de levage (2) ; dresser directement, par les dispositifs (6) de levage la poutre caisson (7) de telle sorte que les dispositifs (6) de levage se déplacent vers des positions au-dessus des bases (3) et dressent la poutre caisson (7). Le procédé de montage comprend en outre les étapes suivantes consistant à : soulever un ensemble unique d'appareils support de transport ou deux ensembles d'appareils support de transport sur un pont par les dispositifs (6) de levage ; achever de manière répétée le montage de la poutre caisson (7) par un véhicule (9) de transport de poutre caisson qui coopère avec une machine (10) de montage de pont ; hisser l'appareil support de transport hors du pont par les dispositifs (6) de levage ; soulever une poutre caisson (7) dans la portée de la pile de pont (1) réservée jusqu'à la poutre caisson (7) montée par les dispositifs (6) de levage ; construire la pile de pont (1) réservée ; achever le montage de la poutre caisson (7) dans la portée de la pile de pont (1) réservée par les dispositifs (6) de levage. Le procédé de construction et le procédé de montage de la poutre caisson occupent un espace réduit et présentent une efficacité élevée.
一种大吨位箱梁正位提梁上桥施工方法及其架设方法,施工方法为:在预留桥墩(1)处施工提升站(2),提升站(2)内设提梁台座(3)、提升机走行轨道(4)及安装提升机(6),提升机(6)直接架设箱梁(7),提升机(6)走行至台座(3)上方提升并架设箱梁(7);架设方法还包括:提升机(6)提升单套或双套运架设备上桥,运梁车(9)配合架桥机(10)重复完成箱梁(7)架设,提升机(6)吊装运架设备下桥,提升机(6)提升预留桥墩(1)范围内的箱梁(7)至已架设箱梁(7),施工预留桥墩(1),提升机(6)完成预留桥墩(1)范围内的箱梁(7)架设。该箱梁的施工方法和架设方法占地小,效率高。
CONSTRUCTION METHOD FOR UPRIGHT LIFTING OF LARGE-TONNAGE BOX GIRDER TO BRIDGE, AND ERECTION METHOD FOR LARGE-TONNAGE BOX GIRDER
A construction method for the upright lifting of a large-tonnage box girder to a bridge, and an erection method for a large-tonnage box girder. The construction method comprises: construct a lifting station (2) at a reserved bridge pier (1); dispose box girder lifting bases (3), lifter traveling rails (4), and mounting lifters (6) in the lifting station (2); the lifters (6) directly erect a box girder (7) in a way that the lifters (6) travel to positions above the bases (3) and erect the box girder (7). The erection method further comprises: the lifters (6) lift a single set of transport carrier apparatus or two sets of transport carrier apparatuses onto a bridge; a box girder transport vehicle (9) cooperates with a bridge erecting machine (10) to repeatedly complete the erection of the box girder (7); the lifters (6) hoist the transport carrier apparatus off the bridge; the lifters (6) lift a box girder (7) within the scope of the reserved bridge pier (1) to the erected box girder (7); construct the reserved bridge pier (1); the lifters (6) complete the erection of the box girder (7) within the scope of the reserved bridge pier (1). The construction method and erection method for the box girder occupy a small space and feature high efficiency.
L'invention porte sur un procédé de construction pour le levage vertical d'une poutre caisson à fort tonnage sur un pont, et sur un procédé de montage pour une poutre caisson à fort tonnage. Le procédé de construction comprend les étapes suivantes consistant à : construire une station de levage (2) au niveau d'une pile de pont (1) réservée ; agencer des bases (3) de levage d'une poutre caisson, des rails (4) de déplacement de levage, et des dispositifs (6) de levage en vue d'un montage dans la station de levage (2) ; dresser directement, par les dispositifs (6) de levage la poutre caisson (7) de telle sorte que les dispositifs (6) de levage se déplacent vers des positions au-dessus des bases (3) et dressent la poutre caisson (7). Le procédé de montage comprend en outre les étapes suivantes consistant à : soulever un ensemble unique d'appareils support de transport ou deux ensembles d'appareils support de transport sur un pont par les dispositifs (6) de levage ; achever de manière répétée le montage de la poutre caisson (7) par un véhicule (9) de transport de poutre caisson qui coopère avec une machine (10) de montage de pont ; hisser l'appareil support de transport hors du pont par les dispositifs (6) de levage ; soulever une poutre caisson (7) dans la portée de la pile de pont (1) réservée jusqu'à la poutre caisson (7) montée par les dispositifs (6) de levage ; construire la pile de pont (1) réservée ; achever le montage de la poutre caisson (7) dans la portée de la pile de pont (1) réservée par les dispositifs (6) de levage. Le procédé de construction et le procédé de montage de la poutre caisson occupent un espace réduit et présentent une efficacité élevée.
一种大吨位箱梁正位提梁上桥施工方法及其架设方法,施工方法为:在预留桥墩(1)处施工提升站(2),提升站(2)内设提梁台座(3)、提升机走行轨道(4)及安装提升机(6),提升机(6)直接架设箱梁(7),提升机(6)走行至台座(3)上方提升并架设箱梁(7);架设方法还包括:提升机(6)提升单套或双套运架设备上桥,运梁车(9)配合架桥机(10)重复完成箱梁(7)架设,提升机(6)吊装运架设备下桥,提升机(6)提升预留桥墩(1)范围内的箱梁(7)至已架设箱梁(7),施工预留桥墩(1),提升机(6)完成预留桥墩(1)范围内的箱梁(7)架设。该箱梁的施工方法和架设方法占地小,效率高。
CONSTRUCTION METHOD FOR UPRIGHT LIFTING OF LARGE-TONNAGE BOX GIRDER TO BRIDGE, AND ERECTION METHOD FOR LARGE-TONNAGE BOX GIRDER
PROCÉDÉ DE CONSTRUCTION POUR LE LEVAGE VERTICAL D'UNE POUTRE CAISSON À FORT TONNAGE SUR UN PONT, ET PROCÉDÉ DE MONTAGE POUR POUTRE CAISSON À FORT TONNAGE
一种大吨位箱梁正位提梁上桥施工方法及其架设方法
YE YUSEN (author) / CHEN JIANNAN (author) / PAN CHUANWEI (author) / LIN GUOHUI (author) / CHEN MENGQIANG (author) / LI SHILONG (author) / LI CHAO (author) / WANG QIANG (author) / CHEN JIANJUN (author) / LI DA (author)
2020-11-26
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2022
|European Patent Office | 2022
|Assembly type large-tonnage girder erection hoister and girder erection method
European Patent Office | 2020
|Novel large-tonnage bridge girder erection machine and construction method thereof
European Patent Office | 2015
|Large-tonnage segment assembly bridge girder erection machine end hanger
European Patent Office | 2023
|