CONSTRUCTION METHOD FOR INTEGRAL LIFTING OF L-SHAPED BIDIRECTIONAL CANTILEVER STRUCTURE
A construction method for integral lifting of an L-shaped bidirectional cantilever structure, comprising first, pre-assembling the L-shaped bidirectional cantilever structure (1) on the ground, and according to a lifting point and the center of gravity of the L-shaped bidirectional cantilever structure (1), adjusting the center of gravity of the L-shaped bidirectional cantilever structure (1) by using an assembled auxiliary structure (2) and a temporary counterweight (3), so that the L-shaped bidirectional cantilever structure (1) has good anti-overturning performance and stability during lifting. This construction method converts a large number of high rise operations which have many dangerous sources and bad construction environment conditions into ground operations, optimizing the construction environment conditions, having short construction period, high construction quality, and safe and reliable construction process, and reducing construction costs.
La présente invention concerne un procédé de construction permettant le levage intégral d'une structure en porte-à-faux bidirectionnelle en forme de L comprenant tout d'abord le pré-assemblage de la structure en porte-à-faux bidirectionnelle en forme de L (1) sur le sol, et selon un point de levage et le centre de gravité de la structure en porte-à-faux bidirectionnelle en forme de L (1), le réglage du centre de gravité de la structure en porte-à-faux bidirectionnelle en forme de L (1) au moyen d'une structure auxiliaire assemblée (2) et d'un contrepoids temporaire (3), de sorte que la structure en porte-à-faux bidirectionnelle en forme de L (1) présente une bonne performance anti-renversement et une bonne stabilité pendant le levage. Ce procédé de construction convertit un grand nombre de manœuvres en hauteur élevée qui présentent de nombreuses sources de danger et de mauvaises conditions d'environnement de construction en manœuvres au sol, optimisant les conditions d'environnement de construction, présentant une courte période de construction, une qualité de construction élevée et un procédé de construction sûr et fiable et réduisant les coûts de construction.
一种L型双向悬挑结构整体提升施工方法,先对L型双向悬挑结构(1)在地面进行预先拼装,并根据上吊点和L型双向悬挑结构(1)的重心,使用装配式辅助结构(2)和临时配重(3)对L型双向悬挑结构(1)的重心进行调整,以使得L型双向悬挑结构(1)在提升过程中具有良好的抗倾覆性能和稳定性,这种施工方法将危险源多、施工环境条件恶劣的大量高空作业转化为地面作业,不但优化了施工环境条件,而且工期短,施工质量高,施工过程安全可靠,节约了施工成本。
CONSTRUCTION METHOD FOR INTEGRAL LIFTING OF L-SHAPED BIDIRECTIONAL CANTILEVER STRUCTURE
A construction method for integral lifting of an L-shaped bidirectional cantilever structure, comprising first, pre-assembling the L-shaped bidirectional cantilever structure (1) on the ground, and according to a lifting point and the center of gravity of the L-shaped bidirectional cantilever structure (1), adjusting the center of gravity of the L-shaped bidirectional cantilever structure (1) by using an assembled auxiliary structure (2) and a temporary counterweight (3), so that the L-shaped bidirectional cantilever structure (1) has good anti-overturning performance and stability during lifting. This construction method converts a large number of high rise operations which have many dangerous sources and bad construction environment conditions into ground operations, optimizing the construction environment conditions, having short construction period, high construction quality, and safe and reliable construction process, and reducing construction costs.
La présente invention concerne un procédé de construction permettant le levage intégral d'une structure en porte-à-faux bidirectionnelle en forme de L comprenant tout d'abord le pré-assemblage de la structure en porte-à-faux bidirectionnelle en forme de L (1) sur le sol, et selon un point de levage et le centre de gravité de la structure en porte-à-faux bidirectionnelle en forme de L (1), le réglage du centre de gravité de la structure en porte-à-faux bidirectionnelle en forme de L (1) au moyen d'une structure auxiliaire assemblée (2) et d'un contrepoids temporaire (3), de sorte que la structure en porte-à-faux bidirectionnelle en forme de L (1) présente une bonne performance anti-renversement et une bonne stabilité pendant le levage. Ce procédé de construction convertit un grand nombre de manœuvres en hauteur élevée qui présentent de nombreuses sources de danger et de mauvaises conditions d'environnement de construction en manœuvres au sol, optimisant les conditions d'environnement de construction, présentant une courte période de construction, une qualité de construction élevée et un procédé de construction sûr et fiable et réduisant les coûts de construction.
一种L型双向悬挑结构整体提升施工方法,先对L型双向悬挑结构(1)在地面进行预先拼装,并根据上吊点和L型双向悬挑结构(1)的重心,使用装配式辅助结构(2)和临时配重(3)对L型双向悬挑结构(1)的重心进行调整,以使得L型双向悬挑结构(1)在提升过程中具有良好的抗倾覆性能和稳定性,这种施工方法将危险源多、施工环境条件恶劣的大量高空作业转化为地面作业,不但优化了施工环境条件,而且工期短,施工质量高,施工过程安全可靠,节约了施工成本。
CONSTRUCTION METHOD FOR INTEGRAL LIFTING OF L-SHAPED BIDIRECTIONAL CANTILEVER STRUCTURE
PROCÉDÉ DE CONSTRUCTION PERMETTANT LE LEVAGE INTÉGRAL D'UNE STRUCTURE EN PORTE-À-FAUX BIDIRECTIONNELLE EN FORME DE L
一种L型双向悬挑结构整体提升施工方法
WANG LONG (author) / LIANG HUQING (author) / CHEN ZHENYING (author) / CHEN ZHENMING (author) / LU DEHUI (author)
2021-01-07
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Unilateral integral lifting construction method for peripheral cantilever structure
European Patent Office | 2023
|Plate lifting construction method of large cantilever steel structure
European Patent Office | 2024
|European Patent Office | 2021
|Integral lifting construction method for steel structure lifting roof
European Patent Office | 2023
|Cantilever bidirectional orthogonal truss and construction method thereof
European Patent Office | 2024
|