SIDEWALK CONSTRUCTION SCAFFOLD FOR RAILWAY BRIDGE
Disclosed in the present invention is a sidewalk construction scaffold for a railway bridge, comprising a bottom formwork scaffold (7) having a rectangular frame structure, four corners of the bottom formwork scaffold (7) being hoisted under two cross beams (1) by means of booms (6), the lower side of one end of each cross beam (1) being connected to a folded beam (3), the lower side of the other end being connected to an inclined beam (5), and the two cross beams (1) being connected by using connecting rods (21) to form a rectangular upper frame. In the present invention, the present scaffold can be hung on one side of a bridge to serve as a construction platform for a sidewalk; compared with the construction of a scaffold starting under the bridge, the construction period can be greatly shortened, the whole scaffold is divided into a hanging scaffold for fixing and a bottom formwork scaffold for arranging formwork, and the bottom formwork scaffold can be moved up and down, facilitating the installation and removal of the formwork.
La présente invention concerne un échafaudage de construction de trottoir pour un pont de chemin de fer, comprenant un échafaudage (7) de coffrage inférieur ayant une structure de cadre rectangulaire, quatre coins de l'échafaudage (7) de coffrage inférieur étant hissés sous deux entretoises (1) au moyen de flèches (6), le côté inférieur d'une extrémité de chaque entretoise (1) étant relié à une poutre repliée (3), le côté inférieur de l'autre extrémité étant relié à une poutre inclinée (5), et les deux entretoises (1) étant reliées par l'utilisation de tiges de liaison (21) pour former un cadre supérieur rectangulaire. Dans la présente invention, le présent échafaudage peut être suspendu sur un côté d'un pont afin de servir de plate-forme de construction pour un trottoir ; par comparaison à la construction d'un échafaudage commençant sous le pont, la période de construction peut être raccourcie de manière considérable, l'échafaudage dans son ensemble est divisé en un échafaudage suspendu pour la fixation et un échafaudage de coffrage inférieur pour agencer le coffrage, et l'échafaudage de coffrage inférieur peut être déplacé vers le haut et vers le bas, ce qui facilite l'installation et le retrait du coffrage.
本发明公开了一种铁道桥梁人行道施工支架,包括矩形框架结构的底模支架(7),底模支架(7)四角通过吊杆(6)吊装在2根横梁(1)下方,横梁(1)一端下侧连接折梁(3),另一端下侧连接斜梁(5),2根横梁(1)之间用连杆(21)连接构成矩形的上框架。本发明本支架能够悬挂在桥梁侧面作为人行道的施工平台,相较于从桥下开始搭建支架可以大大缩短工期,整个支架分成固定用的悬挂支架和搭设模板用的底模支架,底模支架可以上下移动,便于模板安装与拆卸。
SIDEWALK CONSTRUCTION SCAFFOLD FOR RAILWAY BRIDGE
Disclosed in the present invention is a sidewalk construction scaffold for a railway bridge, comprising a bottom formwork scaffold (7) having a rectangular frame structure, four corners of the bottom formwork scaffold (7) being hoisted under two cross beams (1) by means of booms (6), the lower side of one end of each cross beam (1) being connected to a folded beam (3), the lower side of the other end being connected to an inclined beam (5), and the two cross beams (1) being connected by using connecting rods (21) to form a rectangular upper frame. In the present invention, the present scaffold can be hung on one side of a bridge to serve as a construction platform for a sidewalk; compared with the construction of a scaffold starting under the bridge, the construction period can be greatly shortened, the whole scaffold is divided into a hanging scaffold for fixing and a bottom formwork scaffold for arranging formwork, and the bottom formwork scaffold can be moved up and down, facilitating the installation and removal of the formwork.
La présente invention concerne un échafaudage de construction de trottoir pour un pont de chemin de fer, comprenant un échafaudage (7) de coffrage inférieur ayant une structure de cadre rectangulaire, quatre coins de l'échafaudage (7) de coffrage inférieur étant hissés sous deux entretoises (1) au moyen de flèches (6), le côté inférieur d'une extrémité de chaque entretoise (1) étant relié à une poutre repliée (3), le côté inférieur de l'autre extrémité étant relié à une poutre inclinée (5), et les deux entretoises (1) étant reliées par l'utilisation de tiges de liaison (21) pour former un cadre supérieur rectangulaire. Dans la présente invention, le présent échafaudage peut être suspendu sur un côté d'un pont afin de servir de plate-forme de construction pour un trottoir ; par comparaison à la construction d'un échafaudage commençant sous le pont, la période de construction peut être raccourcie de manière considérable, l'échafaudage dans son ensemble est divisé en un échafaudage suspendu pour la fixation et un échafaudage de coffrage inférieur pour agencer le coffrage, et l'échafaudage de coffrage inférieur peut être déplacé vers le haut et vers le bas, ce qui facilite l'installation et le retrait du coffrage.
本发明公开了一种铁道桥梁人行道施工支架,包括矩形框架结构的底模支架(7),底模支架(7)四角通过吊杆(6)吊装在2根横梁(1)下方,横梁(1)一端下侧连接折梁(3),另一端下侧连接斜梁(5),2根横梁(1)之间用连杆(21)连接构成矩形的上框架。本发明本支架能够悬挂在桥梁侧面作为人行道的施工平台,相较于从桥下开始搭建支架可以大大缩短工期,整个支架分成固定用的悬挂支架和搭设模板用的底模支架,底模支架可以上下移动,便于模板安装与拆卸。
SIDEWALK CONSTRUCTION SCAFFOLD FOR RAILWAY BRIDGE
ÉCHAFAUDAGE DE CONSTRUCTION DE TROTTOIR POUR PONT DE CHEMIN DE FER
铁道桥梁人行道施工支架
KUANG TIANHUANG (author) / CAO LIANGHUA (author) / ZHONG XIANG (author) / LIANG SHANJUN (author)
2021-06-03
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Hanging basket device for installing railway bridge sidewalk steel support