A platform for research: civil engineering, architecture and urbanism
RECYCLABLE REBAR CAGE CENTRALIZING SYSTEM AND CONSTRUCTION METHOD THEREFOR
A recyclable rebar cage centralizing system and a construction method therefor, the centralizing system comprising a buoy, a buoy positioning device, and a rebar cage positioning device. A positioning circle is provided in the center of the top surface of the buoy; the buoy positioning device is disposed below the buoy and comprises a positioning ring, a positioning rope, and a buoy control rope; the positioning ring is arranged in the rebar cage, and the center of the positioning ring coincides with the central axis of the rebar cage; the positioning ring is connected to the rebar cage by the positioning rope; the buoy control rope has one end connected to the center of the bottom of the buoy and the other end passing through the positioning ring and connected to a hanging bar on the upper part of the rebar cage; the rebar cage positioning device is arranged above the buoy and comprises a cross bracing and a plumb bob; the center of the cross bracing coincides with the center of a pile hole, and the four ends of the cross bracing are connected to the upper edge of a protective tube in the pile hole; and the plumb bob is suspended below the center of the cross bracing by means of a plumb line. The present invention aims to solve the technical problems of complicated construction operations, low precision, inability to change with construction conditions, and non-recyclability in traditional centralizing systems.
L'invention concerne un système de centrage de cage de barre d'armature recyclable et son procédé de construction, le système de centrage comprenant une bouée, un dispositif de positionnement de bouée et un dispositif de positionnement de cage de barre d'armature. Un cercle de positionnement est disposé au centre de la surface supérieure de la bouée. Le dispositif de positionnement de bouée est disposé au-dessous de la bouée et comprend un anneau de positionnement, un câble de positionnement et un câble de commande de bouée. L'anneau de positionnement est disposé dans la cage de barre d'armature, et le centre de la bague de positionnement coïncide avec l'axe central de la cage de barre d'armature. L'anneau de positionnement est relié à la cage de barre d'armature par le câble de positionnement. Une extrémité de la corde de commande de bouée est reliée au centre du fond de la bouée et l'autre extrémité passe à travers l'anneau de positionnement et est reliée à une barre de suspension sur la partie supérieure de la cage de barre d'armature. Le dispositif de positionnement de cage de barre d'armature est disposé au-dessus de la bouée et comprend un contreventement transversal et un plomb. Le centre du contreventement transversal coïncide avec le centre d'un trou de pieu, et les quatre extrémités du contreventement transversal sont reliées au bord supérieur d'un tube de protection dans le trou de pieu. Le plomb est suspendu au-dessous du centre du contreventement transversal au moyen d'un fil à plomb. La présente invention vise à résoudre les problèmes techniques des opérations de construction compliquées, de faible précision, d'incapacité à s'adapter à des conditions de construction changeantes et de non-recyclabilité dans des systèmes de centrage classiques.
一种可回收使用的钢筋笼的对中系统及其施工方法,包括浮标、浮标定位装置和钢筋笼定位装置;浮标顶面中部设有定位圈;浮标定位装置设置在浮标下方,包括定位环、定位绳和浮标控制绳;定位环设置在钢筋笼中,定位环中心与钢筋笼中轴重合;定位绳将定位环与钢筋笼拉结;浮标控制绳一端连接在浮标底部中心处,浮标控制绳的另一端穿过定位环、与钢筋笼上方的吊筋连接;钢筋笼定位装置设在浮标的上方,包括十字撑和铅锤;十字撑的中心与桩孔的中心重合,且十字撑的四个端部与桩孔中护筒的上边缘连接;铅锤通过铅垂线吊设在十字撑的中心下方。本发明要解决传统的对中系统存在的施工操作复杂、精细程度低、不能随施工条件变化和不可回收的技术问题。
RECYCLABLE REBAR CAGE CENTRALIZING SYSTEM AND CONSTRUCTION METHOD THEREFOR
A recyclable rebar cage centralizing system and a construction method therefor, the centralizing system comprising a buoy, a buoy positioning device, and a rebar cage positioning device. A positioning circle is provided in the center of the top surface of the buoy; the buoy positioning device is disposed below the buoy and comprises a positioning ring, a positioning rope, and a buoy control rope; the positioning ring is arranged in the rebar cage, and the center of the positioning ring coincides with the central axis of the rebar cage; the positioning ring is connected to the rebar cage by the positioning rope; the buoy control rope has one end connected to the center of the bottom of the buoy and the other end passing through the positioning ring and connected to a hanging bar on the upper part of the rebar cage; the rebar cage positioning device is arranged above the buoy and comprises a cross bracing and a plumb bob; the center of the cross bracing coincides with the center of a pile hole, and the four ends of the cross bracing are connected to the upper edge of a protective tube in the pile hole; and the plumb bob is suspended below the center of the cross bracing by means of a plumb line. The present invention aims to solve the technical problems of complicated construction operations, low precision, inability to change with construction conditions, and non-recyclability in traditional centralizing systems.
L'invention concerne un système de centrage de cage de barre d'armature recyclable et son procédé de construction, le système de centrage comprenant une bouée, un dispositif de positionnement de bouée et un dispositif de positionnement de cage de barre d'armature. Un cercle de positionnement est disposé au centre de la surface supérieure de la bouée. Le dispositif de positionnement de bouée est disposé au-dessous de la bouée et comprend un anneau de positionnement, un câble de positionnement et un câble de commande de bouée. L'anneau de positionnement est disposé dans la cage de barre d'armature, et le centre de la bague de positionnement coïncide avec l'axe central de la cage de barre d'armature. L'anneau de positionnement est relié à la cage de barre d'armature par le câble de positionnement. Une extrémité de la corde de commande de bouée est reliée au centre du fond de la bouée et l'autre extrémité passe à travers l'anneau de positionnement et est reliée à une barre de suspension sur la partie supérieure de la cage de barre d'armature. Le dispositif de positionnement de cage de barre d'armature est disposé au-dessus de la bouée et comprend un contreventement transversal et un plomb. Le centre du contreventement transversal coïncide avec le centre d'un trou de pieu, et les quatre extrémités du contreventement transversal sont reliées au bord supérieur d'un tube de protection dans le trou de pieu. Le plomb est suspendu au-dessous du centre du contreventement transversal au moyen d'un fil à plomb. La présente invention vise à résoudre les problèmes techniques des opérations de construction compliquées, de faible précision, d'incapacité à s'adapter à des conditions de construction changeantes et de non-recyclabilité dans des systèmes de centrage classiques.
一种可回收使用的钢筋笼的对中系统及其施工方法,包括浮标、浮标定位装置和钢筋笼定位装置;浮标顶面中部设有定位圈;浮标定位装置设置在浮标下方,包括定位环、定位绳和浮标控制绳;定位环设置在钢筋笼中,定位环中心与钢筋笼中轴重合;定位绳将定位环与钢筋笼拉结;浮标控制绳一端连接在浮标底部中心处,浮标控制绳的另一端穿过定位环、与钢筋笼上方的吊筋连接;钢筋笼定位装置设在浮标的上方,包括十字撑和铅锤;十字撑的中心与桩孔的中心重合,且十字撑的四个端部与桩孔中护筒的上边缘连接;铅锤通过铅垂线吊设在十字撑的中心下方。本发明要解决传统的对中系统存在的施工操作复杂、精细程度低、不能随施工条件变化和不可回收的技术问题。
RECYCLABLE REBAR CAGE CENTRALIZING SYSTEM AND CONSTRUCTION METHOD THEREFOR
SYSTÈME DE CENTRAGE DE CAGE DE BARRE D'ARMATURE RECYCLABLE ET SON PROCÉDÉ DE CONSTRUCTION
一种可回收使用的钢筋笼的对中系统及其施工方法
SI ZETONG (author) / XU MENGNAN (author) / XIAO JIANDONG (author) / LI YANFENG (author) / CHENG JIN (author)
2021-07-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
ANTI-LIFTING ASSEMBLY OF REBAR CAGE, REBAR CAGE AND CONSTRUCTION METHOD OF CAST-IN-PLACE PILE
European Patent Office | 2016
|Rebar cage construction and safety : best practices
TIBKAT | 2013
|