A platform for research: civil engineering, architecture and urbanism
CREST GATE AND METHOD FOR INSTALLING SAME
This method for installing a crest gate 1 comprises: a barrier installation step for installing a barrier 10; a panel arrangement step for lowering the barrier 10 to bring an undersurface 14 of the barrier 10 into contact with a plurality of panels 22, which form a contact ground surface 23 contacted by the undersurface 14 of the barrier10 when lowered, so as to arrange the panels 22 in a spaced planar arrangement that enables the panels 22 to be displaced along the undersurface 14 of the barrier 10; a panel displacement step for, following the panel arrangement step, lowering the barrier 10 so as to bring the undersurface 14 of the barrier 10 into contact with the panels 22 and displace the panels 22 along the undersurface 14 of the barrier 10; and a panel anchoring step for, after the panel displacement step, anchoring the panels 22.
L'invention concerne un procédé d'installation d'une vanne de déversoir (1) qui comprend : une étape d'installation de barrière pour installer une barrière (10) ; une étape d'agencement de panneaux pour abaisser la barrière (10) pour amener une surface inférieure (14) de la barrière (10) en contact avec une pluralité de panneaux (22), qui forment une surface de sol de contact (23) en contact avec la surface inférieure (14) de la barrière (10) lorsqu'elle est abaissée, de façon à agencer les panneaux (22) dans un agencement plan espacé qui permet aux panneaux (22) d'être déplacés le long de la surface inférieure (14) de la barrière (10) ; une étape de déplacement de panneaux pour, suite à l'étape d'agencement de panneaux, abaisser la barrière (10) de façon à amener la surface inférieure (14) de la barrière (10) en contact avec les panneaux (22) et déplacer les panneaux (22) le long de la surface inférieure (14) de la barrière (10) ; et une étape d'ancrage de panneaux pour, après l'étape de déplacement de panneaux, ancrer les panneaux (22).
起伏ゲート1の設置方法は、扉体10を設置する扉体設置工程と、倒伏時に扉体10の下面14が接地する被接地面23を形成する複数のパネル22を、扉体10を倒伏させて扉体10の下面14と接触させることによってパネル22が扉体10の下面14に沿って変位可能に、互いに間隔を置いて平面状に配置するパネル配置工程と、パネル配置工程の後、扉体10を倒伏させて扉体10の下面14をパネル22に接触させ、パネル22を扉体10の下面14に沿って変位させるパネル変位工程と、パネル変位工程の後、パネル22を固定するパネル固定工程とを備えている。
CREST GATE AND METHOD FOR INSTALLING SAME
This method for installing a crest gate 1 comprises: a barrier installation step for installing a barrier 10; a panel arrangement step for lowering the barrier 10 to bring an undersurface 14 of the barrier 10 into contact with a plurality of panels 22, which form a contact ground surface 23 contacted by the undersurface 14 of the barrier10 when lowered, so as to arrange the panels 22 in a spaced planar arrangement that enables the panels 22 to be displaced along the undersurface 14 of the barrier 10; a panel displacement step for, following the panel arrangement step, lowering the barrier 10 so as to bring the undersurface 14 of the barrier 10 into contact with the panels 22 and displace the panels 22 along the undersurface 14 of the barrier 10; and a panel anchoring step for, after the panel displacement step, anchoring the panels 22.
L'invention concerne un procédé d'installation d'une vanne de déversoir (1) qui comprend : une étape d'installation de barrière pour installer une barrière (10) ; une étape d'agencement de panneaux pour abaisser la barrière (10) pour amener une surface inférieure (14) de la barrière (10) en contact avec une pluralité de panneaux (22), qui forment une surface de sol de contact (23) en contact avec la surface inférieure (14) de la barrière (10) lorsqu'elle est abaissée, de façon à agencer les panneaux (22) dans un agencement plan espacé qui permet aux panneaux (22) d'être déplacés le long de la surface inférieure (14) de la barrière (10) ; une étape de déplacement de panneaux pour, suite à l'étape d'agencement de panneaux, abaisser la barrière (10) de façon à amener la surface inférieure (14) de la barrière (10) en contact avec les panneaux (22) et déplacer les panneaux (22) le long de la surface inférieure (14) de la barrière (10) ; et une étape d'ancrage de panneaux pour, après l'étape de déplacement de panneaux, ancrer les panneaux (22).
起伏ゲート1の設置方法は、扉体10を設置する扉体設置工程と、倒伏時に扉体10の下面14が接地する被接地面23を形成する複数のパネル22を、扉体10を倒伏させて扉体10の下面14と接触させることによってパネル22が扉体10の下面14に沿って変位可能に、互いに間隔を置いて平面状に配置するパネル配置工程と、パネル配置工程の後、扉体10を倒伏させて扉体10の下面14をパネル22に接触させ、パネル22を扉体10の下面14に沿って変位させるパネル変位工程と、パネル変位工程の後、パネル22を固定するパネル固定工程とを備えている。
CREST GATE AND METHOD FOR INSTALLING SAME
VANNE DE DÉVERSOIR ET PROCÉDÉ D'INSTALLATION DE CELLE-CI
起伏ゲートおよびその設置方法
NAKAYASU KYOICHI (author) / MORII TOSHIAKI (author) / UTSUNOMIYA SOTA (author) / MIYAMOTO KUNIE (author)
2021-08-05
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Installing Hydraulic Crest Gates Improves Flood Control
British Library Online Contents | 2012
|Installing Hydraulic Crest Gates Improves Flood Control
Online Contents | 2012
|