OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
Provided is a technology capable of appropriately controlling warm-up completion timing for a work machine, taking into consideration the scheduled usage for the work machine. A warm-up period is predicted on the basis of a measurement value for an external state variable in a state in which operation of the work machine 40 is stopped, said warm-up period being from when the warm-up operation of a work machine 40 has started until measurement value for an internal state variable fulfills a specified condition, i.e., until warm-up has been completed. Then the warm-up operation of the work machine 40 can start at a first specified time t1, being an appropriate timing, on the basis of the predicted warm-up period, such that a measurement value for the internal state variable for the work machine 40 can fulfill a specified condition by a second specified time t2.
L'invention concerne une technologie permettant de commander de manière appropriée l'instant de fin de réchauffement pour un engin de chantier, en prenant en considération l'utilisation programmée de l'engin de chantier. Une durée de réchauffement est prédite sur la base d'une valeur de mesure pour une variable d'état externe dans un état dans lequel le fonctionnement de l'engin de chantier 40 est arrêté, ladite durée de réchauffement étant à partir du moment où l'opération de réchauffement de l'engin de chantier 40 a commencé jusqu'à ce que la valeur de mesure pour une variable d'état interne remplit une condition spécifiée, c'est-à-dire jusqu'à l'achèvement du réchauffement. Ensuite, l'opération de réchauffement de l'engin de chantier 40 peut commencer à un premier temps prédéterminé t1, qui est un instant approprié, sur la base de la période de réchauffement prédite, de telle sorte qu'une valeur de mesure pour la variable d'état interne de l'engin de chantier 40 peut satisfaire une condition spécifiée par un second temps spécifié t2.
作業機械の利用予定に鑑みて、当該作業機械の暖機完了タイミングを適当に制御することができる技術を提供する。作業機械40の運転が停止されている状態における外部状態変数の計測値に基づき、当該作業機械40の暖機運転が開始されてから内部状態変数の計測値が指定条件を満たす、すなわち、暖機が完了するまでの暖機期間が予測される。そして、第2指定時刻t2までに作業機械40の内部状態変数の計測値が指定条件を満たすように、当該予測された暖機期間に基づき、適当なタイミングである第1指定時刻t1に作業機械40の暖機運転が開始されうる。
OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
Provided is a technology capable of appropriately controlling warm-up completion timing for a work machine, taking into consideration the scheduled usage for the work machine. A warm-up period is predicted on the basis of a measurement value for an external state variable in a state in which operation of the work machine 40 is stopped, said warm-up period being from when the warm-up operation of a work machine 40 has started until measurement value for an internal state variable fulfills a specified condition, i.e., until warm-up has been completed. Then the warm-up operation of the work machine 40 can start at a first specified time t1, being an appropriate timing, on the basis of the predicted warm-up period, such that a measurement value for the internal state variable for the work machine 40 can fulfill a specified condition by a second specified time t2.
L'invention concerne une technologie permettant de commander de manière appropriée l'instant de fin de réchauffement pour un engin de chantier, en prenant en considération l'utilisation programmée de l'engin de chantier. Une durée de réchauffement est prédite sur la base d'une valeur de mesure pour une variable d'état externe dans un état dans lequel le fonctionnement de l'engin de chantier 40 est arrêté, ladite durée de réchauffement étant à partir du moment où l'opération de réchauffement de l'engin de chantier 40 a commencé jusqu'à ce que la valeur de mesure pour une variable d'état interne remplit une condition spécifiée, c'est-à-dire jusqu'à l'achèvement du réchauffement. Ensuite, l'opération de réchauffement de l'engin de chantier 40 peut commencer à un premier temps prédéterminé t1, qui est un instant approprié, sur la base de la période de réchauffement prédite, de telle sorte qu'une valeur de mesure pour la variable d'état interne de l'engin de chantier 40 peut satisfaire une condition spécifiée par un second temps spécifié t2.
作業機械の利用予定に鑑みて、当該作業機械の暖機完了タイミングを適当に制御することができる技術を提供する。作業機械40の運転が停止されている状態における外部状態変数の計測値に基づき、当該作業機械40の暖機運転が開始されてから内部状態変数の計測値が指定条件を満たす、すなわち、暖機が完了するまでの暖機期間が予測される。そして、第2指定時刻t2までに作業機械40の内部状態変数の計測値が指定条件を満たすように、当該予測された暖機期間に基づき、適当なタイミングである第1指定時刻t1に作業機械40の暖機運転が開始されうる。
OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
SERVEUR, SYSTÈME ET PROCÉDÉ D'ASSISTANCE À L'EXPLOITATION
操作支援サーバ、操作支援システムおよび操作支援方法
OTANI MASAKI (author) / SAIKI SEIJI (author) / YAMAZAKI YOICHIRO (author)
2021-08-26
Patent
Electronic Resource
Japanese
OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
European Patent Office | 2021
|OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
European Patent Office | 2023
|OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
European Patent Office | 2023
|Operation support server, operation support system, and operation support method
European Patent Office | 2025
|Operation support server, operation support system, and operation support method
European Patent Office | 2022
|