BOOM AND WORKING EQUIPMENT
A boom (100) and working equipment. The working equipment comprises a chassis and a boom system arranged on the chassis, the boom system comprises a plurality of booms (100), and two adjacent booms (100) are hinged to each other. The boom (100) has a frame structure; the boom (100) comprises a bottom plate (110), a bottom plate (120), a first side plate (130), and a second side plate (140); bending portions are formed on both sides of each of the top plate (110) and the bottom plate (120); at least part of each bending portion is separately attached to and assembled with an end portion of the corresponding first side plate (130) or second side plate (140), so as to define the frame structure. The boom (100) is formed by assembly, and thus is suitable for mass production and has a low replacement cost.
L'invention concerne une flèche (100) et un équipement de travail. L'équipement de travail comprend un châssis et un système de flèche disposé sur le châssis. Ledit système de flèche comprend une pluralité de flèches (100), et deux flèches adjacentes (100) sont articulées l'une à l'autre. La flèche (100) présente une structure de cadre et comprend une plaque inférieure (110), une plaque inférieure (120), une première plaque latérale (130), et une seconde plaque latérale (140) ; des parties de courbure sont formées sur les deux côtés de chacune de la plaque supérieure (110) et la plaque inférieure (120) ; au moins une partie de chaque partie de courbure est fixée séparément et assemblée avec une partie d'extrémité de la première plaque latérale correspondante (130) ou de la seconde plaque latérale (140), de façon à définir la structure de cadre. La flèche (100) est formée par assemblage, et est ainsi appropriée pour une production en masse et a un faible coût de remplacement.
一种臂架(100)和作业设备,该作业设备包括底盘、设于底盘上的臂架系统,臂架系统包括多个臂架(100),相邻的两个臂架(100)之间相互铰接。该臂架(100)具有框架结构,臂架(100)包括顶板(110)、底板(120)、第一侧板(130)、第二侧板(140),顶板(110)、底板(120)的两侧均设有弯折部,各弯折部的至少一部分分别与相应的第一侧板(130)、第二侧板(140)的端部相互贴合拼接,限定出框架结构。通过拼接出臂架(100),更适合批量生产,变更成本低。
BOOM AND WORKING EQUIPMENT
A boom (100) and working equipment. The working equipment comprises a chassis and a boom system arranged on the chassis, the boom system comprises a plurality of booms (100), and two adjacent booms (100) are hinged to each other. The boom (100) has a frame structure; the boom (100) comprises a bottom plate (110), a bottom plate (120), a first side plate (130), and a second side plate (140); bending portions are formed on both sides of each of the top plate (110) and the bottom plate (120); at least part of each bending portion is separately attached to and assembled with an end portion of the corresponding first side plate (130) or second side plate (140), so as to define the frame structure. The boom (100) is formed by assembly, and thus is suitable for mass production and has a low replacement cost.
L'invention concerne une flèche (100) et un équipement de travail. L'équipement de travail comprend un châssis et un système de flèche disposé sur le châssis. Ledit système de flèche comprend une pluralité de flèches (100), et deux flèches adjacentes (100) sont articulées l'une à l'autre. La flèche (100) présente une structure de cadre et comprend une plaque inférieure (110), une plaque inférieure (120), une première plaque latérale (130), et une seconde plaque latérale (140) ; des parties de courbure sont formées sur les deux côtés de chacune de la plaque supérieure (110) et la plaque inférieure (120) ; au moins une partie de chaque partie de courbure est fixée séparément et assemblée avec une partie d'extrémité de la première plaque latérale correspondante (130) ou de la seconde plaque latérale (140), de façon à définir la structure de cadre. La flèche (100) est formée par assemblage, et est ainsi appropriée pour une production en masse et a un faible coût de remplacement.
一种臂架(100)和作业设备,该作业设备包括底盘、设于底盘上的臂架系统,臂架系统包括多个臂架(100),相邻的两个臂架(100)之间相互铰接。该臂架(100)具有框架结构,臂架(100)包括顶板(110)、底板(120)、第一侧板(130)、第二侧板(140),顶板(110)、底板(120)的两侧均设有弯折部,各弯折部的至少一部分分别与相应的第一侧板(130)、第二侧板(140)的端部相互贴合拼接,限定出框架结构。通过拼接出臂架(100),更适合批量生产,变更成本低。
BOOM AND WORKING EQUIPMENT
FLÈCHE ET ÉQUIPEMENT DE TRAVAIL
臂架和作业设备
XIE SHIHUI (author) / GUO XI (author) / LI JIANGBO (author)
2021-09-16
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste