CONSTRUCTION METHOD FOR EXPANDED-HEAD PRESTRESSED CONCRETE ANCHOR ROD
Provided is a construction method for an expanded-head prestressed concrete anchor rod. The anchor rod is formed by pouring and solidifying an anchor rod framework system and prestressed concrete, and the method therefor comprises the specific construction implementation steps of: performing drilling and positioning; drilling to a designed depth, performing jet grouting or mechanical reaming construction and forming a hole, and lowering a pull rod, i.e. a main rib, of the anchor rod and an expanded-head framework or a fixed-diameter anchor head framework; after the pull rod, i.e. the main rib, of the anchor rod, an expanded head and the expanded-head framework are in place, expanding the expanded head to a designed size by means of an expansion mechanism, and then pouring concrete on the expanded head, i.e. an expanded body section and a non-expanded body section being formed to reach a rated strength required by design and specification; by means of the pull rod, i.e. the main rib, in the anchor rod, applying prestress to the main rib by using a device and a method that can apply prestress; and after completion of applying prestress required by design and specification, performing locking, and then removing an apparatus device, which has had prestress applied thereto, that needs to be removed, wherein the whole of the anchor rod is composed of the poured concrete and the anchor rod framework system.
L'invention concerne un procédé de construction pour une tige d'ancrage en béton précontraint à tête élargie. La tige d'ancrage est formée en versant et en solidifiant un système d'ossature de tige d'ancrage et du béton précontraint, et le procédé pour celle-ci comprend les étapes de mise en œuvre de construction spécifiques consistant à : effectuer un perçage et un positionnement ; percer à une profondeur désignée, réaliser une construction d'injection de coulis à jet ou d'alésage mécanique et former un trou, et abaisser une tige de traction, c'est-à-dire une nervure principale, de la tige d'ancrage et une ossature à tête élargie ou une ossature de tête d'ancrage à diamètre fixe ; une fois que la tige de traction, c'est-à-dire la nervure principale, de la tige d'ancrage, une tête élargie et l'ossature à tête élargie sont en place, étendre la tête élargie jusqu'à une taille désignée au moyen d'un mécanisme d'expansion, puis verser du béton sur la tête élargie, c'est-à-dire une section de corps élargie et une section de corps non élargie étant formées pour atteindre une résistance nominale requise par la conception et la spécification ; au moyen de la tige de traction, c'est-à-dire la nervure principale, dans la tige d'ancrage, appliquer une précontrainte sur la nervure principale à l'aide d'un dispositif et d'un procédé qui peut appliquer une précontrainte ; et, après l'achèvement de l'application d'une précontrainte requise par la conception et la spécification, réaliser un verrouillage, puis retirer un dispositif d'appareil, qui a subi une précontrainte, qui doit être retiré, l'ensemble de la tige d'ancrage étant composé du béton coulé et du système d'ossature de tige d'ancrage.
本申请提供一种扩大头预应力混凝土锚杆施工工法,由锚杆骨架体系与预应力混凝土灌注凝固而成的锚杆;其具体施工实施步骤是,钻孔定位;钻孔钻进至设计深度,开展旋喷或机械扩孔施工并成孔,下放锚杆的拉杆即主筋与扩大头骨架或固定直径锚头骨架;锚杆的拉杆即主筋与扩大头,扩大头骨架到位后,扩大机构将扩大头扩大至设计尺寸,然后灌注混凝土在扩大头即扩体段和非扩体段成型,至设计和规范要求的额定强度后;锚杆中拉杆即主筋采用能施加预应力的装置和方法对主筋施加预应力;施加设计和规范要求的预应力,完成后并锁定,再撤消需要撤除的预应力施加的设备装置;锚杆的整体部分由浇筑的混凝土与锚杆骨架体构成。
CONSTRUCTION METHOD FOR EXPANDED-HEAD PRESTRESSED CONCRETE ANCHOR ROD
Provided is a construction method for an expanded-head prestressed concrete anchor rod. The anchor rod is formed by pouring and solidifying an anchor rod framework system and prestressed concrete, and the method therefor comprises the specific construction implementation steps of: performing drilling and positioning; drilling to a designed depth, performing jet grouting or mechanical reaming construction and forming a hole, and lowering a pull rod, i.e. a main rib, of the anchor rod and an expanded-head framework or a fixed-diameter anchor head framework; after the pull rod, i.e. the main rib, of the anchor rod, an expanded head and the expanded-head framework are in place, expanding the expanded head to a designed size by means of an expansion mechanism, and then pouring concrete on the expanded head, i.e. an expanded body section and a non-expanded body section being formed to reach a rated strength required by design and specification; by means of the pull rod, i.e. the main rib, in the anchor rod, applying prestress to the main rib by using a device and a method that can apply prestress; and after completion of applying prestress required by design and specification, performing locking, and then removing an apparatus device, which has had prestress applied thereto, that needs to be removed, wherein the whole of the anchor rod is composed of the poured concrete and the anchor rod framework system.
L'invention concerne un procédé de construction pour une tige d'ancrage en béton précontraint à tête élargie. La tige d'ancrage est formée en versant et en solidifiant un système d'ossature de tige d'ancrage et du béton précontraint, et le procédé pour celle-ci comprend les étapes de mise en œuvre de construction spécifiques consistant à : effectuer un perçage et un positionnement ; percer à une profondeur désignée, réaliser une construction d'injection de coulis à jet ou d'alésage mécanique et former un trou, et abaisser une tige de traction, c'est-à-dire une nervure principale, de la tige d'ancrage et une ossature à tête élargie ou une ossature de tête d'ancrage à diamètre fixe ; une fois que la tige de traction, c'est-à-dire la nervure principale, de la tige d'ancrage, une tête élargie et l'ossature à tête élargie sont en place, étendre la tête élargie jusqu'à une taille désignée au moyen d'un mécanisme d'expansion, puis verser du béton sur la tête élargie, c'est-à-dire une section de corps élargie et une section de corps non élargie étant formées pour atteindre une résistance nominale requise par la conception et la spécification ; au moyen de la tige de traction, c'est-à-dire la nervure principale, dans la tige d'ancrage, appliquer une précontrainte sur la nervure principale à l'aide d'un dispositif et d'un procédé qui peut appliquer une précontrainte ; et, après l'achèvement de l'application d'une précontrainte requise par la conception et la spécification, réaliser un verrouillage, puis retirer un dispositif d'appareil, qui a subi une précontrainte, qui doit être retiré, l'ensemble de la tige d'ancrage étant composé du béton coulé et du système d'ossature de tige d'ancrage.
本申请提供一种扩大头预应力混凝土锚杆施工工法,由锚杆骨架体系与预应力混凝土灌注凝固而成的锚杆;其具体施工实施步骤是,钻孔定位;钻孔钻进至设计深度,开展旋喷或机械扩孔施工并成孔,下放锚杆的拉杆即主筋与扩大头骨架或固定直径锚头骨架;锚杆的拉杆即主筋与扩大头,扩大头骨架到位后,扩大机构将扩大头扩大至设计尺寸,然后灌注混凝土在扩大头即扩体段和非扩体段成型,至设计和规范要求的额定强度后;锚杆中拉杆即主筋采用能施加预应力的装置和方法对主筋施加预应力;施加设计和规范要求的预应力,完成后并锁定,再撤消需要撤除的预应力施加的设备装置;锚杆的整体部分由浇筑的混凝土与锚杆骨架体构成。
CONSTRUCTION METHOD FOR EXPANDED-HEAD PRESTRESSED CONCRETE ANCHOR ROD
PROCÉDÉ DE CONSTRUCTION POUR TIGE D'ANCRAGE EN BÉTON PRÉCONTRAINT À TÊTE ÉLARGIE
一种扩大头预应力混凝土锚杆施工工法
WANG LIN (author) / TAO GANG (author) / WANG JUN (author) / LIU SONGMEI (author)
2021-12-16
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of expanded-head prestressed concrete anchor rod
European Patent Office | 2020
|Prestressed expanded-head anti-floating anchor rod and construction method
European Patent Office | 2022
|Construction method of prestressed steel strand high-pressure jet expanded-head anchor rod
European Patent Office | 2024
|Construction method of concrete expanded head prestress anti-pulling anchor rod
European Patent Office | 2021
|