METHOD FOR CONTROLLING GLACIAL LAKE OUTBURST FLOOD AND DEBRIS FLOW
A method for controlling a glacial lake (2) outburst flood and debris flow (4). Fast peak regulation is achieved by means of water-stone separation and water flow dispersion to control the scale of the outburst flood and debris flow (4); and cascade amplification of the scale of the outburst flood and debris flow (4) is reduced by a method of gradually dissipating energy and controlling provenance movement. A diversion dam (9) is built at the downstream area for diversion regulation to layer and fast drain the outburst flood and debris flow (4) to a main river (13); a control project can be built in advance at the area having the risk of catastrophic glacial lake (2) outburst flood and debris flow (4) to construct a control system; the flow of the flood and debris flow (4) is separated, the energy of the flow is dissipated, and projects such as energy dissipating submerged sills (7) and check dams (8) are used to gradually reduce the energy of the outburst flood and debris flow (4); rocks having huge impact energy to the downstream area are blocked; the movement of channel and channel edge provenance is controlled to prevent forming debris flows; and in addition, and the formed diluted debris flow or debris flow having high volumetric weight and low viscosity can be subjected to water-stone separation to convert the diluted debris flow into flood.
L'invention concerne un procédé de contrôle de crue d'inondation et de coulée de débris (4) de lac glaciaire (2). Une régulation rapide du pic est obtenue au moyen d'une séparation eau-pierre et d'une dispersion d'écoulement d'eau pour contrôler l'échelle des crues d'inondation et de coulée de débris (4) ; et une amplification en cascade de l'échelle des crus d'inondation et de coulée de débris (4) est réduite par un procédé de dissipation progressive de l'énergie et de commande du mouvement de provenance. Un barrage de déviation (9) est construit au niveau de la zone aval pour la régulation de déviation en couche et le drainage rapide des crues d'inondation et de coulée de débris (4) vers une rivière principale (13) ; un projet de contrôle peut être construit à l'avance au niveau de la zone ayant le risque catastrophique de crue d'inondation et de coulée de débris (4) de lac glaciaire (2) pour construire un système de contrôle ; l'écoulement des crues d'inondation et de coulée de débris (4) est séparé, l'énergie de l'écoulement est dissipée, et des projets tels que des rebords submergés (7) à dissipation d'énergie et des barrages de retenue (8) sont utilisés pour réduire progressivement l'énergie des crues d'inondation et de coulée de débris (4) ; les roches ayant une forte énergie d'impact sur la zone aval sont bloquées ; le mouvement du canal et de la provenance du bord du canal est commandé pour empêcher la formation de flux de débris ; et en outre, le flux de débris dispersé formé ou l'écoulement de débris ayant un poids volumétrique élevé et une faible viscosité peuvent être soumis à une séparation eau-pierre pour convertir le flux de débris dispersé en inondation.
一种冰湖(2)溃决型洪水泥石流(4)的防治方法,通过水石分离、水流分散达到快速调峰,控制溃决洪水泥石流(4)的规模,利用逐级消能控制物源起动的方法降低溃决洪水泥石流(4)规模的级联放大,在下游区域通过修建分流坝(9)进行分流调控将溃决洪水泥石流(4)分层、快速排导至主河(13),可在冰湖(2)溃决特大洪水泥石流(4)风险的区域,提前修建防治工程构建防治体系,对洪水泥石流(4)流量进行分离、消耗其能量、采用消能潜槛(7)和拦砂坝(8)等工程,逐级降低溃决洪水泥石流(4)的能量,拦挡对下游有巨大冲击能量的块石,控制沟道沟岸物源起动形成泥石流,同时也可以将形成的稀性泥石流或高容重低粘性的泥石流进行水石分离,将稀性泥石流转化为洪水。
METHOD FOR CONTROLLING GLACIAL LAKE OUTBURST FLOOD AND DEBRIS FLOW
A method for controlling a glacial lake (2) outburst flood and debris flow (4). Fast peak regulation is achieved by means of water-stone separation and water flow dispersion to control the scale of the outburst flood and debris flow (4); and cascade amplification of the scale of the outburst flood and debris flow (4) is reduced by a method of gradually dissipating energy and controlling provenance movement. A diversion dam (9) is built at the downstream area for diversion regulation to layer and fast drain the outburst flood and debris flow (4) to a main river (13); a control project can be built in advance at the area having the risk of catastrophic glacial lake (2) outburst flood and debris flow (4) to construct a control system; the flow of the flood and debris flow (4) is separated, the energy of the flow is dissipated, and projects such as energy dissipating submerged sills (7) and check dams (8) are used to gradually reduce the energy of the outburst flood and debris flow (4); rocks having huge impact energy to the downstream area are blocked; the movement of channel and channel edge provenance is controlled to prevent forming debris flows; and in addition, and the formed diluted debris flow or debris flow having high volumetric weight and low viscosity can be subjected to water-stone separation to convert the diluted debris flow into flood.
L'invention concerne un procédé de contrôle de crue d'inondation et de coulée de débris (4) de lac glaciaire (2). Une régulation rapide du pic est obtenue au moyen d'une séparation eau-pierre et d'une dispersion d'écoulement d'eau pour contrôler l'échelle des crues d'inondation et de coulée de débris (4) ; et une amplification en cascade de l'échelle des crus d'inondation et de coulée de débris (4) est réduite par un procédé de dissipation progressive de l'énergie et de commande du mouvement de provenance. Un barrage de déviation (9) est construit au niveau de la zone aval pour la régulation de déviation en couche et le drainage rapide des crues d'inondation et de coulée de débris (4) vers une rivière principale (13) ; un projet de contrôle peut être construit à l'avance au niveau de la zone ayant le risque catastrophique de crue d'inondation et de coulée de débris (4) de lac glaciaire (2) pour construire un système de contrôle ; l'écoulement des crues d'inondation et de coulée de débris (4) est séparé, l'énergie de l'écoulement est dissipée, et des projets tels que des rebords submergés (7) à dissipation d'énergie et des barrages de retenue (8) sont utilisés pour réduire progressivement l'énergie des crues d'inondation et de coulée de débris (4) ; les roches ayant une forte énergie d'impact sur la zone aval sont bloquées ; le mouvement du canal et de la provenance du bord du canal est commandé pour empêcher la formation de flux de débris ; et en outre, le flux de débris dispersé formé ou l'écoulement de débris ayant un poids volumétrique élevé et une faible viscosité peuvent être soumis à une séparation eau-pierre pour convertir le flux de débris dispersé en inondation.
一种冰湖(2)溃决型洪水泥石流(4)的防治方法,通过水石分离、水流分散达到快速调峰,控制溃决洪水泥石流(4)的规模,利用逐级消能控制物源起动的方法降低溃决洪水泥石流(4)规模的级联放大,在下游区域通过修建分流坝(9)进行分流调控将溃决洪水泥石流(4)分层、快速排导至主河(13),可在冰湖(2)溃决特大洪水泥石流(4)风险的区域,提前修建防治工程构建防治体系,对洪水泥石流(4)流量进行分离、消耗其能量、采用消能潜槛(7)和拦砂坝(8)等工程,逐级降低溃决洪水泥石流(4)的能量,拦挡对下游有巨大冲击能量的块石,控制沟道沟岸物源起动形成泥石流,同时也可以将形成的稀性泥石流或高容重低粘性的泥石流进行水石分离,将稀性泥石流转化为洪水。
METHOD FOR CONTROLLING GLACIAL LAKE OUTBURST FLOOD AND DEBRIS FLOW
PROCÉDÉ DE CONTRÔLE DE CRUE D'INONDATION ET DE COULÉE DE DÉBRIS DE LAC GLACIAIRE
冰湖溃决型洪水泥石流防治方法
CHEN JIANGANG (author) / CHEN XIAOQING (author) / CUI PENG (author) / YOU YONG (author) / CHEN HUAYONG (author) / LI SHUAI (author) / TANG JINBO (author) / ZHAO WANYU (author) / ZNEG LU (author) / WANG XIAN (author)
2022-01-27
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Glacial Lake Outburst Flood Modeling
TIBKAT | 2017
|Erosion and morphology of a debris flow caused by a glacial lake outburst flood, Western Norway
British Library Online Contents | 2008
|Hydrodynamic modelling of glacial lake outburst flood in lower Barun lake
Springer Verlag | 2025
|Hydrodynamic modelling of glacial lake outburst flood in lower Barun lake
Springer Verlag | 2025
|