A platform for research: civil engineering, architecture and urbanism
ANTI-FLOATING ANCHOR CABLE WATERPROOF STRUCTURE AND CONSTRUCTION METHOD THEREFOR
The present application relates to the technical field of underground structure construction, and specifically relates to an anti-floating anchor cable waterproof structure and a construction method therefor. The anti-floating anchor cable waterproof structure comprises: an anchor cable body, one end of which is buried in a cement grouting body and passes through a concrete cushion layer, a first waterproof coating layer and a first flexible waterproof layer from bottom to top; and a tension member, which is provided on the first flexible waterproof layer and applies a pressing force to the first flexible waterproof layer, wherein the anchor cable body passes through the tension member and is then locked. The first waterproof coating layer and the first flexible waterproof layer are arranged on the concrete cushion layer, and the rigid concrete cushion layer and the flexible first flexible waterproof layer are used in cooperation for waterproofing, which prevents water from leaking when there is a large gap between the concrete cushion layer and the anchor cable body caused by the loosening of the concrete cushion layer during the vertical stretching of the anchor cable body. Once the anchor cable body is stretched, the first flexible waterproof layer may still ensure a tight fit with the anchor cable body, thus ensuring that no groundwater will seep out along the anchor cable body.
La présente demande se rapporte au domaine technique de la construction de structure souterraine et plus particulièrement à une structure étanche à l'eau de câble d'ancrage anti-flottant et à son procédé de construction. La structure étanche à l'eau de câble d'ancrage anti-flottant comprend : un corps de câble d'ancrage, dont une extrémité est enterrée dans un corps injecté de ciment et traverse une couche de coussin en béton, une première couche de revêtement étanche à l'eau et une première couche étanche à l'eau souple de bas en haut ; et un élément de tension, qui est disposé sur la première couche étanche à l'eau souple et applique une force de pression à la première couche étanche à l'eau souple, le corps de câble d'ancrage passant à travers l'élément de tension et étant ensuite verrouillé. La première couche de revêtement étanche à l'eau et la première couche étanche à l'eau souple sont disposées sur la couche de coussin en béton et la couche de coussin en béton rigide et la première couche souple étanche à l'eau souple coopèrent pour l'étanchéité, ce qui empêche l'eau de fuir lorsqu'il existe un grand espace entre la couche de coussin en béton et le corps de câble d'ancrage provoqué par le desserrage de la couche de coussin en béton pendant l'étirement vertical du corps de câble d'ancrage. Une fois que le corps de câble d'ancrage est étiré, la première couche étanche à l'eau souple peut encore assurer un ajustement serré avec le corps de câble d'ancrage, évitant ainsi que l'eau souterraine ne s'écoule à l'extérieur le long du corps de câble d'ancrage.
本申请涉及地下结构施工技术领域,具体涉及一种抗浮锚索防水结构及其施工方法。抗浮锚索防水结构,包括:锚索本体,一端埋设在水泥注浆体内,并从下到上依次贯穿混凝土垫层、第一防水涂料层和第一柔性防水层;张拉件,设于第一柔性防水层上,对第一柔性防水层施加压紧力,锚索本体贯穿张拉件后锁紧。通过在混凝土垫层上设置第一防水涂料层和第一柔性防水层,利用刚性的混凝土垫层和柔性的第一柔性防水层配合防水,避免了由于锚索本体的竖向拉伸时混凝土垫层发生松动导致的混凝土垫层与锚索本体之间出现较大缝隙时发生的漏水。对锚索本体进行张拉后,第一柔性防水层仍与锚索本体之间能够保证紧密配合,保证不会有地下水会沿锚索本体渗出。
ANTI-FLOATING ANCHOR CABLE WATERPROOF STRUCTURE AND CONSTRUCTION METHOD THEREFOR
The present application relates to the technical field of underground structure construction, and specifically relates to an anti-floating anchor cable waterproof structure and a construction method therefor. The anti-floating anchor cable waterproof structure comprises: an anchor cable body, one end of which is buried in a cement grouting body and passes through a concrete cushion layer, a first waterproof coating layer and a first flexible waterproof layer from bottom to top; and a tension member, which is provided on the first flexible waterproof layer and applies a pressing force to the first flexible waterproof layer, wherein the anchor cable body passes through the tension member and is then locked. The first waterproof coating layer and the first flexible waterproof layer are arranged on the concrete cushion layer, and the rigid concrete cushion layer and the flexible first flexible waterproof layer are used in cooperation for waterproofing, which prevents water from leaking when there is a large gap between the concrete cushion layer and the anchor cable body caused by the loosening of the concrete cushion layer during the vertical stretching of the anchor cable body. Once the anchor cable body is stretched, the first flexible waterproof layer may still ensure a tight fit with the anchor cable body, thus ensuring that no groundwater will seep out along the anchor cable body.
La présente demande se rapporte au domaine technique de la construction de structure souterraine et plus particulièrement à une structure étanche à l'eau de câble d'ancrage anti-flottant et à son procédé de construction. La structure étanche à l'eau de câble d'ancrage anti-flottant comprend : un corps de câble d'ancrage, dont une extrémité est enterrée dans un corps injecté de ciment et traverse une couche de coussin en béton, une première couche de revêtement étanche à l'eau et une première couche étanche à l'eau souple de bas en haut ; et un élément de tension, qui est disposé sur la première couche étanche à l'eau souple et applique une force de pression à la première couche étanche à l'eau souple, le corps de câble d'ancrage passant à travers l'élément de tension et étant ensuite verrouillé. La première couche de revêtement étanche à l'eau et la première couche étanche à l'eau souple sont disposées sur la couche de coussin en béton et la couche de coussin en béton rigide et la première couche souple étanche à l'eau souple coopèrent pour l'étanchéité, ce qui empêche l'eau de fuir lorsqu'il existe un grand espace entre la couche de coussin en béton et le corps de câble d'ancrage provoqué par le desserrage de la couche de coussin en béton pendant l'étirement vertical du corps de câble d'ancrage. Une fois que le corps de câble d'ancrage est étiré, la première couche étanche à l'eau souple peut encore assurer un ajustement serré avec le corps de câble d'ancrage, évitant ainsi que l'eau souterraine ne s'écoule à l'extérieur le long du corps de câble d'ancrage.
本申请涉及地下结构施工技术领域,具体涉及一种抗浮锚索防水结构及其施工方法。抗浮锚索防水结构,包括:锚索本体,一端埋设在水泥注浆体内,并从下到上依次贯穿混凝土垫层、第一防水涂料层和第一柔性防水层;张拉件,设于第一柔性防水层上,对第一柔性防水层施加压紧力,锚索本体贯穿张拉件后锁紧。通过在混凝土垫层上设置第一防水涂料层和第一柔性防水层,利用刚性的混凝土垫层和柔性的第一柔性防水层配合防水,避免了由于锚索本体的竖向拉伸时混凝土垫层发生松动导致的混凝土垫层与锚索本体之间出现较大缝隙时发生的漏水。对锚索本体进行张拉后,第一柔性防水层仍与锚索本体之间能够保证紧密配合,保证不会有地下水会沿锚索本体渗出。
ANTI-FLOATING ANCHOR CABLE WATERPROOF STRUCTURE AND CONSTRUCTION METHOD THEREFOR
STRUCTURE ÉTANCHE À L'EAU DE CÂBLE D'ANCRAGE ANTI-FLOTTANT ET SON PROCÉDÉ DE CONSTRUCTION
一种抗浮锚索防水结构及其施工方法
ZHAO YUNLONG (author) / CHEN HUAZHOU (author) / WANG SHUBAO (author) / XIA YUANZHE (author) / ZHANG BUTING (author) / LI HAO (author) / ZHAO XIAOHUAN (author) / LI XU (author)
2022-01-27
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Anti-floating anchor rod waterproof structure and construction method
European Patent Office | 2023
|Anti-floating anchor rod waterproof structure and construction method
European Patent Office | 2021
|Anti-floating anchor rod waterproof structure and construction method
European Patent Office | 2022
|Anti-floating anchor top waterproof joint structure and construction method
European Patent Office | 2022
|Anti-floating anchor node waterproof structure and construction method thereof
European Patent Office | 2023
|