SUCTION BUCKET FOUNDATION HAVING PRECAST CONCRETE PRESSING BLOCKS
A suction bucket foundation having precast concrete pressing blocks. The suction bucket foundation comprises an upper transition section and a lower suction bucket, the upper transition section is provided on the upper portion of the lower suction bucket, and several precast concrete pressing blocks are provided on the lower suction bucket. The present invention can effectively solve the problems: in order to increase the weight of an upper transition section of an existing suction bucket foundation, the overall weight of the suction bucket foundation is increased by directly pouring and tamping concrete on a lower bucket body, however, concrete is poured on the surface of the bucket body for a long time, the maintenance time is long, the occupied area is large, moreover, the overall flexural rigidity of an existing suction bucket foundation structure needs to be improved by increasing the height of the bucket body and consequently the structural steel consumption is large.
Fondation de godet-pompe à blocs de pressage en béton. La fondation de godet-pompe comprend une section de transition supérieure et un godet-pompe inférieur, la section de transition supérieure est disposée sur la partie supérieure du godet-pompe inférieur, et plusieurs blocs de pressage en béton sont disposés sur le godet-pompe inférieur. La présente invention peut résoudre efficacement les problèmes suivants : afin d'augmenter le poids d'une section de transition supérieure d'une fondation de godet-pompe existante, le poids total de la fondation de godet-pompe est augmenté par versement direct et damage du béton sur un corps de godet inférieur, cependant, du béton est versé sur la surface du corps de godet pendant une longue durée, le temps d'entretien est long, la surface occupée est importante, de plus, la rigidité à la flexion globale d'une structure de fondation de godet-pompe existante doit être améliorée par augmentation de la hauteur du corps de godet et par conséquent la consommation d'acier de construction est importante.
一种带预制混凝土压块的吸力桶基础,包括上部过渡段、下部吸力桶,所述下部吸力桶上部设置上部过渡段,所述下部吸力桶上设置若干预制的混凝土压块。本发明能够有效解决目前的吸力桶基础为增加上部过渡段的重量,在下部桶体上直接浇捣混凝土的方式来提高吸力桶基础的整体重量,然而,在桶体表面浇筑混凝土耗时长,养护时间久,占用场地大,与此同时,目前的吸力桶基础结构需要通过增加桶体自身高度的方式来提高结构的整体抗弯刚度,使得结构用钢量大的问题。
SUCTION BUCKET FOUNDATION HAVING PRECAST CONCRETE PRESSING BLOCKS
A suction bucket foundation having precast concrete pressing blocks. The suction bucket foundation comprises an upper transition section and a lower suction bucket, the upper transition section is provided on the upper portion of the lower suction bucket, and several precast concrete pressing blocks are provided on the lower suction bucket. The present invention can effectively solve the problems: in order to increase the weight of an upper transition section of an existing suction bucket foundation, the overall weight of the suction bucket foundation is increased by directly pouring and tamping concrete on a lower bucket body, however, concrete is poured on the surface of the bucket body for a long time, the maintenance time is long, the occupied area is large, moreover, the overall flexural rigidity of an existing suction bucket foundation structure needs to be improved by increasing the height of the bucket body and consequently the structural steel consumption is large.
Fondation de godet-pompe à blocs de pressage en béton. La fondation de godet-pompe comprend une section de transition supérieure et un godet-pompe inférieur, la section de transition supérieure est disposée sur la partie supérieure du godet-pompe inférieur, et plusieurs blocs de pressage en béton sont disposés sur le godet-pompe inférieur. La présente invention peut résoudre efficacement les problèmes suivants : afin d'augmenter le poids d'une section de transition supérieure d'une fondation de godet-pompe existante, le poids total de la fondation de godet-pompe est augmenté par versement direct et damage du béton sur un corps de godet inférieur, cependant, du béton est versé sur la surface du corps de godet pendant une longue durée, le temps d'entretien est long, la surface occupée est importante, de plus, la rigidité à la flexion globale d'une structure de fondation de godet-pompe existante doit être améliorée par augmentation de la hauteur du corps de godet et par conséquent la consommation d'acier de construction est importante.
一种带预制混凝土压块的吸力桶基础,包括上部过渡段、下部吸力桶,所述下部吸力桶上部设置上部过渡段,所述下部吸力桶上设置若干预制的混凝土压块。本发明能够有效解决目前的吸力桶基础为增加上部过渡段的重量,在下部桶体上直接浇捣混凝土的方式来提高吸力桶基础的整体重量,然而,在桶体表面浇筑混凝土耗时长,养护时间久,占用场地大,与此同时,目前的吸力桶基础结构需要通过增加桶体自身高度的方式来提高结构的整体抗弯刚度,使得结构用钢量大的问题。
SUCTION BUCKET FOUNDATION HAVING PRECAST CONCRETE PRESSING BLOCKS
FONDATION DE GODET-POMPE À BLOCS DE PRESSAGE EN BÉTON
一种带预制混凝土压块的吸力桶基础
CHEN XIAOLU (author) / QIU XU (author) / HANG ZHAOFENG (author) / GUO XIAOJIANG (author) / GUAN CHUNYU (author) / YAN SHU (author) / LIU MINGJIANG (author) / ZHANG BO (author) / YAO ZHONGYUAN (author) / YANG LIHUA (author)
2022-03-31
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Suction bucket foundation with prefabricated concrete pressing blocks
European Patent Office | 2020
|Geopolymer gas film concrete suction bucket foundation and construction method thereof
European Patent Office | 2022
|Suction bucket foundation using vacuum preloading method
European Patent Office | 2017
|European Patent Office | 2016