IN-SITU LIFTING METHOD FOR POLE AND TOWER
The present invention relates to the field of power system apparatuses, and more particularly, relates to an in-situ lifting method for a pole and tower. The method comprises the following steps: step S1: establishing a component set, wherein the component set is used for storing component information for transforming a pole and tower; step S2: analyzing a force applied to each member of the pole and tower after in-situ lifting, and selecting a first component from the component set, wherein the component is composed of different members, the in-situ lifting of the pole and tower relates to performing in-situ transformation on the pole and tower by using a component in the component set, so as to increase the height of the pole and tower, and the first component is the component in the component set that is best suited for the in-situ lifting of the pole and tower; step S3: improving the first component according to a force applied to each member of the first component, so as to acquire a second component; step S4: conducting a member experiment on the second component; and step S5: transforming the pole and tower by using the second component on which the member experiment has been completed, so as to realize in-situ lifting. In comparison with the prior art, a pole and tower transformed by means of the present invention is safer.
La présente invention se rapporte au domaine des appareils de systéme énergétique, et concerne plus particulièrement un procédé de levage in situ pour un mât. Le procédé comprend les étapes suivantes : étape S1 : l'établissement d'un ensemble de composants utilisé pour stocker des informations de composant pour transformer un mât ; étape S2 : l'analyse d'une force appliquée à chaque élément du mât après le levage in situ, et la sélection d'un premier composant à partir de l'ensemble de composants, le composant étant composé de différents éléments, le levage in situ du mât se rapportant à la réalisation d'une transformation in situ sur le mât à l'aide d'un composant dans l'ensemble de composants, de façon à augmenter la hauteur du mât, et le premier composant étant le composant dans l'ensemble de composants qui est le mieux approprié pour le levage in situ du mât ; étape S3 : l'amélioration du premier composant en fonction d'une force appliquée à chaque élément du premier composant, de façon à acquérir un second composant ; étape S4 : la réalisation d'une expérience d'élément sur le second composant ; et l'étape S5 : la transformation du mât en utilisant le second composant sur lequel l'expérience d'élément a été achevé, de façon à réaliser un levage in situ. Par rapport à l'état de la technique, un mât transformé au moyen de la présente invention est plus sûr.
本发明涉及电力系统装置领域,更具体地,涉及一种杆塔原位升高方法,该方法包括以下步骤:步骤S1:建立部件集;所述部件集用于存储改造杆塔的部件信息;步骤S2:分析杆塔原位升高后各构件的受力,从部件集中选取第一部件;所述部件由不同的构件组成;所述杆塔原位升高为利用部件集中的部件对杆塔进行就地改造,提升杆塔的高度;所述第一部件为部件集中最适合用于原位升高杆塔的部件;步骤S3:根据第一部件各构件的受力对第一部件进行改进,获取第二部件;步骤S4:对第二部件进行构件实验;步骤S5:利用完成构件实验的第二部件改造杆塔,实现原位升高。本发明改造的杆塔与现有技术相比,安全性更高。
IN-SITU LIFTING METHOD FOR POLE AND TOWER
The present invention relates to the field of power system apparatuses, and more particularly, relates to an in-situ lifting method for a pole and tower. The method comprises the following steps: step S1: establishing a component set, wherein the component set is used for storing component information for transforming a pole and tower; step S2: analyzing a force applied to each member of the pole and tower after in-situ lifting, and selecting a first component from the component set, wherein the component is composed of different members, the in-situ lifting of the pole and tower relates to performing in-situ transformation on the pole and tower by using a component in the component set, so as to increase the height of the pole and tower, and the first component is the component in the component set that is best suited for the in-situ lifting of the pole and tower; step S3: improving the first component according to a force applied to each member of the first component, so as to acquire a second component; step S4: conducting a member experiment on the second component; and step S5: transforming the pole and tower by using the second component on which the member experiment has been completed, so as to realize in-situ lifting. In comparison with the prior art, a pole and tower transformed by means of the present invention is safer.
La présente invention se rapporte au domaine des appareils de systéme énergétique, et concerne plus particulièrement un procédé de levage in situ pour un mât. Le procédé comprend les étapes suivantes : étape S1 : l'établissement d'un ensemble de composants utilisé pour stocker des informations de composant pour transformer un mât ; étape S2 : l'analyse d'une force appliquée à chaque élément du mât après le levage in situ, et la sélection d'un premier composant à partir de l'ensemble de composants, le composant étant composé de différents éléments, le levage in situ du mât se rapportant à la réalisation d'une transformation in situ sur le mât à l'aide d'un composant dans l'ensemble de composants, de façon à augmenter la hauteur du mât, et le premier composant étant le composant dans l'ensemble de composants qui est le mieux approprié pour le levage in situ du mât ; étape S3 : l'amélioration du premier composant en fonction d'une force appliquée à chaque élément du premier composant, de façon à acquérir un second composant ; étape S4 : la réalisation d'une expérience d'élément sur le second composant ; et l'étape S5 : la transformation du mât en utilisant le second composant sur lequel l'expérience d'élément a été achevé, de façon à réaliser un levage in situ. Par rapport à l'état de la technique, un mât transformé au moyen de la présente invention est plus sûr.
本发明涉及电力系统装置领域,更具体地,涉及一种杆塔原位升高方法,该方法包括以下步骤:步骤S1:建立部件集;所述部件集用于存储改造杆塔的部件信息;步骤S2:分析杆塔原位升高后各构件的受力,从部件集中选取第一部件;所述部件由不同的构件组成;所述杆塔原位升高为利用部件集中的部件对杆塔进行就地改造,提升杆塔的高度;所述第一部件为部件集中最适合用于原位升高杆塔的部件;步骤S3:根据第一部件各构件的受力对第一部件进行改进,获取第二部件;步骤S4:对第二部件进行构件实验;步骤S5:利用完成构件实验的第二部件改造杆塔,实现原位升高。本发明改造的杆塔与现有技术相比,安全性更高。
IN-SITU LIFTING METHOD FOR POLE AND TOWER
PROCÉDÉ DE LEVAGE IN SITU POUR MÂT
一种杆塔原位升高方法
LIAN JIYE (author) / WANG XUXIANG (author) / QIU KANGMING (author) / PEI DAWEI (author) / LIANG WEI (author) / LIANG YONGQUAN (author) / JIANG JIN (author) / MENG HUOGEN (author)
2022-06-02
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Movable automatic lifting platform for assembling telegraph pole tower
European Patent Office | 2024
|Temporary lifting point structure for dismantling ultrahigh large-span pole tower
European Patent Office | 2024
|Lifting steel wire rope bearing tackle assembly and pole holding system for pole tower assembly
European Patent Office | 2024
|