CONSTRUCTION METHOD FOR CONTINUOUS BEAM HAVING ASYMMETRICAL CROSS SECTION STIFFENED BY LARGE-SPAN ARCH
A construction method for a continuous beam having an asymmetrical cross section stiffened by a large-span arch, comprising the following steps: S1: designing a counterweight balance load by using a preset method to balance the bending moment of an arch-stiffened continuous beam; and S2: using a preset scheme to complete unbalanced counterweight construction on the large-span arch-stiffened continuous beam. The beneficial effects comprise: under large-span asymmetric cross section load and mobile protection construction conditions, a large unbalanced moment generated at one end is prevented by means of balancing counterweights in sections and moving the counterweights, so as to prevent a large deviation in main beam linearity from occurring during the construction process, ensure the smooth closing of an entire bridge, and achieve the expected linearity of the main beam formed into the bridge; and the tensile stress of a cross section roof caused by the counterweights may be effectively reduced, thereby preventing the generation of cracks.
La présente invention concerne un procédé de construction d'une poutre continue ayant une section transversale asymétrique renforcée par un arc de grande envergure, comprenant les étapes suivantes : S1 : consistant à concevoir une charge d'équilibrage de contrepoids à l'aide d'un procédé prédéfini pour équilibrer le moment de flexion d'une poutre continue renforcée par un arc ; et S2 : consistant à utiliser un schéma prédéfini pour compléter une construction de contrepoids déséquilibrée sur la poutre continue renforcée par un arc de grande envergure. Les effets bénéfiques comprennent : dans des conditions de charge de section transversale asymétrique de grande envergure et des conditions de construction de protection mobile, un moment de déséquilibre important généré à une extrémité est empêché au moyen de contrepoids d'équilibrage dans des sections et le déplacement des contrepoids, de manière à empêcher un écart important dans la linéarité de la poutre principale de se produire pendant le processus de construction, la possibilité d'assurer la fermeture régulière d'un pont complet, et d'obtenir la linéarité attendue de la poutre principale formée dans le pont ; et la contrainte de traction d'un toit de section transversale provoquée par les contrepoids peut être réduite de manière efficace, empêchant ainsi la génération de fissures.
一种大跨度拱加劲不对称截面连续梁施工方法,包括以下步骤:S1、采用预设方法设计配重平衡荷载,实现拱加劲连续梁弯矩平衡;S2、采用预设方案完成大跨度拱加劲连续梁不平衡配重施工。有益效果:在大跨度不对称截面荷载及移动防护施工条件下,通过分节段平衡配重及移动配载避免一端产生较大的不平衡力矩,以防止施工过程中主梁线性发生较大偏差,保证全桥顺利合龙、达到预期的主梁成桥线性;可以有效的减小因配重产生的截面顶板的拉应力,从而防止裂缝的产生。
CONSTRUCTION METHOD FOR CONTINUOUS BEAM HAVING ASYMMETRICAL CROSS SECTION STIFFENED BY LARGE-SPAN ARCH
A construction method for a continuous beam having an asymmetrical cross section stiffened by a large-span arch, comprising the following steps: S1: designing a counterweight balance load by using a preset method to balance the bending moment of an arch-stiffened continuous beam; and S2: using a preset scheme to complete unbalanced counterweight construction on the large-span arch-stiffened continuous beam. The beneficial effects comprise: under large-span asymmetric cross section load and mobile protection construction conditions, a large unbalanced moment generated at one end is prevented by means of balancing counterweights in sections and moving the counterweights, so as to prevent a large deviation in main beam linearity from occurring during the construction process, ensure the smooth closing of an entire bridge, and achieve the expected linearity of the main beam formed into the bridge; and the tensile stress of a cross section roof caused by the counterweights may be effectively reduced, thereby preventing the generation of cracks.
La présente invention concerne un procédé de construction d'une poutre continue ayant une section transversale asymétrique renforcée par un arc de grande envergure, comprenant les étapes suivantes : S1 : consistant à concevoir une charge d'équilibrage de contrepoids à l'aide d'un procédé prédéfini pour équilibrer le moment de flexion d'une poutre continue renforcée par un arc ; et S2 : consistant à utiliser un schéma prédéfini pour compléter une construction de contrepoids déséquilibrée sur la poutre continue renforcée par un arc de grande envergure. Les effets bénéfiques comprennent : dans des conditions de charge de section transversale asymétrique de grande envergure et des conditions de construction de protection mobile, un moment de déséquilibre important généré à une extrémité est empêché au moyen de contrepoids d'équilibrage dans des sections et le déplacement des contrepoids, de manière à empêcher un écart important dans la linéarité de la poutre principale de se produire pendant le processus de construction, la possibilité d'assurer la fermeture régulière d'un pont complet, et d'obtenir la linéarité attendue de la poutre principale formée dans le pont ; et la contrainte de traction d'un toit de section transversale provoquée par les contrepoids peut être réduite de manière efficace, empêchant ainsi la génération de fissures.
一种大跨度拱加劲不对称截面连续梁施工方法,包括以下步骤:S1、采用预设方法设计配重平衡荷载,实现拱加劲连续梁弯矩平衡;S2、采用预设方案完成大跨度拱加劲连续梁不平衡配重施工。有益效果:在大跨度不对称截面荷载及移动防护施工条件下,通过分节段平衡配重及移动配载避免一端产生较大的不平衡力矩,以防止施工过程中主梁线性发生较大偏差,保证全桥顺利合龙、达到预期的主梁成桥线性;可以有效的减小因配重产生的截面顶板的拉应力,从而防止裂缝的产生。
CONSTRUCTION METHOD FOR CONTINUOUS BEAM HAVING ASYMMETRICAL CROSS SECTION STIFFENED BY LARGE-SPAN ARCH
PROCÉDÉ DE CONSTRUCTION D'UNE POUTRE CONTINUE AYANT UNE SECTION TRANSVERSALE ASYMÉTRIQUE RENFORCÉE PAR UN ARC DE GRANDE ENVERGURE
一种大跨度拱加劲不对称截面连续梁施工方法
LIU WENSHENG (author) / LI FENGCHENG (author) / FENG CHAO (author) / LIANG PENG (author) / SHANG YAXIN (author) / SU LI (author) / MIN KUN (author) / XIE LEI (author) / CHEN YUNMING (author)
2022-06-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
LARGE SPAN ARCH STIFFENING ASYMMETRIC SECTION CONTINUOUS BEAM CONSTRUCTION METHOD
European Patent Office | 2022
|Construction method of large-span arch stiffening asymmetric section continuous beam
European Patent Office | 2021
|Construction method of large-span three-continuous arch bridge
European Patent Office | 2024
|Construction method of large-span steel box continuous arch bridge
European Patent Office | 2022
|European Patent Office | 2023
|