LONG-CONNECTED MULTI-SPAN CONTINUOUS BOX GIRDER SUPER-LONG PRESTRESSED THREADING METHOD, BOX GIRDER CONSTRUCTION METHOD AND BOX GIRDER
A long-connected multi-span continuous box girder super-long prestressed threading method, the method comprising: determining the span of a box girder to be fabricated, wherein the box girder comprises section AB, section BC and section CD along the span direction, and section BC is located between section AB and section CD; and threading section AB, section BC and section CD according to a set order, so that the box girder is prestressed throughout the entire length of the girder. Also relating to a box girder construction method and a box girder. In the method, segmented threading and on-site pouring are combined to complete a task that cannot be completed by the current largest threading machine. The construction method is simple, the equipment is simple, and construction materials are easily obtained conventional materials. Steel strand threading does little damage to a corrugated pipe, the steel strand is wrongly twisted less, is easy to disassemble and assemble, has a high working efficiency, and a fast construction speed. The entire stranding process of the steel strand may be completed at one time, which significantly improves the economic efficiency.
Procédé de filetage précontraint super-long de poutre-caisson continue à longue portée et à travées multiples, le procédé consistant : à déterminer la travée d'une poutre-caisson à fabriquer, la poutre-caisson comprenant une section AB, une section BC et une section CD dans le sens de la travée, et la section BC étant située entre la section AB et la section CD ; et à fileter la section AB, la section BC et la section CD selon un ordre défini, de sorte à pré-contraindre la poutre-caisson sur toute la longueur de la poutre. L'invention se rapporte également à un procédé de construction de poutre-caisson et à une poutre-caisson. Dans le procédé, le filetage segmenté et la coulée sur place sont combinés pour achever une tâche qui ne peut pas être achevée par la machine à fileter actuellement la plus grande. Le procédé de construction est simple, l'équipement est simple et les matériaux de construction sont facilement obtenus à l'aide de matériaux classiques. Le filetage de brin d'acier endommage peu les tuyaux ondulés, le brin d'acier est moins tordu d'une manière qui l'endommagerait, est facile à désassembler et à assembler, a un rendement de travail élevé et une vitesse de construction rapide. L'ensemble du processus de câblage du brin d'acier peut être achevé en une fois, ce qui améliore considérablement l'efficacité économique.
一种长联多跨连续箱梁超长预应力穿束方法,该方法包括:确定待制作箱梁的跨度,其中,待制作箱梁沿跨度方向上包括AB段、BC段和CD段, BC段位于AB段和CD段之间;按照设定顺序对AB段、BC段和CD段进行穿束,以使待制作箱梁具有贯通全梁的通长预应力。还涉及箱梁施工方法及箱梁。该方法结合分段式穿束和现场浇筑完成了目前最大穿束机无法完成的任务,施工方法简单,设备简单,施工材料是容易获得的常规材料。钢绞线穿束对波纹管破坏小,钢绞线错拧少,拆装容易,工作效率高,施工速度快,可以一次完成钢绞线整体穿束,显著提高经济效益。
LONG-CONNECTED MULTI-SPAN CONTINUOUS BOX GIRDER SUPER-LONG PRESTRESSED THREADING METHOD, BOX GIRDER CONSTRUCTION METHOD AND BOX GIRDER
A long-connected multi-span continuous box girder super-long prestressed threading method, the method comprising: determining the span of a box girder to be fabricated, wherein the box girder comprises section AB, section BC and section CD along the span direction, and section BC is located between section AB and section CD; and threading section AB, section BC and section CD according to a set order, so that the box girder is prestressed throughout the entire length of the girder. Also relating to a box girder construction method and a box girder. In the method, segmented threading and on-site pouring are combined to complete a task that cannot be completed by the current largest threading machine. The construction method is simple, the equipment is simple, and construction materials are easily obtained conventional materials. Steel strand threading does little damage to a corrugated pipe, the steel strand is wrongly twisted less, is easy to disassemble and assemble, has a high working efficiency, and a fast construction speed. The entire stranding process of the steel strand may be completed at one time, which significantly improves the economic efficiency.
Procédé de filetage précontraint super-long de poutre-caisson continue à longue portée et à travées multiples, le procédé consistant : à déterminer la travée d'une poutre-caisson à fabriquer, la poutre-caisson comprenant une section AB, une section BC et une section CD dans le sens de la travée, et la section BC étant située entre la section AB et la section CD ; et à fileter la section AB, la section BC et la section CD selon un ordre défini, de sorte à pré-contraindre la poutre-caisson sur toute la longueur de la poutre. L'invention se rapporte également à un procédé de construction de poutre-caisson et à une poutre-caisson. Dans le procédé, le filetage segmenté et la coulée sur place sont combinés pour achever une tâche qui ne peut pas être achevée par la machine à fileter actuellement la plus grande. Le procédé de construction est simple, l'équipement est simple et les matériaux de construction sont facilement obtenus à l'aide de matériaux classiques. Le filetage de brin d'acier endommage peu les tuyaux ondulés, le brin d'acier est moins tordu d'une manière qui l'endommagerait, est facile à désassembler et à assembler, a un rendement de travail élevé et une vitesse de construction rapide. L'ensemble du processus de câblage du brin d'acier peut être achevé en une fois, ce qui améliore considérablement l'efficacité économique.
一种长联多跨连续箱梁超长预应力穿束方法,该方法包括:确定待制作箱梁的跨度,其中,待制作箱梁沿跨度方向上包括AB段、BC段和CD段, BC段位于AB段和CD段之间;按照设定顺序对AB段、BC段和CD段进行穿束,以使待制作箱梁具有贯通全梁的通长预应力。还涉及箱梁施工方法及箱梁。该方法结合分段式穿束和现场浇筑完成了目前最大穿束机无法完成的任务,施工方法简单,设备简单,施工材料是容易获得的常规材料。钢绞线穿束对波纹管破坏小,钢绞线错拧少,拆装容易,工作效率高,施工速度快,可以一次完成钢绞线整体穿束,显著提高经济效益。
LONG-CONNECTED MULTI-SPAN CONTINUOUS BOX GIRDER SUPER-LONG PRESTRESSED THREADING METHOD, BOX GIRDER CONSTRUCTION METHOD AND BOX GIRDER
PROCÉDÉ DE FILETAGE PRÉCONTRAINT SUPER-LONG DE POUTRE-CAISSON CONTINUE À LONGUE PORTÉE ET À TRAVÉES MULTIPLES, PROCÉDÉ DE CONSTRUCTION DE POUTRE-CAISSON ET POUTRE-CAISSON
一种长联多跨连续箱梁超长预应力穿束方法、箱梁施工方法及箱梁
HU SONGTAO (author) / HE HONGBO (author) / WANG JIE (author) / LUO YANG (author) / GUO LE (author)
2022-07-07
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Research on Construction Control of Long-Span Prestressed Concrete Continuous Girder Bridge
Trans Tech Publications | 2014
|PRESTRESSED GIRDER AND MANUFACTURING METHOD OF PRESTRESSED GIRDER
European Patent Office | 2017
PRESTRESSED GIRDER AND MANUFACTURING METHOD OF PRESTRESSED GIRDER
European Patent Office | 2017
|