DOUBLE-DECK MULTI-SPAN BRIDGE CONSTRUCTION METHOD
Disclosed in the present invention is a double-deck multi-span bridge construction method. According to the double-deck bridge construction method of the present invention, construction is carried out by using a method of dissembling a support jig frame in a graded and span-separated mode, an upper chord jig frame and a lower chord jig frame can be used in a recycle manner, and construction costs are reduced. In addition, a construction period of building the support jig frame is shortened, and other construction operations can be synchronously carried out on a span in which the jig frame is disassembled, for example, fire retardant coating construction can be carried out on a mounted bridge deck after the jig frame is dissembled, and the construction period of a double-deck multi-span bridge is effectively shortened. Additionally, according to the double-deck multi-span bridge construction method in embodiments of the present invention, the upper chord jig frame and the lower chord jig frame are disassembled in a graded manner, thereby ensuring that a bridge structure can be smoothly and safely transitioned to a designed stress state.
La présente invention divulgue un procédé de construction de pont à double tablier à travées multiples. Selon le procédé de construction de pont à double tablier de la présente invention, la construction est réalisée au moyen d'un procédé de démontage d'un cadre de gabarit de support dans un mode à gradient et à travée étendue, un cadre de gabarit de corde supérieur et un cadre de gabarit de corde inférieur peuvent être utilisés de manière recyclée, et les coûts de construction sont réduits. De plus, une période de construction pour construire le cadre de gabarit de support est raccourcie, et d'autres opérations de construction peuvent être réalisées de manière synchrone sur une travée dans laquelle le cadre de gabarit est démonté, par exemple, une construction de revêtement ignifuge peut être réalisée sur un tablier monté après que le cadre de gabarit a été démonté, et la période de construction d'un pont à double tablier à travées multiples est efficacement raccourcie. De plus, selon le procédé de construction de pont à double tablier à travées multiples dans des modes de réalisation de la présente invention, le cadre de gabarit de corde supérieur et le cadre de gabarit de corde inférieur sont démontés de manière graduelle, ce qui permet d'assurer qu'une structure de pont peut être amenée à passer sans à-coups et de manière sûre à un état de contrainte conçu.
本发明公开了一种双层多跨桥梁施工方法。本发明的双层桥梁施工方法采用分级隔跨拆卸支承胎架的方法施工,使上弦胎架和下弦胎架可以周转使用,减少了施工成本。此外,搭建支撑胎架的施工周期缩短,且拆卸完胎架的跨可以同步进行其他施工操作,例如,胎架拆卸完后即可对已经安装好的桥面进行防火涂料施工,有效缩减双层多跨桥梁的施工周期。此外,本发明实施例中的双层多跨桥梁施工方法,通过分级拆卸上弦胎架和下弦胎架,能够保证桥梁结构平稳、安全的过度到设计受力状态。
DOUBLE-DECK MULTI-SPAN BRIDGE CONSTRUCTION METHOD
Disclosed in the present invention is a double-deck multi-span bridge construction method. According to the double-deck bridge construction method of the present invention, construction is carried out by using a method of dissembling a support jig frame in a graded and span-separated mode, an upper chord jig frame and a lower chord jig frame can be used in a recycle manner, and construction costs are reduced. In addition, a construction period of building the support jig frame is shortened, and other construction operations can be synchronously carried out on a span in which the jig frame is disassembled, for example, fire retardant coating construction can be carried out on a mounted bridge deck after the jig frame is dissembled, and the construction period of a double-deck multi-span bridge is effectively shortened. Additionally, according to the double-deck multi-span bridge construction method in embodiments of the present invention, the upper chord jig frame and the lower chord jig frame are disassembled in a graded manner, thereby ensuring that a bridge structure can be smoothly and safely transitioned to a designed stress state.
La présente invention divulgue un procédé de construction de pont à double tablier à travées multiples. Selon le procédé de construction de pont à double tablier de la présente invention, la construction est réalisée au moyen d'un procédé de démontage d'un cadre de gabarit de support dans un mode à gradient et à travée étendue, un cadre de gabarit de corde supérieur et un cadre de gabarit de corde inférieur peuvent être utilisés de manière recyclée, et les coûts de construction sont réduits. De plus, une période de construction pour construire le cadre de gabarit de support est raccourcie, et d'autres opérations de construction peuvent être réalisées de manière synchrone sur une travée dans laquelle le cadre de gabarit est démonté, par exemple, une construction de revêtement ignifuge peut être réalisée sur un tablier monté après que le cadre de gabarit a été démonté, et la période de construction d'un pont à double tablier à travées multiples est efficacement raccourcie. De plus, selon le procédé de construction de pont à double tablier à travées multiples dans des modes de réalisation de la présente invention, le cadre de gabarit de corde supérieur et le cadre de gabarit de corde inférieur sont démontés de manière graduelle, ce qui permet d'assurer qu'une structure de pont peut être amenée à passer sans à-coups et de manière sûre à un état de contrainte conçu.
本发明公开了一种双层多跨桥梁施工方法。本发明的双层桥梁施工方法采用分级隔跨拆卸支承胎架的方法施工,使上弦胎架和下弦胎架可以周转使用,减少了施工成本。此外,搭建支撑胎架的施工周期缩短,且拆卸完胎架的跨可以同步进行其他施工操作,例如,胎架拆卸完后即可对已经安装好的桥面进行防火涂料施工,有效缩减双层多跨桥梁的施工周期。此外,本发明实施例中的双层多跨桥梁施工方法,通过分级拆卸上弦胎架和下弦胎架,能够保证桥梁结构平稳、安全的过度到设计受力状态。
DOUBLE-DECK MULTI-SPAN BRIDGE CONSTRUCTION METHOD
PROCÉDÉ DE CONSTRUCTION DE PONT À DOUBLE TABLIER À TRAVÉES MULTIPLES
双层多跨桥梁施工方法
REN JINGLEI (author) / SUN BING (author) / GAO YONGGANG (author) / SHEN HONGYU (author) / ZHU SHAOHUI (author) / QI JIANGUO (author) / LIU CUI (author) / YAN RUIHUA (author) / HE ZHIQIANG (author) / LI LONGFEI (author)
2022-07-28
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Large-span double-deck bridge structure and construction method thereof
European Patent Office | 2024
|Construction method of large-span curved bridge deck slab
European Patent Office | 2023
|Combined bridge deck structure of large-span bridge and construction method thereof
European Patent Office | 2021
|Large-span deck type arch bridge girder hoisting construction method
European Patent Office | 2024
|