EXTRA-THICK COAL SEAM UPPER LAYER OLD GOAF ROOF RECONSTRUCTION METHOD AND CONSTRUCTION METHOD
Disclosed is an extra-thick coal seam upper layer old goaf roof reconstruction method. The method comprises: step 1, providing roadway filling holes (2), wherein the roadway filling holes are provided along a center line of the extension of a roadway (1) with a spacing of 80-100 m therebetween, and the distance between the roadway filling holes and an end of the roadway is not larger than 20 m, and after drilling of the roadway filling holes, the roadway filling holes are filled, and the filling comprises aggregate pouring and grouting; and step 2, providing goaf filling holes, wherein the goaf filling holes are provided at intervals in a row as a unit in a manner in which holes of adjacent rows are staggered with a spacing of 40-60 m between the holes, and a spacing of 20-30 m between rows, and a row of goaf filling holes are filled after being drilled, and the filling comprises aggregate pouring and grouting. Further disclosed is an extra-thick coal seam upper layer old goaf roof reconstruction construction method. According to the extra-thick coal seam upper layer old goaf roof reconstruction method and construction method, hole drilling is conducted on the ground within the range of the roadway and a goaf (3) of an old goaf, and cavities in the roadway and the goaf are filled by means of aggregate pouring and pressurized grouting, such that the dual goals of roof reconstruction and water and gas hidden danger treatment are achieved, thereby providing a safety guarantee for lower layer coal mining.
Est divulgué un procédé de reconstruction de toit de remblai ancien à couche supérieure extra-épaisse en veine de charbon. Le procédé comprend les étapes consistant à : étape 1, fournir des trous de remplissage de route (2), les trous de remplissage de route étant disposés le long d'une ligne centrale de l'extension d'une route (1) avec un espacement de 80 à 100 m entre ceux-ci, la distance entre les trous de remplissage de route et une extrémité de la route n'étant pas supérieure à 20 m, et après le forage des trous de remplissage de route, les trous de remplissage de route étant remplis et le remplissage consistant à verser et à sceller un agrégat ; et étape 2, fournir des trous de remplissage de remblai, les trous de remplissage de remblai étant disposés à des intervalles dans une rangée sous la forme d'une unité d'une manière dans laquelle des trous de rangées adjacentes sont décalés avec un espacement de 40 à 60 m entre les trous, et un espacement de 20 à 30 m entre les rangées, et une rangée de trous de remplissage de remblai étant remplie après avoir été forée, et le remplissage consistant à verser et à sceller un agrégat. Est en outre divulgué un procédé de construction de reconstruction de toit de remblai ancien à couche supérieure extra-épaisse en veine de charbon. Selon le procédé de reconstruction de toit de remblai ancien à couche supérieure extra-épaisse en veine de charbon et le procédé de construction, un forage de trou est réalisé dans le sol à l'intérieur de la zone de la route et d'un remblai (3) d'un ancien remblai, et des cavités dans la route et le remblai sont remplies au moyen d'un coulage et d'un scellement sous pression d'agrégat, de telle sorte que les objectifs doubles de reconstruction de toit et de traitement des dangers cachés liés à l'eau et au gaz sont obtenus, ce qui permet d'obtenir une garantie de sécurité pour une exploitation minière de charbon de couche inférieure.
公开了一种特厚煤层上分层老空区顶板再造方法,该方法包括:步骤1:设置巷道充填孔(2),巷道充填孔按照孔间距80~100m沿巷道(1)走向中心线布置,巷道充填孔距离巷道端部距离不大于20m;巷道充填孔钻进后对巷道充填孔进行填充,填充包括灌注骨料和注浆;步骤2:设置采空区充填孔;以排为单位,采空区充填孔按照邻排插空间隔布置,孔间距40~60m,排距20~30m;且采空区充填孔实行钻进一排填充一排的形式进行,填充包括灌注骨料和注浆。还公开了一种特厚煤层上分层老空区顶板再造施工方法,该特厚煤层上分层老空区顶板再造方法及施工方法是在老空区的巷道和采空区(3)范围内,从地面布置钻孔,通过灌注骨料和加压注浆的方式充填巷道和采空区的空洞,实现顶板再造和水、瓦斯隐患的治理的双重目标,为下分层煤开采提供安全保障。
EXTRA-THICK COAL SEAM UPPER LAYER OLD GOAF ROOF RECONSTRUCTION METHOD AND CONSTRUCTION METHOD
Disclosed is an extra-thick coal seam upper layer old goaf roof reconstruction method. The method comprises: step 1, providing roadway filling holes (2), wherein the roadway filling holes are provided along a center line of the extension of a roadway (1) with a spacing of 80-100 m therebetween, and the distance between the roadway filling holes and an end of the roadway is not larger than 20 m, and after drilling of the roadway filling holes, the roadway filling holes are filled, and the filling comprises aggregate pouring and grouting; and step 2, providing goaf filling holes, wherein the goaf filling holes are provided at intervals in a row as a unit in a manner in which holes of adjacent rows are staggered with a spacing of 40-60 m between the holes, and a spacing of 20-30 m between rows, and a row of goaf filling holes are filled after being drilled, and the filling comprises aggregate pouring and grouting. Further disclosed is an extra-thick coal seam upper layer old goaf roof reconstruction construction method. According to the extra-thick coal seam upper layer old goaf roof reconstruction method and construction method, hole drilling is conducted on the ground within the range of the roadway and a goaf (3) of an old goaf, and cavities in the roadway and the goaf are filled by means of aggregate pouring and pressurized grouting, such that the dual goals of roof reconstruction and water and gas hidden danger treatment are achieved, thereby providing a safety guarantee for lower layer coal mining.
Est divulgué un procédé de reconstruction de toit de remblai ancien à couche supérieure extra-épaisse en veine de charbon. Le procédé comprend les étapes consistant à : étape 1, fournir des trous de remplissage de route (2), les trous de remplissage de route étant disposés le long d'une ligne centrale de l'extension d'une route (1) avec un espacement de 80 à 100 m entre ceux-ci, la distance entre les trous de remplissage de route et une extrémité de la route n'étant pas supérieure à 20 m, et après le forage des trous de remplissage de route, les trous de remplissage de route étant remplis et le remplissage consistant à verser et à sceller un agrégat ; et étape 2, fournir des trous de remplissage de remblai, les trous de remplissage de remblai étant disposés à des intervalles dans une rangée sous la forme d'une unité d'une manière dans laquelle des trous de rangées adjacentes sont décalés avec un espacement de 40 à 60 m entre les trous, et un espacement de 20 à 30 m entre les rangées, et une rangée de trous de remplissage de remblai étant remplie après avoir été forée, et le remplissage consistant à verser et à sceller un agrégat. Est en outre divulgué un procédé de construction de reconstruction de toit de remblai ancien à couche supérieure extra-épaisse en veine de charbon. Selon le procédé de reconstruction de toit de remblai ancien à couche supérieure extra-épaisse en veine de charbon et le procédé de construction, un forage de trou est réalisé dans le sol à l'intérieur de la zone de la route et d'un remblai (3) d'un ancien remblai, et des cavités dans la route et le remblai sont remplies au moyen d'un coulage et d'un scellement sous pression d'agrégat, de telle sorte que les objectifs doubles de reconstruction de toit et de traitement des dangers cachés liés à l'eau et au gaz sont obtenus, ce qui permet d'obtenir une garantie de sécurité pour une exploitation minière de charbon de couche inférieure.
公开了一种特厚煤层上分层老空区顶板再造方法,该方法包括:步骤1:设置巷道充填孔(2),巷道充填孔按照孔间距80~100m沿巷道(1)走向中心线布置,巷道充填孔距离巷道端部距离不大于20m;巷道充填孔钻进后对巷道充填孔进行填充,填充包括灌注骨料和注浆;步骤2:设置采空区充填孔;以排为单位,采空区充填孔按照邻排插空间隔布置,孔间距40~60m,排距20~30m;且采空区充填孔实行钻进一排填充一排的形式进行,填充包括灌注骨料和注浆。还公开了一种特厚煤层上分层老空区顶板再造施工方法,该特厚煤层上分层老空区顶板再造方法及施工方法是在老空区的巷道和采空区(3)范围内,从地面布置钻孔,通过灌注骨料和加压注浆的方式充填巷道和采空区的空洞,实现顶板再造和水、瓦斯隐患的治理的双重目标,为下分层煤开采提供安全保障。
EXTRA-THICK COAL SEAM UPPER LAYER OLD GOAF ROOF RECONSTRUCTION METHOD AND CONSTRUCTION METHOD
PROCÉDÉ DE RECONSTRUCTION DE TOIT DE REMBLAI ANCIEN À COUCHE SUPÉRIEURE EXTRA-ÉPAISSE EN VEINE DE CHARBON ET PROCÉDÉ DE CONSTRUCTION
一种特厚煤层上分层老空区顶板再造方法及施工方法
ZHENG SHITIAN (author) / XING MAOLIN (author) / SHI ZHIYUAN (author) / JI YADONG (author) / WANG YUHANG (author) / CUI SIYUAN (author) / ZHENG SHUO (author) / LI KANGKANG (author)
2022-12-01
Patent
Electronic Resource
Chinese
EXTRA-THICK COAL SEAM UPPER LAYER OLD GOAF ROOF RECONSTRUCTION METHOD AND CONSTRUCTION METHOD