SHAPING FORMWORK FOR H-SHAPED STEEL BEAM BEING ENCASED IN CONCRETE, AND CONSTRUCTION METHOD
The present application provides a shaping formwork for a H-shaped steel beam being encased in concrete, and a construction method. The shaping formwork comprises: a first form board, a second form board, a third form board, a first connector and a second connector, wherein the first form board and the second form board are parallel to a web of an H-shaped steel beam, and the first form board and the second form board are detachably connected to each other; and the first connector connects the third form board and the H-shaped steel beam, and the second connector connects the second form board and a floor reinforcement mesh. In the shaping formwork for a H-shaped steel beam being encased in concrete provided in the present application, the first form board, the second form board, the third form board, the first connector and the second connector are connected in a fitted manner, the H-shaped steel beam is shaped and semi-encased, and a scaffold does not need to be built, such that construction is easy; the phenomenon of an encasing shaping effect being poor due to shaking of a scaffold is avoided, and the precision is high; and the first form board and the second form board are detachably connected to each other, such that segmented pouring can be conducted, concrete can be vibrated before a second section is poured, and a forming effect is ensured.
La présente demande concerne un coffrage de façonnage pour une poutre en acier en forme de H enrobée dans du béton, et un procédé de construction. Le coffrage de façonnage comprend : un premier panneau de forme, un deuxième panneau de forme, un troisième panneau de forme, un premier raccord et un second raccord, le premier panneau de forme et le deuxième panneau de forme étant parallèles à une bande d'une poutre d'acier en forme de H, et le premier panneau de forme et le deuxième panneau de forme étant reliés de façon détachable l'un à l'autre ; et le premier raccord relie le troisième panneau de forme et la poutre d'acier en forme de H, et le second raccord relie le deuxième panneau de forme et un treillis de renforcement de plancher. Dans le coffrage de façonnage pour une poutre en acier en forme de H qui est enrobée dans du béton fourni dans la présente demande, le premier panneau de forme, le deuxième panneau, le troisième panneau de forme, le premier raccord et le second raccord sont reliés de manière ajustée, la poutre d'acier en forme de H est façonné et semi-enrobé, et il n'est pas nécessaire de construire un échafaudage, de telle sorte que la construction est facile ; le phénomène d'effet de façonnage d'enrobage médiocre en raison du secouement d'un échafaudage est évité, et la précision est élevée ; et le premier panneau de forme et le deuxième panneau de forme sont raccordés de façon détachable l'un à l'autre, de telle sorte qu'une coulée segmentée peut être réalisée, du béton peut être amené à vibrer avant qu'une seconde section ne soit coulée, et un effet de mise en forme est assuré.
本申请提供的一种H型钢梁外包混凝土的定型模具及施工方法,包括:第一模板、第二模板、第三模板、第一连接以及第二连接件,第一模板以及第二模板与H型钢梁的腹板平行,第一模板与第二模板可拆卸连接;第一连接件连接第三模板与H型钢梁,第二连接件连接第二模板与楼板钢筋网。本申请提供的H型钢梁外包混凝土的定型模具,第一模板、第二模板、第三模板、第一连接件以及第二连接件进行配合连接,对H型钢梁进行定型化半外包,无需搭建脚手架,施工简单;不会出现因脚手架晃动、出现导致外包定型效果差的现象,精度高;第一模板与第二模板可拆卸连接,能够进行分段浇筑,浇筑第二段之前可以对混凝土进行振捣,保证成型效果。
SHAPING FORMWORK FOR H-SHAPED STEEL BEAM BEING ENCASED IN CONCRETE, AND CONSTRUCTION METHOD
The present application provides a shaping formwork for a H-shaped steel beam being encased in concrete, and a construction method. The shaping formwork comprises: a first form board, a second form board, a third form board, a first connector and a second connector, wherein the first form board and the second form board are parallel to a web of an H-shaped steel beam, and the first form board and the second form board are detachably connected to each other; and the first connector connects the third form board and the H-shaped steel beam, and the second connector connects the second form board and a floor reinforcement mesh. In the shaping formwork for a H-shaped steel beam being encased in concrete provided in the present application, the first form board, the second form board, the third form board, the first connector and the second connector are connected in a fitted manner, the H-shaped steel beam is shaped and semi-encased, and a scaffold does not need to be built, such that construction is easy; the phenomenon of an encasing shaping effect being poor due to shaking of a scaffold is avoided, and the precision is high; and the first form board and the second form board are detachably connected to each other, such that segmented pouring can be conducted, concrete can be vibrated before a second section is poured, and a forming effect is ensured.
La présente demande concerne un coffrage de façonnage pour une poutre en acier en forme de H enrobée dans du béton, et un procédé de construction. Le coffrage de façonnage comprend : un premier panneau de forme, un deuxième panneau de forme, un troisième panneau de forme, un premier raccord et un second raccord, le premier panneau de forme et le deuxième panneau de forme étant parallèles à une bande d'une poutre d'acier en forme de H, et le premier panneau de forme et le deuxième panneau de forme étant reliés de façon détachable l'un à l'autre ; et le premier raccord relie le troisième panneau de forme et la poutre d'acier en forme de H, et le second raccord relie le deuxième panneau de forme et un treillis de renforcement de plancher. Dans le coffrage de façonnage pour une poutre en acier en forme de H qui est enrobée dans du béton fourni dans la présente demande, le premier panneau de forme, le deuxième panneau, le troisième panneau de forme, le premier raccord et le second raccord sont reliés de manière ajustée, la poutre d'acier en forme de H est façonné et semi-enrobé, et il n'est pas nécessaire de construire un échafaudage, de telle sorte que la construction est facile ; le phénomène d'effet de façonnage d'enrobage médiocre en raison du secouement d'un échafaudage est évité, et la précision est élevée ; et le premier panneau de forme et le deuxième panneau de forme sont raccordés de façon détachable l'un à l'autre, de telle sorte qu'une coulée segmentée peut être réalisée, du béton peut être amené à vibrer avant qu'une seconde section ne soit coulée, et un effet de mise en forme est assuré.
本申请提供的一种H型钢梁外包混凝土的定型模具及施工方法,包括:第一模板、第二模板、第三模板、第一连接以及第二连接件,第一模板以及第二模板与H型钢梁的腹板平行,第一模板与第二模板可拆卸连接;第一连接件连接第三模板与H型钢梁,第二连接件连接第二模板与楼板钢筋网。本申请提供的H型钢梁外包混凝土的定型模具,第一模板、第二模板、第三模板、第一连接件以及第二连接件进行配合连接,对H型钢梁进行定型化半外包,无需搭建脚手架,施工简单;不会出现因脚手架晃动、出现导致外包定型效果差的现象,精度高;第一模板与第二模板可拆卸连接,能够进行分段浇筑,浇筑第二段之前可以对混凝土进行振捣,保证成型效果。
SHAPING FORMWORK FOR H-SHAPED STEEL BEAM BEING ENCASED IN CONCRETE, AND CONSTRUCTION METHOD
COFFRAGE DE FAÇONNAGE POUR POUTRE EN ACIER EN FORME DE H ENROBÉE DANS DU BÉTON, ET PROCÉDÉ DE CONSTRUCTION
一种H型钢梁外包混凝土的定型模具及施工方法
CHENG NENGMING (author) / CHANG MINGYUAN (author) / CHEN TAO (author) / MING YUNPENG (author) / ZHANG YU (author) / YU JIALIANG (author) / JI ZEHUA (author) / HUANG HANGBIN (author) / CAO LEI (author)
2022-12-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Arch bridge encased concrete top plate formwork construction method and top plate formwork thereof
European Patent Office | 2023
|Special-shaped steel-encased-concrete composite beam reinforcing structure
European Patent Office | 2024
|European Patent Office | 2022
|Reinforced skeleton arch bridge encased concrete formwork system and construction method thereof
European Patent Office | 2023
|Steel-encased concrete composite beam adopting U-shaped connecting pieces
European Patent Office | 2023
|