CONSTRUCTION METHOD FOR STEEL-CONCRETE MAIN GIRDER OF CABLE-STAYED BRIDGE
A construction method for a steel-concrete main girder of a cable-stayed bridge. The steel-concrete main girder is constructed in a multi-segmental manner. The construction method comprises the following steps: step 1, carrying out cast-in-place construction on a segment of concrete side main girder (1) on a main tower (100) and steel-concrete main girders on two sides of the main tower (100) by using a bracket (4); step 2, constructing the remaining midspan cantilever segments of steel-concrete main girders by using a front-pivot guyed form traveler (3); assembling a cantilever form traveler on the steel-concrete main girder, binding a steel bar, hoisting a steel cross beam (2), pouring concrete, applying a tensile prestress after the strength thereof reaches design requirements, and hoisting a bridge deck panel; step 3, moving the cantilever form traveler forward to the next segment, and repeating the construction process in step 2 to construct the next segment; step 4, constructing a side-span cast-in-place segment, using a floor support to construct the side-span cast-in-place segment, wherein the support uses a support scheme of a pile foundation and a Bailey beam; step 5, joining the side span; and step 6, joining the midspan. The construction method can ensure that the steel-concrete main girder has sufficient integrity and robustness, and can save construction time.
Procédé de construction pour une poutre principale en acier-béton d'un pont haubané. La poutre principale en acier-béton est construite de manière multi-segmentaire. Le procédé de construction comprend les étapes suivantes : étape 1, la réalisation d'une construction coulée sur place sur un segment de poutre principale côté béton (1) sur une tour principale (100) et des poutres principales en acier-béton sur deux côtés de la tour principale (100) à l'aide d'un support (4) ; étape 2, la construction des segments en porte-à-faux de travée centrale restants de poutres principales en acier-béton au moyen d'un curseur de coffrage haubané à pivot avant (3) ; l'assemblage d'un curseur de coffrage en porte-à-faux sur la poutre principale en acier-béton, la liaison d'une barre d'acier, le levage d'une traverse en acier (2), le déversement de béton, l'application d'une précontrainte de traction après que sa résistance atteint des exigences de conception, et le levage d'un panneau de tablier de pont ; étape 3, le déplacement du curseur de coffrage en porte-à-faux vers l'avant vers le segment suivant, et la répétition du processus de construction de l'étape 2 pour construire le segment suivant ; étape 4, la construction d'un segment coulé sur place de travée latérale, à l'aide d'un support de plancher pour construire le segment coulé sur place de travée latérale, le support utilisant un schéma de support d'une fondation de pieu et d'une poutrelle Bailey ; étape 5, la jonction de la travée latérale ; et étape 6, la jonction de la travée centrale. Le procédé de construction peut assurer que la poutre principale en acier-béton présente une intégrité et une robustesse suffisantes, et peut économiser du temps de construction.
一种斜拉桥钢混主梁的施工方法,钢混主梁分多节段进行施工,施工方法包括以下步骤:步骤1,在主塔(100)上的一节混凝土边主梁(1)以及主塔(100)两侧的钢混主梁采用托架(4)现浇施工;步骤2,跨中的其余悬臂节段的钢混主梁采用前支点牵索挂篮(3)施工;在钢混主梁上拼装悬臂挂篮,绑扎钢筋,吊装钢横梁(2),浇筑混凝土,其强度达到设计要求后张拉预应力,吊装桥面面板;步骤3,悬臂挂篮前移至下一节段,重复步骤2中施工工序,进行下一节段施工;步骤4,施工边跨现浇段,边跨现浇段采用落地支架进行施工,支架采用桩基础加贝雷梁的支架方案;步骤5,合龙边跨;步骤6,合龙中跨。该施工方法能够保证钢混主梁具有足够的完整性及牢固性,并节约施工时间。
CONSTRUCTION METHOD FOR STEEL-CONCRETE MAIN GIRDER OF CABLE-STAYED BRIDGE
A construction method for a steel-concrete main girder of a cable-stayed bridge. The steel-concrete main girder is constructed in a multi-segmental manner. The construction method comprises the following steps: step 1, carrying out cast-in-place construction on a segment of concrete side main girder (1) on a main tower (100) and steel-concrete main girders on two sides of the main tower (100) by using a bracket (4); step 2, constructing the remaining midspan cantilever segments of steel-concrete main girders by using a front-pivot guyed form traveler (3); assembling a cantilever form traveler on the steel-concrete main girder, binding a steel bar, hoisting a steel cross beam (2), pouring concrete, applying a tensile prestress after the strength thereof reaches design requirements, and hoisting a bridge deck panel; step 3, moving the cantilever form traveler forward to the next segment, and repeating the construction process in step 2 to construct the next segment; step 4, constructing a side-span cast-in-place segment, using a floor support to construct the side-span cast-in-place segment, wherein the support uses a support scheme of a pile foundation and a Bailey beam; step 5, joining the side span; and step 6, joining the midspan. The construction method can ensure that the steel-concrete main girder has sufficient integrity and robustness, and can save construction time.
Procédé de construction pour une poutre principale en acier-béton d'un pont haubané. La poutre principale en acier-béton est construite de manière multi-segmentaire. Le procédé de construction comprend les étapes suivantes : étape 1, la réalisation d'une construction coulée sur place sur un segment de poutre principale côté béton (1) sur une tour principale (100) et des poutres principales en acier-béton sur deux côtés de la tour principale (100) à l'aide d'un support (4) ; étape 2, la construction des segments en porte-à-faux de travée centrale restants de poutres principales en acier-béton au moyen d'un curseur de coffrage haubané à pivot avant (3) ; l'assemblage d'un curseur de coffrage en porte-à-faux sur la poutre principale en acier-béton, la liaison d'une barre d'acier, le levage d'une traverse en acier (2), le déversement de béton, l'application d'une précontrainte de traction après que sa résistance atteint des exigences de conception, et le levage d'un panneau de tablier de pont ; étape 3, le déplacement du curseur de coffrage en porte-à-faux vers l'avant vers le segment suivant, et la répétition du processus de construction de l'étape 2 pour construire le segment suivant ; étape 4, la construction d'un segment coulé sur place de travée latérale, à l'aide d'un support de plancher pour construire le segment coulé sur place de travée latérale, le support utilisant un schéma de support d'une fondation de pieu et d'une poutrelle Bailey ; étape 5, la jonction de la travée latérale ; et étape 6, la jonction de la travée centrale. Le procédé de construction peut assurer que la poutre principale en acier-béton présente une intégrité et une robustesse suffisantes, et peut économiser du temps de construction.
一种斜拉桥钢混主梁的施工方法,钢混主梁分多节段进行施工,施工方法包括以下步骤:步骤1,在主塔(100)上的一节混凝土边主梁(1)以及主塔(100)两侧的钢混主梁采用托架(4)现浇施工;步骤2,跨中的其余悬臂节段的钢混主梁采用前支点牵索挂篮(3)施工;在钢混主梁上拼装悬臂挂篮,绑扎钢筋,吊装钢横梁(2),浇筑混凝土,其强度达到设计要求后张拉预应力,吊装桥面面板;步骤3,悬臂挂篮前移至下一节段,重复步骤2中施工工序,进行下一节段施工;步骤4,施工边跨现浇段,边跨现浇段采用落地支架进行施工,支架采用桩基础加贝雷梁的支架方案;步骤5,合龙边跨;步骤6,合龙中跨。该施工方法能够保证钢混主梁具有足够的完整性及牢固性,并节约施工时间。
CONSTRUCTION METHOD FOR STEEL-CONCRETE MAIN GIRDER OF CABLE-STAYED BRIDGE
PROCÉDÉ DE CONSTRUCTION POUR UNE POUTRE PRINCIPALE EN ACIER-BÉTON D'UN PONT HAUBANÉ
一种斜拉桥钢混主梁的施工方法
HE HONGSHENG (author) / LI YONG (author) / WU DEHUA (author) / ZHANG JIESHENG (author) / WANG ANHUI (author) / LI WEIWEI (author) / ZHANG ZHAO (author) / WANG KUI (author) / DU CHENXI (author) / SU HAOCHUAN (author)
2023-02-16
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method of steel-concrete girder of cable-stayed bridge
European Patent Office | 2022
|Hoisting construction process for main bridge of cable-stayed steel box girder bridge
European Patent Office | 2024
|Construction method of girder of steel box girder cable-stayed bridge
European Patent Office | 2023
|Cable-stayed bridge steel-concrete composite girder mounting method
European Patent Office | 2023
|Cable-stayed bridge steel box girder pushing construction method
European Patent Office | 2020
|