CAISSON QUAY AND CONSTRUCTION METHOD THEREFOR
The present invention relates to the field of building construction, and in particular to a caisson quay and a construction method therefor. The caisson quay comprises a foundation bed, a plurality of caissons are arranged on the foundation bed, each caisson is provided with through holes in the length direction of the caisson, steel strands are arranged in the through holes and concrete is poured, and all the caissons are connected into a column by the steel strands to form an integral structure. According to the construction method for the caisson quay, after the caissons are manufactured, the steel strands are first used to penetrate through the through holes on the plurality of caissons to connect the plurality of caissons into one column to form the integral structure, and then the integral structure is transported to a construction site. According to the caisson quay structure and the construction method therefor provided in the present invention, the integral structure is towed to the construction site of the quay, such that all the caissons required for constructing the caisson quay can be transported to the construction site in only one transportation, thereby shortening the time of towing and transporting the caissons and improving the efficiency of towing and transporting the caissons; the caisson quay is installed in place after one transportation, such that the process is reduced and the construction period is short.
La présente invention se rapporte au domaine de la construction de bâtiments, et concerne en particulier un quai à caissons et un procédé de construction pour celui-ci. Le quai à caissons comprend un lit de fondation, une pluralité de caissons sont disposés sur le lit de fondation, chaque caisson comporte des trous traversants dans la direction de longueur du caisson, des torons en acier sont disposés dans les trous traversants et du béton est coulé, et tous les caissons sont reliés en une colonne par les torons en acier pour former une structure intégrale. Selon le procédé de construction du quai à caissons, après fabrication des caissons, les torons en acier sont d'abord utilisés pour pénétrer à travers les trous traversants sur la pluralité de caissons pour relier la pluralité de caissons en une colonne pour former la structure intégrale, puis la structure intégrale est transportée jusqu'à un site de construction. Pour la structure de quai à caissons et le procédé de construction pour celle-ci selon la présente invention, la structure intégrale est remorquée jusqu'au site de construction du quai, de telle sorte que tous les caissons nécessaires à la construction du quai à caissons peuvent être transportés jusqu'au site de construction en un seul transport, raccourcissant ainsi le temps de remorquage et de transport des caissons et améliorant l'efficacité de remorquage et de transport des caissons ; le quai à caissons est installé en place après un transport, de telle sorte que le processus est réduit et la durée de construction est courte.
本发明涉及建筑施工领域,具体涉及一种沉箱码头及其施工方法。沉箱码头包括基床,基床上设有多个沉箱,沉箱均设置有沿自身长度方向的通孔,通孔内设置有钢绞线并浇筑有混凝土,钢绞线将所有沉箱连成一列,形成整体结构。沉箱码头的施工方法在完成制造沉箱之后,先使用钢绞线穿入多个沉箱上的通孔,将多个沉箱连成一列,形成整体结构,再将整体结构运输至施工现场。本发明提供的沉箱码头结构及其施工方法通过将整体结构拖航至码头的施工现场,只需运输一次便能将建设沉箱码头所需的沉箱全部运输至施工处,缩短了拖航运输沉箱的时间,提高拖航运输沉箱的效率,沉箱码头一次运输安装就位,工序减少,工期短。
CAISSON QUAY AND CONSTRUCTION METHOD THEREFOR
The present invention relates to the field of building construction, and in particular to a caisson quay and a construction method therefor. The caisson quay comprises a foundation bed, a plurality of caissons are arranged on the foundation bed, each caisson is provided with through holes in the length direction of the caisson, steel strands are arranged in the through holes and concrete is poured, and all the caissons are connected into a column by the steel strands to form an integral structure. According to the construction method for the caisson quay, after the caissons are manufactured, the steel strands are first used to penetrate through the through holes on the plurality of caissons to connect the plurality of caissons into one column to form the integral structure, and then the integral structure is transported to a construction site. According to the caisson quay structure and the construction method therefor provided in the present invention, the integral structure is towed to the construction site of the quay, such that all the caissons required for constructing the caisson quay can be transported to the construction site in only one transportation, thereby shortening the time of towing and transporting the caissons and improving the efficiency of towing and transporting the caissons; the caisson quay is installed in place after one transportation, such that the process is reduced and the construction period is short.
La présente invention se rapporte au domaine de la construction de bâtiments, et concerne en particulier un quai à caissons et un procédé de construction pour celui-ci. Le quai à caissons comprend un lit de fondation, une pluralité de caissons sont disposés sur le lit de fondation, chaque caisson comporte des trous traversants dans la direction de longueur du caisson, des torons en acier sont disposés dans les trous traversants et du béton est coulé, et tous les caissons sont reliés en une colonne par les torons en acier pour former une structure intégrale. Selon le procédé de construction du quai à caissons, après fabrication des caissons, les torons en acier sont d'abord utilisés pour pénétrer à travers les trous traversants sur la pluralité de caissons pour relier la pluralité de caissons en une colonne pour former la structure intégrale, puis la structure intégrale est transportée jusqu'à un site de construction. Pour la structure de quai à caissons et le procédé de construction pour celle-ci selon la présente invention, la structure intégrale est remorquée jusqu'au site de construction du quai, de telle sorte que tous les caissons nécessaires à la construction du quai à caissons peuvent être transportés jusqu'au site de construction en un seul transport, raccourcissant ainsi le temps de remorquage et de transport des caissons et améliorant l'efficacité de remorquage et de transport des caissons ; le quai à caissons est installé en place après un transport, de telle sorte que le processus est réduit et la durée de construction est courte.
本发明涉及建筑施工领域,具体涉及一种沉箱码头及其施工方法。沉箱码头包括基床,基床上设有多个沉箱,沉箱均设置有沿自身长度方向的通孔,通孔内设置有钢绞线并浇筑有混凝土,钢绞线将所有沉箱连成一列,形成整体结构。沉箱码头的施工方法在完成制造沉箱之后,先使用钢绞线穿入多个沉箱上的通孔,将多个沉箱连成一列,形成整体结构,再将整体结构运输至施工现场。本发明提供的沉箱码头结构及其施工方法通过将整体结构拖航至码头的施工现场,只需运输一次便能将建设沉箱码头所需的沉箱全部运输至施工处,缩短了拖航运输沉箱的时间,提高拖航运输沉箱的效率,沉箱码头一次运输安装就位,工序减少,工期短。
CAISSON QUAY AND CONSTRUCTION METHOD THEREFOR
QUAI À CAISSONS ET PROCÉDÉ DE CONSTRUCTION POUR CELUI-CI
一种沉箱码头及其施工方法
JI TING (author) / FENG GANG (author) / MAI YAN (author) / LI HANBO (author) / ZHANG QING (author) / LUO BING (author) / YU QINGSHAN (author) / WU YUHENG (author) / DENG JUN (author) / LIU HUI (author)
2023-02-23
Patent
Electronic Resource
Chinese
Caisson-sinking at Plantation Quay, Glasgow
Engineering Index Backfile | 1935
|Performance of caisson type quay walls during earthquakes
British Library Conference Proceedings | 2002
|Deformation of caisson type quay wall during earthquake
British Library Conference Proceedings | 1998
|Quay Wall Caisson Vs. Counterfort Unit - A Perspective
British Library Conference Proceedings | 2001
|Performance of Caisson Type Quay Walls at Kobe Port
Online Contents | 1996
|