A platform for research: civil engineering, architecture and urbanism
POLE ERECTION METHOD
The purpose of the present invention is to provide a pole erection method making it possible to erect a utility pole efficiently and safely with a small number of workers even in a construction environment where heavy machinery cannot be used. The pole erection method according to the present invention is characterized by preparing a cylindrical structure 60 such that when the structure is erected perpendicularly to the ground with one end 60a at the bottom, an edge 61a at the other end 60b is higher than another edge 61b (step S01), burying the one end 60a of the structure 60 in the ground (step S02), placing a lower end 10a-1 of a utility pole 10a lying on the ground on the other edge 61b of the structure 60 (step S03), pressing the lower end portion of the utility pole against an inner wall 62 (step S04), and lifting an upper end portion 10a-2 of the utility pole 10a, with the other edge 61b as a fulcrum, while pressing the lower end portion 10a-1 of the utility pole 10a against the inner wall 62, and sliding the utility pole 10a into a cavity 63 of the structure 60 to erect the pole (step S05).
Le but de la présente invention est de fournir un procédé d'érection de poteau permettant d'ériger un poteau de service public de manière efficace et sûre avec un petit nombre de travailleurs, même dans un environnement de construction où une machinerie lourde ne peut pas être utilisée. Le procédé d'érection de poteau selon la présente invention est caractérisé en ce qu'il comprend les étapes suivantes consistant à préparer une structure cylindrique 60 de telle sorte que lorsque la structure est dressée perpendiculairement au sol avec une extrémité 60a au niveau du fond, un bord 61a à l'autre extrémité 60b est supérieur à un autre bord 61b (étape S01), à enfouir l'extrémité 60a de la structure 60 dans le sol (étape S02), à mettre en place une extrémité inférieure 10a-1 d'un poteau de service public 10a reposant sur le sol sur l'autre bord 61b de la structure 60 (étape S03), à presser la partie d'extrémité inférieure du poteau de service public contre une paroi interne 62 (étape S04), et à soulever une partie d'extrémité supérieure 10a -2 du poteau de service public 10a, avec l'autre bord 61b en tant que point d'appui, tout en pressant la partie d'extrémité inférieure 10a-1 du poteau de service public 10a contre la paroi interne 62, et en faisant coulisser le poteau de service public 10a dans une cavité 63 de la structure 60 pour ériger le poteau (étape S05).
本発明は、重機が使えない施工環境においても、少ない作業員で、効率よく、安全に電柱を建設することができる建柱方法を提供することを目的とする。 本発明に係る建柱方法は、円筒状であり、一端60aを下として地面に垂直に建てたとき、他端60bにおける一部の縁61aが他の縁61bより高くなる構造体60を用意すること(ステップS01)、構造体60の一端60aを地中に埋設すること(ステップS02)、前記地面に横倒しした電柱10aの下端部10a-1を、構造体60の他の縁61bに載せること(ステップS03)、前記電柱の前記下端部を内壁62に押しあてること(ステップS04)、及び電柱10aの下端部10a-1を内壁62に押しあてたまま、他の縁61bを支点として電柱10aの上端部10a-2を持ち上げ、電柱10aを構造体60の空洞部63に滑り落して建柱すること(ステップS05)を特徴とする。
POLE ERECTION METHOD
The purpose of the present invention is to provide a pole erection method making it possible to erect a utility pole efficiently and safely with a small number of workers even in a construction environment where heavy machinery cannot be used. The pole erection method according to the present invention is characterized by preparing a cylindrical structure 60 such that when the structure is erected perpendicularly to the ground with one end 60a at the bottom, an edge 61a at the other end 60b is higher than another edge 61b (step S01), burying the one end 60a of the structure 60 in the ground (step S02), placing a lower end 10a-1 of a utility pole 10a lying on the ground on the other edge 61b of the structure 60 (step S03), pressing the lower end portion of the utility pole against an inner wall 62 (step S04), and lifting an upper end portion 10a-2 of the utility pole 10a, with the other edge 61b as a fulcrum, while pressing the lower end portion 10a-1 of the utility pole 10a against the inner wall 62, and sliding the utility pole 10a into a cavity 63 of the structure 60 to erect the pole (step S05).
Le but de la présente invention est de fournir un procédé d'érection de poteau permettant d'ériger un poteau de service public de manière efficace et sûre avec un petit nombre de travailleurs, même dans un environnement de construction où une machinerie lourde ne peut pas être utilisée. Le procédé d'érection de poteau selon la présente invention est caractérisé en ce qu'il comprend les étapes suivantes consistant à préparer une structure cylindrique 60 de telle sorte que lorsque la structure est dressée perpendiculairement au sol avec une extrémité 60a au niveau du fond, un bord 61a à l'autre extrémité 60b est supérieur à un autre bord 61b (étape S01), à enfouir l'extrémité 60a de la structure 60 dans le sol (étape S02), à mettre en place une extrémité inférieure 10a-1 d'un poteau de service public 10a reposant sur le sol sur l'autre bord 61b de la structure 60 (étape S03), à presser la partie d'extrémité inférieure du poteau de service public contre une paroi interne 62 (étape S04), et à soulever une partie d'extrémité supérieure 10a -2 du poteau de service public 10a, avec l'autre bord 61b en tant que point d'appui, tout en pressant la partie d'extrémité inférieure 10a-1 du poteau de service public 10a contre la paroi interne 62, et en faisant coulisser le poteau de service public 10a dans une cavité 63 de la structure 60 pour ériger le poteau (étape S05).
本発明は、重機が使えない施工環境においても、少ない作業員で、効率よく、安全に電柱を建設することができる建柱方法を提供することを目的とする。 本発明に係る建柱方法は、円筒状であり、一端60aを下として地面に垂直に建てたとき、他端60bにおける一部の縁61aが他の縁61bより高くなる構造体60を用意すること(ステップS01)、構造体60の一端60aを地中に埋設すること(ステップS02)、前記地面に横倒しした電柱10aの下端部10a-1を、構造体60の他の縁61bに載せること(ステップS03)、前記電柱の前記下端部を内壁62に押しあてること(ステップS04)、及び電柱10aの下端部10a-1を内壁62に押しあてたまま、他の縁61bを支点として電柱10aの上端部10a-2を持ち上げ、電柱10aを構造体60の空洞部63に滑り落して建柱すること(ステップS05)を特徴とする。
POLE ERECTION METHOD
PROCÉDÉ D'ÉRECTION DE POTEAU
建柱方法
MOKI TATSUYA (author) / SATO YOSHIYASU (author) / KOKUBO WATARU (author) / HIROTA HIDENOBU (author) / INOUE KENJI (author)
2023-03-02
Patent
Electronic Resource
Japanese
Engineering Index Backfile | 1944