A platform for research: civil engineering, architecture and urbanism
Disclosed in the present invention is a dry type full-assembly industrial concrete shear wall vertical connection joint, comprising an upper part prefabricated concrete shear wall body, a lower part prefabricated concrete shear wall body, and a steel pipe concrete combined connecting piece. The upper part prefabricated concrete shear wall body and the lower part prefabricated concrete shear wall body are both composed of a steel bar framework and poured concrete. The steel pipe concrete combined connecting piece is composed of a plurality of basic independent connecting units, and each basic independent connecting unit comprises an upper connecting unit, a lower connecting unit, and a high-strength bolt connecting pair for connecting the upper connecting unit and the lower connecting unit. Further disclosed in the present invention is a manufacturing and installation method for the dry type full-assembly industrial concrete shear wall vertical connection joint. The vertical connection joint in the present invention conforms to the development trend of construction industrialization, and has the characteristics of simple structure, standard components, clear stress, flexible design, reliable performance, and easy maintenance and detachable features.
Est divulgué dans la présente invention un joint de raccordement vertical de mur de contreventement en béton industriel à assemblage complet de type sec, comprenant un corps de mur de contreventement en béton préfabriqué de partie supérieure, un corps de mur de contreventement en béton préfabriqué de partie inférieure, et une pièce de raccordement combinée en béton de tuyau d'acier. Le corps de mur de contreventement en béton préfabriqué de partie supérieure et le corps de mur de contreventement en béton préfabriqué de partie inférieure sont tous deux composés d'une ossature de barre d'acier et de béton coulé. La pièce de raccordement combinée en béton de tuyau d'acier est composée d'une pluralité d'unités de raccordement indépendantes de base, et chaque unité de raccordement indépendante de base comprend une unité de raccordement supérieure, une unité de raccordement inférieure et une paire de raccordement de boulon à haute résistance permettant de raccorder l'unité de raccordement supérieure et l'unité de raccordement inférieure. Est en ouvre divulgué dans la présente invention un procédé de fabrication et d'installation pour le joint de raccordement vertical de mur de contreventement en béton industriel à assemblage complet de type sec. Le joint de raccordement vertical selon la présente invention est conforme à la tendance au développement de l'industrialisation de construction, et présente les caractéristiques d'une structure simple, de composants standard, d'une contrainte nette, d'une conception flexible, de performances fiables et d'un entretien facile et d'éléments amovibles.
本发明公开了一种干式全装配工业化混凝土剪力墙竖向连接节点,包括上部预制混凝土剪力墙体、下部预制混凝土剪力墙体和钢管混凝土组合连接件;所述上部预制混凝土剪力墙体和下部预制混凝土剪力墙体均由钢筋骨架和浇筑混凝土构成;所述钢管混凝土组合连接件由多个基本独立连接单元构成,每一所述基本独立连接单元包括上部连接单元、下部连接单元、连接上部连接单元与下部连接单元的高强螺栓连接副,本发明还公开了一种干式全装配工业化混凝土剪力墙竖向连接节点的制造安装方法,本发明的干式全装配工业化混凝土剪力墙竖向连接节点符合建筑工业化发展趋势,具有结构简洁、组件规整、受力明确、设计灵活、性能可靠以及易维护和可拆卸的特征。
Disclosed in the present invention is a dry type full-assembly industrial concrete shear wall vertical connection joint, comprising an upper part prefabricated concrete shear wall body, a lower part prefabricated concrete shear wall body, and a steel pipe concrete combined connecting piece. The upper part prefabricated concrete shear wall body and the lower part prefabricated concrete shear wall body are both composed of a steel bar framework and poured concrete. The steel pipe concrete combined connecting piece is composed of a plurality of basic independent connecting units, and each basic independent connecting unit comprises an upper connecting unit, a lower connecting unit, and a high-strength bolt connecting pair for connecting the upper connecting unit and the lower connecting unit. Further disclosed in the present invention is a manufacturing and installation method for the dry type full-assembly industrial concrete shear wall vertical connection joint. The vertical connection joint in the present invention conforms to the development trend of construction industrialization, and has the characteristics of simple structure, standard components, clear stress, flexible design, reliable performance, and easy maintenance and detachable features.
Est divulgué dans la présente invention un joint de raccordement vertical de mur de contreventement en béton industriel à assemblage complet de type sec, comprenant un corps de mur de contreventement en béton préfabriqué de partie supérieure, un corps de mur de contreventement en béton préfabriqué de partie inférieure, et une pièce de raccordement combinée en béton de tuyau d'acier. Le corps de mur de contreventement en béton préfabriqué de partie supérieure et le corps de mur de contreventement en béton préfabriqué de partie inférieure sont tous deux composés d'une ossature de barre d'acier et de béton coulé. La pièce de raccordement combinée en béton de tuyau d'acier est composée d'une pluralité d'unités de raccordement indépendantes de base, et chaque unité de raccordement indépendante de base comprend une unité de raccordement supérieure, une unité de raccordement inférieure et une paire de raccordement de boulon à haute résistance permettant de raccorder l'unité de raccordement supérieure et l'unité de raccordement inférieure. Est en ouvre divulgué dans la présente invention un procédé de fabrication et d'installation pour le joint de raccordement vertical de mur de contreventement en béton industriel à assemblage complet de type sec. Le joint de raccordement vertical selon la présente invention est conforme à la tendance au développement de l'industrialisation de construction, et présente les caractéristiques d'une structure simple, de composants standard, d'une contrainte nette, d'une conception flexible, de performances fiables et d'un entretien facile et d'éléments amovibles.
本发明公开了一种干式全装配工业化混凝土剪力墙竖向连接节点,包括上部预制混凝土剪力墙体、下部预制混凝土剪力墙体和钢管混凝土组合连接件;所述上部预制混凝土剪力墙体和下部预制混凝土剪力墙体均由钢筋骨架和浇筑混凝土构成;所述钢管混凝土组合连接件由多个基本独立连接单元构成,每一所述基本独立连接单元包括上部连接单元、下部连接单元、连接上部连接单元与下部连接单元的高强螺栓连接副,本发明还公开了一种干式全装配工业化混凝土剪力墙竖向连接节点的制造安装方法,本发明的干式全装配工业化混凝土剪力墙竖向连接节点符合建筑工业化发展趋势,具有结构简洁、组件规整、受力明确、设计灵活、性能可靠以及易维护和可拆卸的特征。
CONCRETE SHEAR WALL VERTICAL CONNECTION JOINT AND MANUFACTURING AND INSTALLATION METHOD THEREFOR
JOINT DE RACCORDEMENT VERTICAL DE MUR DE CONTREVENTEMENT EN BÉTON ET SON PROCÉDÉ DE FABRICATION ET D'INSTALLATION
混凝土剪力墙竖向连接节点及其制造安装方法
2023-04-06
Patent
Electronic Resource
Chinese
Fabricated concrete shear wall vertical connection joint and construction method
European Patent Office | 2022
|Steel-concrete unit, shear wall vertical connection system and shear wall vertical connection method
European Patent Office | 2024
|Fully-fabricated concrete shear wall vertical connection joint (and construction method)
European Patent Office | 2023
|European Patent Office | 2021
|