IMMERSED TUBE FLOATING-STATE BARGE-UP METHOD
The present invention relates to the technical field of immersed tube transportation. Disclosed is an immersed tube floating-state barge-up method, comprising the following steps: A, constructing a bottom-mounted region of a semi-submersible barge, and arranging a buttress system on the semi-submersible barge; B, operating the semi-submersible barge to dive to the bottom-mounted region, and enabling the immersed tube to float in a dry dock; C, after the semi-submersible barge sits on the bottom, transporting the immersed tube to the position directly above the buttress system in a floating mode; and D, positioning and mooring the semi-submersible barge and the immersed tube, operating the semi-submersible barge to perform water displacement and float, supporting the immersed tube by the buttress system, supporting the immersed tube out of the water surface, and completing the barge-up of the immersed tube. According to the immersed tube floating-state barge-up method of the present invention, the barge-up of the immersed tube can be completed by means of floating transportation, the site limitation of constructing a barge-up wharf is avoided, performing transportation by means of the barge-up wharf, a rail, and a trolley is not needed, the barge-up operation of the immersed tube is simple, and the construction cost is controlled.
La présente invention concerne le domaine technique du transport à tube immergé. L'invention concerne un procédé de mise à l'eau d'une barge flottante à tube immergé, comprenant les étapes suivantes consistant à : A, construire une région montée au fond d'une barge semi-submersible, et agencer un système de renfort sur la barge semi-submersible ; B, faire fonctionner la barge semi-submersible pour plonger dans la région montée au fond, et permettre au tube immergé de flotter dans une station d'accueil sèche ; C, après que la barge semi-submersible repose sur le fond, transporter le tube immergé jusqu'à la position directement au-dessus du système de renfort dans un mode flottant ; et D, positionner et amarrer la barge semi-submersible et le tube immergé, faire fonctionner la barge semi-submersible pour effectuer un déplacement d'eau et flotter, supporter le tube immergé par le système de renfort, supporter le tube immergé hors de la surface de l'eau, et achever la barge à tube immergé. Selon le procédé de mise à l'eau d'une barge flottante à tube immergé de la présente invention, la barge à tube immergé peut être complétée au moyen d'un transport flottant, la limitation de site de construction d'un quai de barge est évitée, la réalisation d'un transport au moyen du quai de barge, d'un rail et d'un chariot n'est pas nécessaire, l'opération de barge à tube immergé est simple, et le coût de construction est contrôlé.
本发明涉及沉管运输技术领域,公开了一种沉管浮态上驳的方法,包括如下步骤:A、施作半潜驳下潜的坐底区,并在半潜驳上设置支墩系统;B、操作半潜驳下潜坐底,将沉管在干坞内起浮;C、半潜驳坐底后,将沉管浮运至支墩系统的正上方;D、将半潜驳与沉管定位系泊,操作半潜驳排水起浮,支墩系统支撑沉管,将沉管托出水面,完成沉管的上驳工作。本发明的一种沉管浮态上驳的方法,能够通过浮运完成沉管的上驳,避免受到建设上驳码头的场地限制,无需依靠上驳码头、轨道和台车进行运输,沉管上驳的操作简单,同时控制了施工成本。
IMMERSED TUBE FLOATING-STATE BARGE-UP METHOD
The present invention relates to the technical field of immersed tube transportation. Disclosed is an immersed tube floating-state barge-up method, comprising the following steps: A, constructing a bottom-mounted region of a semi-submersible barge, and arranging a buttress system on the semi-submersible barge; B, operating the semi-submersible barge to dive to the bottom-mounted region, and enabling the immersed tube to float in a dry dock; C, after the semi-submersible barge sits on the bottom, transporting the immersed tube to the position directly above the buttress system in a floating mode; and D, positioning and mooring the semi-submersible barge and the immersed tube, operating the semi-submersible barge to perform water displacement and float, supporting the immersed tube by the buttress system, supporting the immersed tube out of the water surface, and completing the barge-up of the immersed tube. According to the immersed tube floating-state barge-up method of the present invention, the barge-up of the immersed tube can be completed by means of floating transportation, the site limitation of constructing a barge-up wharf is avoided, performing transportation by means of the barge-up wharf, a rail, and a trolley is not needed, the barge-up operation of the immersed tube is simple, and the construction cost is controlled.
La présente invention concerne le domaine technique du transport à tube immergé. L'invention concerne un procédé de mise à l'eau d'une barge flottante à tube immergé, comprenant les étapes suivantes consistant à : A, construire une région montée au fond d'une barge semi-submersible, et agencer un système de renfort sur la barge semi-submersible ; B, faire fonctionner la barge semi-submersible pour plonger dans la région montée au fond, et permettre au tube immergé de flotter dans une station d'accueil sèche ; C, après que la barge semi-submersible repose sur le fond, transporter le tube immergé jusqu'à la position directement au-dessus du système de renfort dans un mode flottant ; et D, positionner et amarrer la barge semi-submersible et le tube immergé, faire fonctionner la barge semi-submersible pour effectuer un déplacement d'eau et flotter, supporter le tube immergé par le système de renfort, supporter le tube immergé hors de la surface de l'eau, et achever la barge à tube immergé. Selon le procédé de mise à l'eau d'une barge flottante à tube immergé de la présente invention, la barge à tube immergé peut être complétée au moyen d'un transport flottant, la limitation de site de construction d'un quai de barge est évitée, la réalisation d'un transport au moyen du quai de barge, d'un rail et d'un chariot n'est pas nécessaire, l'opération de barge à tube immergé est simple, et le coût de construction est contrôlé.
本发明涉及沉管运输技术领域,公开了一种沉管浮态上驳的方法,包括如下步骤:A、施作半潜驳下潜的坐底区,并在半潜驳上设置支墩系统;B、操作半潜驳下潜坐底,将沉管在干坞内起浮;C、半潜驳坐底后,将沉管浮运至支墩系统的正上方;D、将半潜驳与沉管定位系泊,操作半潜驳排水起浮,支墩系统支撑沉管,将沉管托出水面,完成沉管的上驳工作。本发明的一种沉管浮态上驳的方法,能够通过浮运完成沉管的上驳,避免受到建设上驳码头的场地限制,无需依靠上驳码头、轨道和台车进行运输,沉管上驳的操作简单,同时控制了施工成本。
IMMERSED TUBE FLOATING-STATE BARGE-UP METHOD
PROCÉDÉ DE MISE À L'EAU D'UNE BARGE FLOTTANTE À TUBE IMMERGÉ
一种沉管浮态上驳的方法
ZHU CHENG (author) / LIU XUANYUAN (author) / OU WEISHAN (author) / DAI SHUANGQUAN (author) / PENG GANG (author) / CHEN JIANBIN (author) / ZHANG TAO (author) / ZOU ZHENGZHOU (author) / XU ZEGUI (author) / CHEN CHONG (author)
2023-04-20
Patent
Electronic Resource
Chinese
Immersion barge and immersed tube floating transportation method
European Patent Office | 2023
|Immersed tube joint SPMT vehicle floating-state barge-up construction method
European Patent Office | 2024
|Assembling method of combined immersed tube immersion barge
European Patent Office | 2023
|European Patent Office | 2023