A platform for research: civil engineering, architecture and urbanism
ESTIMATION MODEL ACQUIRING DEVICE, RIVER FLOW RATE ESTIMATING DEVICE, ESTIMATION MODEL PRODUCTION METHOD, RIVER FLOW RATE ESTIMATING METHOD, AND PROGRAM
[Problem] There is a need to enable conventional estimation model generating devices to be capable of estimating information relating to a flow rate of a target river. [Solution] Information relating to the flow rate of a river of interest can be estimated by means of an estimation model generating device 101 comprising: a drainage basin data acquiring unit 142 for acquiring drainage basin data of a drainage basin of a river of interest, from an image including the drainage basin; a candidate model acquiring unit 143 for acquiring one or more candidate models for estimating information relating to the flow rate of the river, on the basis of the drainage basin data; a verifying unit 145 for verifying the validity of at least one candidate model from among the one or more candidate models, using verification data; an estimation model acquiring unit 147 for acquiring one candidate model from among the one or more candidate models as an estimation model, on the basis of the results of the verification; and a model accumulating unit 149 for accumulating the acquired estimation model.
[Problème] Il est nécessaire de permettre à des dispositifs de génération de modèle d'estimation classiques d'estimer des informations relatives à un débit d'un cours d'eau cible. [Solution] Des informations relatives au débit d'un cours d'eau d'intérêt peuvent être estimées au moyen d'un dispositif de génération de modèle d'estimation 101 comprenant : une unité d'acquisition de données de bassin de drainage 142 pour acquérir des données de bassin de drainage d'un bassin de drainage d'un cours d'eau d'intérêt, à partir d'une image comprenant le bassin de drainage ; une unité d'acquisition de modèle candidat 143 pour acquérir un ou plusieurs modèles candidats pour estimer des informations relatives au débit du cours d'eau, sur la base des données de bassin de drainage ; une unité de vérification 145 pour vérifier la validité d'au moins un modèle candidat parmi le ou les modèles candidats, en utilisant des données de vérification ; une unité d'acquisition de modèle d'estimation 147 pour acquérir un modèle candidat parmi le ou les modèles candidats comme modèle d'estimation, sur la base des résultats de la vérification ; et une unité d'accumulation de modèle 149 pour accumuler le modèle d'estimation acquis.
【課題】従来の推定モデル生成装置においては、対象河川の流量に関する情報を推定できるようにすることが求められているという課題があった。 【解決手段】対象とする河川の流域が含まれる画像から流域の流域データを取得する流域データ取得部142と、流域データに基づいて河川の流量に関する情報を推定するための1以上の候補モデルを取得する候補モデル取得部143と、検証用データを用いて1以上の候補モデルのうち少なくとも1つの候補モデルの妥当性を検証する検証部145と、検証結果に基づいて1以上の候補モデルのうち一の候補モデルを推定モデルとして取得する推定モデル取得部147と、取得した推定モデルを蓄積するモデル蓄積部149とを備える、推定モデル生成装置101により、対象河川の流量に関する情報を推定することができる。
ESTIMATION MODEL ACQUIRING DEVICE, RIVER FLOW RATE ESTIMATING DEVICE, ESTIMATION MODEL PRODUCTION METHOD, RIVER FLOW RATE ESTIMATING METHOD, AND PROGRAM
[Problem] There is a need to enable conventional estimation model generating devices to be capable of estimating information relating to a flow rate of a target river. [Solution] Information relating to the flow rate of a river of interest can be estimated by means of an estimation model generating device 101 comprising: a drainage basin data acquiring unit 142 for acquiring drainage basin data of a drainage basin of a river of interest, from an image including the drainage basin; a candidate model acquiring unit 143 for acquiring one or more candidate models for estimating information relating to the flow rate of the river, on the basis of the drainage basin data; a verifying unit 145 for verifying the validity of at least one candidate model from among the one or more candidate models, using verification data; an estimation model acquiring unit 147 for acquiring one candidate model from among the one or more candidate models as an estimation model, on the basis of the results of the verification; and a model accumulating unit 149 for accumulating the acquired estimation model.
[Problème] Il est nécessaire de permettre à des dispositifs de génération de modèle d'estimation classiques d'estimer des informations relatives à un débit d'un cours d'eau cible. [Solution] Des informations relatives au débit d'un cours d'eau d'intérêt peuvent être estimées au moyen d'un dispositif de génération de modèle d'estimation 101 comprenant : une unité d'acquisition de données de bassin de drainage 142 pour acquérir des données de bassin de drainage d'un bassin de drainage d'un cours d'eau d'intérêt, à partir d'une image comprenant le bassin de drainage ; une unité d'acquisition de modèle candidat 143 pour acquérir un ou plusieurs modèles candidats pour estimer des informations relatives au débit du cours d'eau, sur la base des données de bassin de drainage ; une unité de vérification 145 pour vérifier la validité d'au moins un modèle candidat parmi le ou les modèles candidats, en utilisant des données de vérification ; une unité d'acquisition de modèle d'estimation 147 pour acquérir un modèle candidat parmi le ou les modèles candidats comme modèle d'estimation, sur la base des résultats de la vérification ; et une unité d'accumulation de modèle 149 pour accumuler le modèle d'estimation acquis.
【課題】従来の推定モデル生成装置においては、対象河川の流量に関する情報を推定できるようにすることが求められているという課題があった。 【解決手段】対象とする河川の流域が含まれる画像から流域の流域データを取得する流域データ取得部142と、流域データに基づいて河川の流量に関する情報を推定するための1以上の候補モデルを取得する候補モデル取得部143と、検証用データを用いて1以上の候補モデルのうち少なくとも1つの候補モデルの妥当性を検証する検証部145と、検証結果に基づいて1以上の候補モデルのうち一の候補モデルを推定モデルとして取得する推定モデル取得部147と、取得した推定モデルを蓄積するモデル蓄積部149とを備える、推定モデル生成装置101により、対象河川の流量に関する情報を推定することができる。
ESTIMATION MODEL ACQUIRING DEVICE, RIVER FLOW RATE ESTIMATING DEVICE, ESTIMATION MODEL PRODUCTION METHOD, RIVER FLOW RATE ESTIMATING METHOD, AND PROGRAM
DISPOSITIF D'ACQUISITION DE MODÈLE D'ESTIMATION, DISPOSITIF D'ESTIMATION DE DÉBIT DE COURS D'EAU, PROCÉDÉ DE PRODUCTION DE MODÈLE D'ESTIMATION, PROCÉDÉ D'ESTIMATION DE DÉBIT DE COURS D'EAU ET PROGRAMME
推定モデル取得装置、河川流量推定装置、推定モデルの製造方法、河川流量推定方法、及びプログラム
GOTO NOZOMI (author) / YANO SHINJIRO (author) / KUDO KEISHI (author) / ARAI KAORI (author)
2023-04-20
Patent
Electronic Resource
Japanese
IPC:
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
G05B
Steuer- oder Regelsysteme allgemein
,
CONTROL OR REGULATING SYSTEMS IN GENERAL
European Patent Office | 2024
|European Patent Office | 2024
|