A platform for research: civil engineering, architecture and urbanism
A roof beam is shown for a temporary building in which the beam comprises a first elongate member and a second elongate member, each comprising a box section with a hollow centre having a length, a width and a depth. The first elongate member is provided at each of two adjacent corners of its box section with a first connector extending lengthwise and comprising a channel closed off from the hollow centre of the first elongate member and open outwards through a neck narrower than the channel. The second elongate member has at each of two adjacent corners of its box section a second connector extending lengthwise and comprising a rib projecting through the neck of a complementary first connector and a flange on the rib held within the channel of the complementary first connector. In addition, the first elongate member and the second elongate member are respectively configured and arranged so that the first and second connector interconnect, with the second connector being a close fit within the first connector, whereby the first and second elongate members are coupled together to form the roof beam.
Une poutre de toit est représentée pour un bâtiment temporaire dans lequel la poutre comprend un premier élément allongé et un second élément allongé, comprenant chacun une section de boîte avec un centre creux présentant une longueur, une largeur et une profondeur. Le premier élément allongé est disposé au niveau de chacun de deux coins adjacents de sa section de boîte avec une première liaison s'étendant dans le sens de la longueur et comprenant un canal fermé à partir du centre creux du premier élément allongé et ouvert vers l'extérieur à travers un col plus étroit que le canal. Le second élément allongé présente au niveau de chacun de deux coins adjacents de sa section de boîte une seconde liaison s'étendant dans le sens de la longueur et comprenant une nervure faisant saillie à travers le col d'une première liaison complémentaire et une bride sur la nervure maintenue à l'intérieur du canal de la première liaison complémentaire. De plus, le premier élément allongé et le second élément allongé sont respectivement conçus et agencés de sorte que les première et seconde liaisons se relient entre elles, la seconde liaison étant un ajustement serré à l'intérieur de la première liaison, les premier et second éléments allongés étant accouplés l'un à l'autre pour former la poutre de toit.
A roof beam is shown for a temporary building in which the beam comprises a first elongate member and a second elongate member, each comprising a box section with a hollow centre having a length, a width and a depth. The first elongate member is provided at each of two adjacent corners of its box section with a first connector extending lengthwise and comprising a channel closed off from the hollow centre of the first elongate member and open outwards through a neck narrower than the channel. The second elongate member has at each of two adjacent corners of its box section a second connector extending lengthwise and comprising a rib projecting through the neck of a complementary first connector and a flange on the rib held within the channel of the complementary first connector. In addition, the first elongate member and the second elongate member are respectively configured and arranged so that the first and second connector interconnect, with the second connector being a close fit within the first connector, whereby the first and second elongate members are coupled together to form the roof beam.
Une poutre de toit est représentée pour un bâtiment temporaire dans lequel la poutre comprend un premier élément allongé et un second élément allongé, comprenant chacun une section de boîte avec un centre creux présentant une longueur, une largeur et une profondeur. Le premier élément allongé est disposé au niveau de chacun de deux coins adjacents de sa section de boîte avec une première liaison s'étendant dans le sens de la longueur et comprenant un canal fermé à partir du centre creux du premier élément allongé et ouvert vers l'extérieur à travers un col plus étroit que le canal. Le second élément allongé présente au niveau de chacun de deux coins adjacents de sa section de boîte une seconde liaison s'étendant dans le sens de la longueur et comprenant une nervure faisant saillie à travers le col d'une première liaison complémentaire et une bride sur la nervure maintenue à l'intérieur du canal de la première liaison complémentaire. De plus, le premier élément allongé et le second élément allongé sont respectivement conçus et agencés de sorte que les première et seconde liaisons se relient entre elles, la seconde liaison étant un ajustement serré à l'intérieur de la première liaison, les premier et second éléments allongés étant accouplés l'un à l'autre pour former la poutre de toit.
ROOFING STRUCTURE
STRUCTURE DE TOITURE
TABB DAVID BRYAN (author)
2023-06-08
Patent
Electronic Resource
English
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Metal roofing material, and roofing structure and roofing method using same
European Patent Office | 2017
|European Patent Office | 2020
|