CONSTRUCTION OPERATION METHOD AND SYSTEM FOR OUTER CURTAIN WALLS OF HIGH-ALTITUDE LARGE-SPAN BUILDING CORRIDOR
A construction operation method and system for outer curtain walls of a high-altitude large-span building corridor. A truss (1) is supported and fitted on rails (19) on two sides by means of bottom locomotion mechanisms (2); winches (9) and cantilevers (4) are arranged on two sides of the top of the truss (1); guide wheel systems (3) for installing hoisting ropes (5) and guide wheel systems (3) for installing transfer ropes (10) are arranged on the cantilevers (4); the transfer ropes (10) are driven by the winches (9); hoisting machines (6) drive, by means of the hoisting ropes (5), a hoisting construction platform (7) to rise to a position in the vicinity of the bottom of a corridor, a longitudinal bottom construction hanging rope (8) is arranged in the vicinity of the bottom of the corridor, and a safety rope is hung on the bottom construction hanging rope (8) for bottom suspended ceiling construction of the corridor; the hoisting machine (6) on a hanging basket (13) drives, by means of the hoisting rope (5), the hanging basket (13) to rise to a side of the corridor, and the safety rope is connected to a side construction hanging rope for side curtain wall construction of the corridor; and construction materials are transferred back and forth between the ground and a construction area by means of the transfer ropes (10) driven by the winch (9) on the side where the construction materials are located. According to the method, integrated construction of bottom suspended ceilings and side curtain walls is achieved, and material transfer and installation construction are achieved by constructors without returning to the ground.
Procédé et système de fonctionnement de construction pour murs-rideaux externes d'un couloir de construction de grande portée à haute altitude. Une ferme (1) est supportée et montée sur des rails (19) sur deux côtés au moyen de mécanismes de locomotion inférieurs (2) ; des treuils (9) et des porte-à-faux (4) sont disposés sur deux côtés de la partie supérieure de la ferme (1) ; des systèmes de roue de guidage (3) pour installer des câbles de levage (5) et des systèmes de roue de guidage (3) pour installer des câbles de transfert (10) sont disposés sur les porte-à-faux (4) ; les câbles de transfert (10) sont entraînés par les treuils (9) ; des machines de levage (6) entraînent, au moyen des câbles de levage (5), la montée d'une plateforme de construction de levage (7) dans une position à proximité du fond d'un couloir, un câble de suspension de construction inférieure longitudinale (8) est disposé à proximité du fond du couloir, et un câble de sécurité est suspendu sur le câble de suspension de construction inférieure (8) pour la construction de plafond suspendu inférieur du couloir ; la machine de levage (6) sur un panier de suspension (13) entraîne, au moyen du câble de levage (5), la montée du panier de suspension (13) sur un côté du couloir, et le câble de sécurité est relié à un câble de suspension de construction latérale pour la construction de mur-rideau latéral du couloir ; et des matériaux de construction sont transférés en va-et-vient entre le sol et une zone de construction au moyen des câbles de transfert (10) entraînés par le treuil (9) sur le côté où les matériaux de construction sont situés. Selon le procédé, une construction intégrée de plafonds suspendus inférieurs et de murs-rideaux latéraux est obtenue, et une construction de transfert de matériau et d'installation est obtenue par des constructeurs sans retourner au sol.
一种高空大跨度建筑连廊外幕墙施工作业方法及系统,桁架(1)通过底部行走机构(2)支撑配合在两侧轨道(19)上,桁架(1)顶部两侧均设有卷扬机(9)和悬臂(4),悬臂(4)上均设有安装提升绳(5)的导向轮系(3)和安装转运绳(10)的导向轮系(3),转运绳(10)由卷扬机(9)驱动;提升机(6)通过提升绳(5)带动吊装施工平台(7)上升至连廊底部附近,连廊底部附近设有纵向的底部施工挂绳(8),将安全绳挂在底部施工挂绳(8)上进行连廊底部吊顶施工;吊篮(13)上的提升机(6)通过提升绳(5)带动吊篮(13)上升至连廊侧面,将安全绳与侧面施工挂绳连接进行连廊侧面幕墙施工,施工材料通过所在侧的卷扬机(9)驱动转运绳(10)在地面与施工区域之间来回转运获得。该方法实现了底部吊顶和侧面幕墙的一体化施工、施工人员不落地状态下材料转运和安装施工。
CONSTRUCTION OPERATION METHOD AND SYSTEM FOR OUTER CURTAIN WALLS OF HIGH-ALTITUDE LARGE-SPAN BUILDING CORRIDOR
A construction operation method and system for outer curtain walls of a high-altitude large-span building corridor. A truss (1) is supported and fitted on rails (19) on two sides by means of bottom locomotion mechanisms (2); winches (9) and cantilevers (4) are arranged on two sides of the top of the truss (1); guide wheel systems (3) for installing hoisting ropes (5) and guide wheel systems (3) for installing transfer ropes (10) are arranged on the cantilevers (4); the transfer ropes (10) are driven by the winches (9); hoisting machines (6) drive, by means of the hoisting ropes (5), a hoisting construction platform (7) to rise to a position in the vicinity of the bottom of a corridor, a longitudinal bottom construction hanging rope (8) is arranged in the vicinity of the bottom of the corridor, and a safety rope is hung on the bottom construction hanging rope (8) for bottom suspended ceiling construction of the corridor; the hoisting machine (6) on a hanging basket (13) drives, by means of the hoisting rope (5), the hanging basket (13) to rise to a side of the corridor, and the safety rope is connected to a side construction hanging rope for side curtain wall construction of the corridor; and construction materials are transferred back and forth between the ground and a construction area by means of the transfer ropes (10) driven by the winch (9) on the side where the construction materials are located. According to the method, integrated construction of bottom suspended ceilings and side curtain walls is achieved, and material transfer and installation construction are achieved by constructors without returning to the ground.
Procédé et système de fonctionnement de construction pour murs-rideaux externes d'un couloir de construction de grande portée à haute altitude. Une ferme (1) est supportée et montée sur des rails (19) sur deux côtés au moyen de mécanismes de locomotion inférieurs (2) ; des treuils (9) et des porte-à-faux (4) sont disposés sur deux côtés de la partie supérieure de la ferme (1) ; des systèmes de roue de guidage (3) pour installer des câbles de levage (5) et des systèmes de roue de guidage (3) pour installer des câbles de transfert (10) sont disposés sur les porte-à-faux (4) ; les câbles de transfert (10) sont entraînés par les treuils (9) ; des machines de levage (6) entraînent, au moyen des câbles de levage (5), la montée d'une plateforme de construction de levage (7) dans une position à proximité du fond d'un couloir, un câble de suspension de construction inférieure longitudinale (8) est disposé à proximité du fond du couloir, et un câble de sécurité est suspendu sur le câble de suspension de construction inférieure (8) pour la construction de plafond suspendu inférieur du couloir ; la machine de levage (6) sur un panier de suspension (13) entraîne, au moyen du câble de levage (5), la montée du panier de suspension (13) sur un côté du couloir, et le câble de sécurité est relié à un câble de suspension de construction latérale pour la construction de mur-rideau latéral du couloir ; et des matériaux de construction sont transférés en va-et-vient entre le sol et une zone de construction au moyen des câbles de transfert (10) entraînés par le treuil (9) sur le côté où les matériaux de construction sont situés. Selon le procédé, une construction intégrée de plafonds suspendus inférieurs et de murs-rideaux latéraux est obtenue, et une construction de transfert de matériau et d'installation est obtenue par des constructeurs sans retourner au sol.
一种高空大跨度建筑连廊外幕墙施工作业方法及系统,桁架(1)通过底部行走机构(2)支撑配合在两侧轨道(19)上,桁架(1)顶部两侧均设有卷扬机(9)和悬臂(4),悬臂(4)上均设有安装提升绳(5)的导向轮系(3)和安装转运绳(10)的导向轮系(3),转运绳(10)由卷扬机(9)驱动;提升机(6)通过提升绳(5)带动吊装施工平台(7)上升至连廊底部附近,连廊底部附近设有纵向的底部施工挂绳(8),将安全绳挂在底部施工挂绳(8)上进行连廊底部吊顶施工;吊篮(13)上的提升机(6)通过提升绳(5)带动吊篮(13)上升至连廊侧面,将安全绳与侧面施工挂绳连接进行连廊侧面幕墙施工,施工材料通过所在侧的卷扬机(9)驱动转运绳(10)在地面与施工区域之间来回转运获得。该方法实现了底部吊顶和侧面幕墙的一体化施工、施工人员不落地状态下材料转运和安装施工。
CONSTRUCTION OPERATION METHOD AND SYSTEM FOR OUTER CURTAIN WALLS OF HIGH-ALTITUDE LARGE-SPAN BUILDING CORRIDOR
PROCÉDÉ ET SYSTÈME DE FONCTIONNEMENT DE CONSTRUCTION POUR MURS-RIDEAUX EXTERNES DE COULOIR DE CONSTRUCTION DE GRANDE PORTÉE À HAUTE ALTITUDE
高空大跨度建筑连廊外幕墙施工作业方法及系统
ZHANG BO (author) / LI LING (author) / XU SHIJIE (author) / HU XIAOGUANG (author) / WANG HUOHUA (author) / LIU JUNFENG (author) / XU XIAOQIN (author) / PENG KUN (author) / SU PEIJUN (author) / DAI WANTING (author)
2023-10-26
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|Large-span high-altitude corridor curtain wall construction operation platform
European Patent Office | 2023
|Installation and construction method for high-altitude large-span steel corridor curtain wall
European Patent Office | 2021
|Splicing construction method for high-altitude large-span steel structure corridor
European Patent Office | 2024
|High-altitude large-span steel structure corridor and lifting construction method thereof
European Patent Office | 2022
|