A platform for research: civil engineering, architecture and urbanism
DRUM JOINT INSTALLATION METHOD, STEEL RETICULATED SHELL, AND ASSEMBLY UNIT CONSTRUCTION METHOD
A drum joint (2) installation method, a steel reticulated shell, and an assembly unit construction method. The method comprises: firstly locating the projection point of the central point of the lower surface of the drum joint (4) on the ground, and installing a vertical jig frame (6); then locating the projection point of the central point of the lower surface of the drum joint (4) on the top surface of the vertical jig frame (6), and welding a central positioning rib (8); placing the central point of the lower surface of an auxiliary drum joint on the central positioning rib (8), rotating the auxiliary drum joint such that the spatial position of the upper surface of the auxiliary drum joint overlaps with the spatial position of the drum joint, and welding the positioning rebar (3) on the vertical jig frame (6); replacing the auxiliary drum joint with the drum joint (2), and welding and fixing the drum node (2) and the positioning rebar (3). The drum joint (2) can be quickly positioned by firstly locating the drum joint (2) by means of the auxiliary drum joint and then replacing the auxiliary drum joint with the drum joint (2). The drum joint (2) can be accurately positioned by locating the projection point of the central point of the top surface of the drum joint (4) and transforming the projction point by using the positioning rebar (3).
La présente invention concerne un procédé d'installation d'un joint de tambour (2), une coque réticulée en acier et un procédé de construction d'une unité d'assemblage. Le procédé comprend les étapes consistant à : localiser, tout d'abord, le point de projection du point central de la surface inférieure du joint de tambour (4) sur le sol, et installer un cadre de gabarit vertical (6) ; puis localiser le point de projection du point central de la surface inférieure du joint de tambour (4) sur la surface supérieure du cadre de gabarit vertical (6), et souder une nervure de positionnement centrale (8) ; placer le point central de la surface inférieure d'un joint de tambour auxiliaire sur la nervure de positionnement centrale (8), faire tourner le joint de tambour auxiliaire de telle sorte que la position spatiale de la surface supérieure du joint de tambour auxiliaire chevauche la position spatiale du joint de tambour, et souder la barre d'armature de positionnement (3) sur le cadre de gabarit vertical (6) ; remplacer le joint de tambour auxiliaire par le joint de tambour (2), et souder et fixer le nœud de tambour (2) et la barre d'armature de positionnement (3). Le joint de tambour (2) peut être rapidement positionné par la mise en place d'abord du joint de tambour (2) au moyen du joint de tambour auxiliaire, puis par le remplacement du joint de tambour auxiliaire par le joint de tambour (2). Le joint de tambour (2) peut être positionné avec précision par la localisation du point de projection du point central de la surface supérieure du joint de tambour (4) et la transformation du point de projection à l'aide de la barre d'armature de positionnement (3).
一种鼓节点(2)的安装方法、钢结构网壳及其拼装单元的施工方法,先找出鼓节点下表面中心点(4)在地面上的投影点,并安装竖向胎架(6);然后找出鼓节点下表面中心点(4)在竖向胎架(6)顶面上的投影点,并焊接中心定位筋(8);再将辅助鼓节点的下表面中心点置于中心定位筋(8)上,旋转辅助鼓节点,使辅助鼓节点的上表面与鼓节点的空间位置重合,并在竖向胎架(6)上焊接定位钢筋(3);用鼓节点(2)替换辅助鼓节点,并将鼓节点(2)与定位钢筋(3)焊接固定。先通过辅助鼓节点找到鼓节点(2)的位置,再用鼓节点(2)替换辅助鼓节点,可以实现鼓节点(2)的快速定位;通过在竖向胎架(6)顶面上找出鼓节点下表面中心点(4)的投影点,再通过定位钢筋(3)进行转换,可以实现鼓节点(2)的精确定位。
DRUM JOINT INSTALLATION METHOD, STEEL RETICULATED SHELL, AND ASSEMBLY UNIT CONSTRUCTION METHOD
A drum joint (2) installation method, a steel reticulated shell, and an assembly unit construction method. The method comprises: firstly locating the projection point of the central point of the lower surface of the drum joint (4) on the ground, and installing a vertical jig frame (6); then locating the projection point of the central point of the lower surface of the drum joint (4) on the top surface of the vertical jig frame (6), and welding a central positioning rib (8); placing the central point of the lower surface of an auxiliary drum joint on the central positioning rib (8), rotating the auxiliary drum joint such that the spatial position of the upper surface of the auxiliary drum joint overlaps with the spatial position of the drum joint, and welding the positioning rebar (3) on the vertical jig frame (6); replacing the auxiliary drum joint with the drum joint (2), and welding and fixing the drum node (2) and the positioning rebar (3). The drum joint (2) can be quickly positioned by firstly locating the drum joint (2) by means of the auxiliary drum joint and then replacing the auxiliary drum joint with the drum joint (2). The drum joint (2) can be accurately positioned by locating the projection point of the central point of the top surface of the drum joint (4) and transforming the projction point by using the positioning rebar (3).
La présente invention concerne un procédé d'installation d'un joint de tambour (2), une coque réticulée en acier et un procédé de construction d'une unité d'assemblage. Le procédé comprend les étapes consistant à : localiser, tout d'abord, le point de projection du point central de la surface inférieure du joint de tambour (4) sur le sol, et installer un cadre de gabarit vertical (6) ; puis localiser le point de projection du point central de la surface inférieure du joint de tambour (4) sur la surface supérieure du cadre de gabarit vertical (6), et souder une nervure de positionnement centrale (8) ; placer le point central de la surface inférieure d'un joint de tambour auxiliaire sur la nervure de positionnement centrale (8), faire tourner le joint de tambour auxiliaire de telle sorte que la position spatiale de la surface supérieure du joint de tambour auxiliaire chevauche la position spatiale du joint de tambour, et souder la barre d'armature de positionnement (3) sur le cadre de gabarit vertical (6) ; remplacer le joint de tambour auxiliaire par le joint de tambour (2), et souder et fixer le nœud de tambour (2) et la barre d'armature de positionnement (3). Le joint de tambour (2) peut être rapidement positionné par la mise en place d'abord du joint de tambour (2) au moyen du joint de tambour auxiliaire, puis par le remplacement du joint de tambour auxiliaire par le joint de tambour (2). Le joint de tambour (2) peut être positionné avec précision par la localisation du point de projection du point central de la surface supérieure du joint de tambour (4) et la transformation du point de projection à l'aide de la barre d'armature de positionnement (3).
一种鼓节点(2)的安装方法、钢结构网壳及其拼装单元的施工方法,先找出鼓节点下表面中心点(4)在地面上的投影点,并安装竖向胎架(6);然后找出鼓节点下表面中心点(4)在竖向胎架(6)顶面上的投影点,并焊接中心定位筋(8);再将辅助鼓节点的下表面中心点置于中心定位筋(8)上,旋转辅助鼓节点,使辅助鼓节点的上表面与鼓节点的空间位置重合,并在竖向胎架(6)上焊接定位钢筋(3);用鼓节点(2)替换辅助鼓节点,并将鼓节点(2)与定位钢筋(3)焊接固定。先通过辅助鼓节点找到鼓节点(2)的位置,再用鼓节点(2)替换辅助鼓节点,可以实现鼓节点(2)的快速定位;通过在竖向胎架(6)顶面上找出鼓节点下表面中心点(4)的投影点,再通过定位钢筋(3)进行转换,可以实现鼓节点(2)的精确定位。
DRUM JOINT INSTALLATION METHOD, STEEL RETICULATED SHELL, AND ASSEMBLY UNIT CONSTRUCTION METHOD
PROCÉDÉ D'INSTALLATION DE JOINT DE TAMBOUR, COQUE RÉTICULÉE EN ACIER ET PROCÉDÉ DE CONSTRUCTION D'UNITÉ D'ASSEMBLAGE
鼓节点的安装方法、钢结构网壳及其拼装单元的施工方法
LIAO JI (author) / WANG JUN (author) / LIU YIBO (author) / LI GUOYIN (author) / TONG SHUFENG (author) / LI XUJIAN (author) / QIN HAN (author) / YIN JIE (author) / WANG XIAOFENG (author)
2023-11-02
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2021
|Fast-assembly type spherical wood reticulated shell connecting joint and construction method
European Patent Office | 2024
|Large-span reticulated shell steel structure construction method
European Patent Office | 2024
|